Laserfiche WebLink
Figure 6H-6. Shoulder Work with Minor Encroachment (TA -6) <br />DV3HV - �...•� <br />1faDM T <br />aroa <br />W20-1 <br />G2C-2 <br />]IaDA DYDa �� <br />DH3 T <br />. :d <br />Typical Application 6 <br />J6 RoaD 620-2 <br />(opntxial) <br />Note: See Tables 61-1-2 and <br />6H-3 for the meaning <br />of the symbols and?or <br />letter codes used in <br />this figure. <br />Truck -mounted <br />attenuator <br />(optional) <br />113 L <br />A <br />J6 r <br />Bufferspace <br />(optional) <br />W20-1 <br />ROAD <br />WORT( <br />AHEAD <br />California Resource Company - Union Island 12" Gas Pipeline Mechanical Integrity Inspection. Smart Pigging Operation <br />requiring setting (AGM) Above Ground Monitoring Stations. Typical temporary setting of AGM 1- 2 Hours. <br />