Laserfiche WebLink
m <br />m <br />M <br />fO <br />r <br />00 <br />O <br />SEE GENERAL NOTES ON COVER PAGE. <br />11t <br />11 tlt <br />AHEAD <br />y <br />-0 a 4 <br />,00' <br />alatt y�} <br />NWilson Way _— <br />— « — — — —— — <br />� r <br />y y - <br />y y y <br />CITY OF STOCKTON <br />_—— ------~ — _ — <br />f <br />Iit <br />HEAD <br />INat <br />100 <br />r <br />_ SNE <br />m c,nseo + i } <br />.o��nwz ion ' <br />I t 2s0— <br />{. ---- <br />f <br />p� ~ .�;� - <br />ork Are <br />o <br />/I® y y <br />y mi <br />11I <br />yc ° <br />cSroNseE oA <br />cSroNseE <br />o <br />laI <br />t <br />250 ,00 <br />yltl: <br />3 <br />m <br />4 t t <br />dill <br />Sycamore Avenue <br />-Contractor shall maintain access to all driveways, pedestrians & emergency <br />vehicles within the affected area's, unless otherwise noted. <br />- Contractor shall maintain a safe "ADA" compliant accessible pedestrian <br />travel way at all times & have a designated escort to assist if needed. <br />- Contractor shall perform all appropriate measures to uphold the <br />safety of any bicyclists within the affected areas. <br />- Contractor shall post temporary "No Parking" signage within all affected areas 72 <br />hours before the start of work. notify all affected residents/businesses. <br />- Contractor may remove or reduce the control zone <br />when the affected area is no longer needed. <br />- Place W20-1 sign on any side street or high volume driveway that is within <br />the traffic control boundaries. <br />Page No. 6 of 13 <br />COUNTY <br />N Wilson Way �— <br />f f 35 mph �— <br />y <br />y y y <br />Channelizers/Delineators (+/-) <br />Flashing Arrow Sign <br />Sign Stand <br />Work Area <br />I Manifest <br />202x Channelizers/Delineators(+/-) <br />46 x Sign Flags <br />28 x Sign Stand <br />11 x VV20-1 Road Work Ahead <br />4x C30 Lane Closed <br />3 x W11-1(CA) Share The Road Combo <br />2x Flashing Arrow Sign <br />2 x M4 -10L Detour Left <br />2 x VV20-5L Left Lane Closed Ahead <br />2 x VW -2L Left Lane Merge <br />1 x R3-2 No Left Turn <br />1 x R9-11A.L Sidewalk Closed Cross Here <br />1 x R9-11A.R Sidewalk Closed Cross Here <br />1 x SC3 Detour Straight <br />1 x W1 -3L Lane Shift Left <br />West Valley Construction WORKING HOURS - Contractor Shall Maintain Access To All Residents, Businesses, agFF <br />Utility Access, Repairs &Improvements Job/P.O. # - Pedestrians & Emergency Vehicles At All Times �POftgF ED 6Y <br />r ).,X <br />�` SiE LE NEL 50N ON Wilson Way Date Created - 4/17/2023 Contractor may implement the use of flagger(s) Men needed or directed depending one� znvz°ozi <br />vehicle speeds, volume & road conditions to help slow or stop traffic. C9A & W3-4 signage <br />T City Of Stockton, CA Drawing Not To Scale in addition to this plan, shall be spaced in all directions (See "Table A" & General Notes). rssr <br />ENGINEER & DESIGN DISCLAIMER: NATIONAL TRAFFIC DESIGNS TAKES NO RESPONSIBILITYS IN THE CASE OFANYACCIDENT, INJURYOR DEATH FROM THE USE OF THESE PLANS. NATIONAL TRAFFIC DESIGNS <br />HAS PREPARED THESE PLANS AS A DRAFT TO BE USED IN THE DESCRETION OF THE CONTRACTOR & THOSE CERTIFIED ON SITE FOLLOWING ALL AGENCY GUIDLINES. <br />