Laserfiche WebLink
M <br />Z <br />O <br />GENERAL NOTES: <br />1. Existing highway and utility facilities must remain in place unless otherwise noted. <br />2. Existing trees, shrubs, fences, mailboxes and other frontage improvements must <br />remain in place unless otherwise noted. <br />3. The Contractor will be responsible for adequately scheduling inspection and testing <br />of all facilities constructed under this contract with a minimum 24 hour notice to <br />the County. All testing must conform to the Standard Specifications. All re—testing <br />will be paid by the Contractor. <br />4. The Contractor must obtain an Encroachment Permit from Caltrans, City of Lathrop, <br />City of Stockton and City of Tracy and other agencies necessary for traffic control <br />or any work outside of the County's jurisdiction. Payment for this will be <br />considered to be included in the various items of work. <br />5. The Contractor must enter into an Agreement with the Union Pacific Railroad for <br />any work within the Railroad's right—of—way. See Section 5-1.20C, "Railroad <br />Relations" of the Specifications for further details. <br />6. The Contractor must obtain all permits and licenses required for the construction <br />and completion of the project, and must perform all work in accordance with the <br />requirements and conditions of all permits and approvals applicable to the project. <br />7. The Contractor must exercise due caution and carefully preserve survey bench <br />marks, control points, reference points and all survey stakes, and must bear all <br />expenses for replacement and/or errors caused by their unnecessary loss or <br />disturbance. <br />8. Areas in County right—of—way used by Contractor for staging and/or storage of <br />materials will be approved by the Engineer. The areas utilized by the Contractor for <br />staging and/or storage area must be restored to their original condition. Any <br />damages or unclean conditions to staging or storage areas must be repaired at <br />the Contractor's own expense. It will be the Contractor's responsibility to obtain <br />permission from the property owner to stage equipment or store materials on <br />private property. The Contractor must provide a letter of release from the property <br />owner of the areas utilized for staging and/or storage of materials. <br />9. Placement of "No Parking" signs/barricades must be placed no less than 72 hours <br />prior to work. <br />COUNTY OF SAN JOAQUINJ INO SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Jonathan Curry o8l 7 6, <br />q <br />Const <br />Lip/EP Limits of Clearing and Grubbing EP <br />Existing Limits of Crack Treatment (Type 3) <br />PCC Curb, I <br />Gutter & <br />Sidewalk I Existing Existing <br />Roadway Surface <br />--------- - L -- --------- <br />---------------- ----------------I <br />SHOULDER DETAIL SHOULDER DETAIL <br />with Curb & Gutter <br />GENERAL NOTES AND TYPICAL <br />SECTION <br />CHECKED I DATE <br />TYPICAL SECTION <br />For all project roadways <br />without Curb & Gutter <br />RECORD DRAWING <br />Corrections By <br />No Changes By G� <br />Date ____l.. --fi_ 1 <br />;env Person Using This Drawing Should De ify <br />Al.' Information By Inspecting The Site Of Vi'oe <br />CRACK SEAL 2017-2018 <br />Supervisorial Districts 1, 2, 3, 4 and 5 <br />Sheet No. <br />2 of 6 <br />