Laserfiche WebLink
SPECIAL PROVISIONS <br />Winter Weather Utility Work <br />1. SUPERVISION: The utility company (permittee) shall to nish full-time supervision of all work to insure <br />compliance with the permit provision. <br />I START OF WORK: No work within the County right-of-way shall be started until the utility company <br />representative has made an evaluation of weather conditions and has determined the work can be <br />accomplished under the provisions of the permit. <br />3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of work, <br />and if inadvertently tracked onto the road travel way shall be removed immediately. <br />4. DAILY RESTORATION: Private driveways and road intersections shall be restored daily. <br />S. WEATHER -TIGHT CONDITIONS: All trenches shall be filled and compacted, ditches and other <br />drainage facilities regarded and opened, and the entire work area restored to weather -tight condition prior to <br />any rain. <br />x:�xcrsoecxniexrs�cc�c,m rro��s�oo: �c��cro.,a,��<�, rorod�c��wm,c<woan<, r,o���m��s.aoc= <br />