My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2300501 thru PS-2301000_ - PS-2300696
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2023
>
PS-2300501 thru PS-2301000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2300501 thru PS-2301000_ - PS-2300696
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:08:47 PM
Creation date
9/26/2023 2:03:55 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2300696
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2023
Notes2
Manthey Rd. and Leo Giron Rd. Intersection, Leo Giron Rd. North to Yettner Rd.
Address
1445 Van Ness Ave., Fresno,CA 93721
Application
AT&T-Fresno (Valley Permit Desk)
Type
Bore(up to 12 inch Dia); (N) Pole Install
Supplemental fields
Cross Ref
PWP730079
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
S. LEO GIRON DR AND YETTNER RD <br />-AERIAL <br />WORK AREA 2 OF 3 <br />PHASE 2 OF 5 <br />1 1 5 / N/O CIL YETTNER RD <br />I <br />O O <br />00 <br />°26:00000 <br />A / <br />END <br />ROAD WORK <br />/ BE N <br />PREPARED <br />ROAD <br />WORK <br />LOCATION MAP <br />WORK AREA <br />4 <br />n <br />v N _ <br />Q <br />rh f' <br />r. <br />v <br />N <br />367 YETTNER RD <br />END <br />ROAD WORK <br />G20-2 <br />r, <br />00' BUFF <br />POLE <br />� BE N <br />PREPARED <br />EuooER y <br />�� ROP➢ WORK <br />G20-2 <br />sr°P 25 S. LEO GIRON DR <br />0 <br />344 YETTNER RD <br />POLE3' U <br />FOR TEMPORARY TRAFFIC BREAK. <br />FEE <br />ESTIMATED TIME OF COMPLETION <br />J—( <br />IS 5 TO 10 MINUTES. <br />FLAGGERS SHALL REMAIN IN <br />COMMUNICATION VIA RADIO AT <br />,{' <br />ALL TIMES. <br />y <br />=TYPEIW/SIGN <br />/ <br />=EXISTING SI ON <br />jd; <br />/ <br />A72 <br />HOURS PRIOR TOS RT OFE WORK.. <br />BE <br />ISSUE DATE <br />0 at&t 1 10-06-20 <br />r -1 <br />MAINTAIN DRIVEWAY ACCESS <br />ATALLTIMES <br />PHASE 2 OF 5 <br />TYPE OF CONSTRUCTION: <br />AERIAL <br />JOB NUMBER: A01DE2M <br />PAGE: TC -3 OF TC 7 <br />=PORTABLE FLESH ING BEACON (P EB) <br />FEE <br />=TYPE III BARRI CADE WSSIGN (rH x 4'W) <br />J—( <br />=TYPE II BARRI CADE WGN (3'Hx2W <br />=28'(11 cm TRAFFIC CONES W/13' Rm REFLECTIVE SLEEVE <br />FOR OAV NI GHT USE OR DEUNFA 0R IF DAV USE ONLY <br />T <br />= TRAFFIC CONE PATH CLIP ON SIGN <br />y <br />=TYPEIW/SIGN <br />I <br />=EXISTING SI ON <br />QS <br />— SIGNALIZED INTERSECTION <br />5yW <br />= FLASHING ARROWBOARD <br />T <br />= HIGH LEVEL WARNING DEVICE(FIAGTREE) <br />=FLAGGED <br />TANSAT <br />= TOWAWAV NO STOPPING MY TIME <br />® <br />= EXISTING DRIVE.NAY <br />® <br />= WORKZONE(ACTIVITY AREA) LIMITS <br />y <br />= DIRECTION OF TRAFFIC <br />r -1 <br />MAINTAIN DRIVEWAY ACCESS <br />ATALLTIMES <br />PHASE 2 OF 5 <br />TYPE OF CONSTRUCTION: <br />AERIAL <br />JOB NUMBER: A01DE2M <br />PAGE: TC -3 OF TC 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.