Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />P.O. BOX 1810-1810 E. HAZELTON AVENUE PermitNo: PS -2103961 <br />STOCKTON, CALIFORNIA 95201 Date Issued: 06/14/2023 <br />(209) 468-3000 Exp. Date: 06/13/2024 <br />FAX # (209) 468-9324 <br />Project No: PWP110005 <br />APN No: 15721028 <br />DRIVEWAY ENCROACHMENT PERMIT <br />To: IvIED1NA, OCTA V I0 <br />5553 E. WASHINGTON AVE. <br />STOCKTON, CA 95215 <br />Location: <br />hi compliance with your request of ] 2/02/2021, and subject to all the terms, conditions and resri•icfions written below or printed as general or <br />special provisions on any part of this form. <br />Permission is hereby granted to construct One driveway w/o pipe shown on <br />Permit Application No. PS -2103961 Quad: SE <br />Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian and/or <br />vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the Permittee for the protection of the public in <br />accordance with the current Caltrans Standard Specifications. <br />A(n) O inside diameter per section 62 of the current Caltrans Standard Specifications, ALTERNATIVE PIPE AND PIPE ARCH <br />CULVERTS, shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to clear toe of <br />approach fill or headwalls. <br />The entire area of driveway approach(es), include flares for turning and /or paved frontage(s), from the edge of roadway pavement to <br />right-of-way (front property) line shall be surfaced with a two inch (2") minimum of asphalt concrete over a (4 inch) minimum of compacted <br />layer of three-quarter inch (3/4") maximum size aggregate base material (road gravel) conforming to Class 2 Aggregate Base specified in <br />Section 26 of the current Caltrans Standard Specification, or with a four inch (4") minimum of portland cement concrete. <br />If portland cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and along property line. Surface <br />grades of approach(es) and/or to open ends of pipe. No ponding or puddles on pavement surface shall be allowed. <br />Permittee shall call the Department of Public Works, Field Engineering Division (Permit Inspections) at (209) 953-7421 at least two <br />business days prior to beginning and completion of any work within the County right-of-way. After completion of the work <br />permitted herein, all debris, lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike <br />condition. <br />Driveway(s) shall be complete prior to occupancy of the residence, <br />but not to exceed expiration date. <br />Kris Balaji, Director <br />Department of Public �Wm•lcs <br />Permit section <br />FORMS: SS/WW,R-29 <br />