Laserfiche WebLink
All Traffic Control Will Meet MUTCD Standards <br />Safe Access to Pedestrians to be Maintained at all Times <br />+�.., =MAINTAIN 20ft MINIMUM <br />hhh <br />FOR TWO WAY TRAVEL <br />*=NO PARKING SIGNS TO BE <br />PLACED 48hrs PRIOR TO SET UP <br />x Dr-O� <br />D D(n�= <br />0 00M <br />Geosyntec <br />Stanton Way / Cameron Way / McLellan Way / <br />Sheridan Way / Calhoun Way <br />Stockton, CA <br />Shoulder Closure <br />Table 6C-1, Suggested Advance Warning Sign Spacing (2014 CAMUTCD) <br />SPEED <br />LANE <br />SHIFTING SHOULDER <br />250 <br />250 <br />Distance Between Signs" Feet <br />35 245 <br />LIMIT <br />TAPER <br />TAPER TAPER <br />40 320 160 <br />Road Type <br />Yp <br />Urban: More than 40mph <br />350 350 350 <br />45 540 270 <br />180 <br />50 600 300 <br />200 <br />Rural <br />A B C <br />55 660 330 <br />MPH <br />Expressway/Freeway <br />1000 1000 1000 <br />60 720 360 <br />Urban. 25mph or less <br />100 100 100 <br />1 260 <br />25 <br />125 <br />63 42 <br />Mh 2 h <br />RESPONSIBLE PARTY <br />(CONTRACTOR) <br />ONSITE CONTACT: <br />PHONE NUMBER: <br />30 <br />180 <br />90 60 <br />Shoulder <br />Taper <br />r � <br />M M <br />n M <br />0_ <br />Oc <br />to r <br />M0 <br />0M <br />PHASE #: 2/3 <br />PAGE #: 1/1 <br />LEVEL:O 2 3 <br />(Circle one) <br />www.invarion.com <br />ISI <br />Drawn On 08/22/23 <br />Revision (1) <br />CITY TCP No: IAPPROVED FOR CITY PORTIONS ONLY <br />BY: <br />DATE: <br />NOT TO SCALE <br />Urban. ore CIH an 5mp <br />to 40m h <br />250 <br />250 <br />250 <br />35 245 <br />123 <br />82 <br />40 320 160 <br />107 <br />Urban: More than 40mph <br />350 350 350 <br />45 540 270 <br />180 <br />50 600 300 <br />200 <br />Rural <br />500 500 500 <br />55 660 330 <br />220 <br />Expressway/Freeway <br />1000 1000 1000 <br />60 720 360 <br />1 240 <br />65 780 390 <br />1 260 <br />Z WW LZ� <br />TRAFFIC SAFETY <br />Avila TS #: <br />PERMIT # / CAPITAL <br />PROJ. # <br />TOTAL # OF DAYS: <br />WORK HOURS: <br />START DATE: <br />END DATE: <br />DAILY WORKING DAYS <br />(Circle one) <br />RESPONSIBLE PARTY <br />(CONTRACTOR) <br />ONSITE CONTACT: <br />PHONE NUMBER: <br />Contractor: Geosyntec <br />Shoulder <br />Taper <br />r � <br />M M <br />n M <br />0_ <br />Oc <br />to r <br />M0 <br />0M <br />PHASE #: 2/3 <br />PAGE #: 1/1 <br />LEVEL:O 2 3 <br />(Circle one) <br />www.invarion.com <br />ISI <br />Drawn On 08/22/23 <br />Revision (1) <br />CITY TCP No: IAPPROVED FOR CITY PORTIONS ONLY <br />BY: <br />DATE: <br />NOT TO SCALE <br />