My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2302501 thru PS-2303000_ - PS-2302966
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2023
>
PS-2302501 thru PS-2303000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2302501 thru PS-2303000_ - PS-2302966
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2024 7:45:56 AM
Creation date
10/3/2023 9:38:19 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2302966
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2023
Notes2
SS Lincoln Rd. 750' WO Gettysburg Pl.
Address
3043 Gold Canal Dr. STE 201
Application
Geosyntec Consultants, Inc/Tim Davis
Type
Bore (over 12 inch Dia)
Supplemental fields
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C 1l1f ORN1• <br />Water Boards <br />Central Valley Regional Water Quality Control Board <br />3 August 2023 <br />Joe Niland <br />Lincoln Center Environmental Remediation Trust <br />3043 Gold Canal Drive, Suite 201 <br />Rancho Cordova, CA 95670 <br />GAVIN NEWSOM <br />GOVERNOR <br />JARED <br />BBLLUMENFELO <br />FOR <br />ENVIRONMENTAL PROTECTION <br />REVIEW OF WELL DESTRUCTION WORK PLAN, LINCOLN VILLAGE SHOPPING <br />CENTER, STOCKTON, SAN JOAQUIN COUNTY <br />Central Valley Regional Water Quality Control Board (Central Valley Water Board) staff <br />reviewed the 27 June 2023 Well Destruction Work Plan (Work Plan) prepared by <br />Geosyntec on behalf of the Lincoln Center Environmental Remediation Trust (Trust) for the <br />Lincoln Village Shopping Center in Stockton (Site). The Work Plan summarizes the <br />rationale and approach for selection of wells that no longer benefit the project and can be <br />destroyed. <br />The Work Plan states there are over 100 piezometers, groundwater monitoring, extraction, <br />injection, and other wells at the Site. The Trust is proposing to iteratively decommission <br />wells at the Site that no longer provide a benefit in assessing the remedy. The Work Plan <br />includes a decision tree to provide a framework for the process to evaluate the wells <br />proposed for destruction. The wells proposed for destruction include: <br />• 8 wells previously identified for destruction in 2020, <br />• 10 piezometers near the edge of the plume, and <br />• 22 wells previously used for Enhanced Reduction Dechlorination (ERD) injections. <br />The Trust evaluated each of the 40 wells according to the decision tree and found that they <br />met the following conditions: <br />• Either redundant to another equivalent well; exhibited stable or decreasing <br />concentrations for about two years; or damaged beyond repair. <br />• Not needed to define the plume extent or boundary. <br />• Not located within the current plume footprint (or treatment zone). <br />• Not needed to evaluate remedy performance. <br />• Does not provide groundwater flow information relevant to the remedy. <br />• Well destruction does not impact nearby wells (nested/co-located wells) that are <br />needed for assessment. <br />KARL E. LONGLEV SCD, P.E., CHAIR I PATRICK PULUPA, ESQ., EXECUTIVE OFFICER <br />11020 Sun Center Drive #200, Rancho Cordova, CA 95670 1 www.waterboards.ca.gov/centralvalley <br />
The URL can be used to link to this page
Your browser does not support the video tag.