Laserfiche WebLink
J <br />J <br />V <br />const <br />Limits of Clearing and Grubbing and Mailbox Relocation <br />EP/Lip EP/Lip <br />19'-21'- - - - - - 19'--21' <br />L_ t- <br />O O <br />--- -- —�°c Match Existing <br />U Match Existing Slopvw <br />— -- — <br />*Remove 0.25' <br />Subbase, Base, <br />and Roadway <br />Surfacing <br />and Place 0.25' <br />HMA <br />EP/Lip <br />EL <br />O <br />c <br />O <br />*Remove 0.25' <br />Subbase, Base, <br />and Roadway <br />Surfacing <br />and Place 0.25' <br />HMA <br />Existing <br />Roadway TYPICAL SECTION <br />Grigsby Place: Sta 12+35 to Sta 24+54 <br />- Existing CG&S to <br />-_Remain in Place <br />unless Otherwise <br />noted (Typ). <br />-- Limits of Clearing and Grubbing and Mailbox Relocation- <br />---EP/Lip <br />--- -14'--39' ---- -- <br />14'-39'--- <br />E <br />4'-39'-- <br />E <br />L <br />O <br />`Match ExistingSloane _ Match Existi�- Slope, w <br />— — r <br />- - - Existing CG&S to <br />Existing -Remain in Place <br />Roadway TYPICAL SECTION unless Otherwise <br />Swain Court: Sta 10+13 to Sta 12+25 noted (Typ). <br />C�] <br />COUNTY OF SAN JOAQJIN <br />DRAWN BY DATE PROJECT ENGINEER <br />Scott Yamada 4/25/23 Se-SS6vw\5 <br />*At C&G, Remove 0.25' Subbase, <br />Base, and Roadway Surfacing <br />below LIP <br />GENERAL NOTES: <br />1. 0.25' HMA Overlay must be placed in two (2) layers of approximately equal thickness. <br />2. Core data is unavailable; however, anticipate varying layers of base and roadway surfacing materials within <br />the sectional planing depth of the existing roadway. <br />3. Existing highway and utility facilities must remain in place unless otherwise noted. <br />4. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in place unless <br />otherwise rioted. <br />5. Existing drainage facilities must remain in place unless otherwise noted. The Contractor must conduct <br />earthwork operations so as not to modify or obstruct the existing drainage. <br />6. Hand grinding of roadway surfacing will be required at locations where existing highway and utility <br />facilities are within the Remove Subbase, Base, and Roadway Surfacing and Pavement Repair limits. <br />Payment for hand grinding will be considered as included in the contract unit price paid for Remove <br />Subbase, Base, and Roadway Surfacing. <br />7. The Contractor will be responsible for adequately scheduling inspection and testing of all facilities <br />constructed under this contract with a minimum 24—hour notice to the County. All testing must conform <br />to the Standard Specifications. All re --testing will be paid by the Contractor. <br />8. The Contractor must place temporary ramps to affected business driveways at the end of each working <br />day if a drop off greater than 0.15' exists. Ramp materials must be consistent with that of the roadbed <br />(or roadway) surface that is to be placed upon. Payment for this work will be considered as included in <br />the various items of work involved. <br />9. The Contractor must exercise due caution and carefully preserve survey bench marks, control points, <br />reference points and all survey stakes, and must bear all expenses for replacement and/or errors caused <br />by their unnecessary loss or disturbance. <br />10. Prior to commencing any work, it will be the Contractor's responsibility to have each utility company <br />locate in the field their main service lines and laterals. The Contractor must notify members of the <br />Underground Service Agency (USA) 48 hours in advance of performing excavation work by calling the toll <br />free number (1 800-642 2444) or 811. <br />11. The Contractor must field verify all existing highway and utility facilities' locations and depths. It will be <br />the Contractor's sole responsibility to locate and protect all existing highway and utility facilities, so that <br />no damage results to them during the performance of this contract. The Contractor will be required to <br />cooperate with other contractors and utility companies installing new structures, utilities and services to <br />the project. Payment for this work will be considered to be included in the various items of work <br />involved. <br />12. All new Curb, Gutter and Sidewalk must conform to the existing flowline elevations with a straight grade <br />between conforms unless otherwise noted. <br />13. Install Expansion Joints at beginning and end of new Curb, Gutter and Sidewalk and between new <br />sidewalks and existing driveways. <br />14. Quantity paid for Curb, Gutter- and/or Sidewalk in linear foot is measured along the flowline of the gutter <br />pan. <br />15. The Contractor must obtain an Encroachment Permit from the City of Stockton for placement for <br />performing traffic, control or placing traffic control devices (or performing work) in their jurisdiction(s)- <br />Payment for this will be considered to be included in the various items of work involved. <br />NO SCALE GENERAL NOTES AND <br />TYPICAL SECTIONS <br />DATE CHECKED DATE <br />4/25/23 �e bl�ew� -- 4/25/23 1 <br />LINCOLN VILLAGE STREETS RESURFACING 2023( Sheet No. <br />(Grigsby Place: Stockton City Limits to Benjamin Holt Drive, Swain Court: Swain Road to North End) 2 of 5 <br />RECORD DRAWING <br />-D <br />ME soft oft <br />D <br />m <br />Any Pr1N11 !Jolly TUD Dr nvft SAouid Weft <br />AA InfammOm ft 111spoW" The Ms Ot win <br />M <br />C�] <br />COUNTY OF SAN JOAQJIN <br />DRAWN BY DATE PROJECT ENGINEER <br />Scott Yamada 4/25/23 Se-SS6vw\5 <br />*At C&G, Remove 0.25' Subbase, <br />Base, and Roadway Surfacing <br />below LIP <br />GENERAL NOTES: <br />1. 0.25' HMA Overlay must be placed in two (2) layers of approximately equal thickness. <br />2. Core data is unavailable; however, anticipate varying layers of base and roadway surfacing materials within <br />the sectional planing depth of the existing roadway. <br />3. Existing highway and utility facilities must remain in place unless otherwise noted. <br />4. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in place unless <br />otherwise rioted. <br />5. Existing drainage facilities must remain in place unless otherwise noted. The Contractor must conduct <br />earthwork operations so as not to modify or obstruct the existing drainage. <br />6. Hand grinding of roadway surfacing will be required at locations where existing highway and utility <br />facilities are within the Remove Subbase, Base, and Roadway Surfacing and Pavement Repair limits. <br />Payment for hand grinding will be considered as included in the contract unit price paid for Remove <br />Subbase, Base, and Roadway Surfacing. <br />7. The Contractor will be responsible for adequately scheduling inspection and testing of all facilities <br />constructed under this contract with a minimum 24—hour notice to the County. All testing must conform <br />to the Standard Specifications. All re --testing will be paid by the Contractor. <br />8. The Contractor must place temporary ramps to affected business driveways at the end of each working <br />day if a drop off greater than 0.15' exists. Ramp materials must be consistent with that of the roadbed <br />(or roadway) surface that is to be placed upon. Payment for this work will be considered as included in <br />the various items of work involved. <br />9. The Contractor must exercise due caution and carefully preserve survey bench marks, control points, <br />reference points and all survey stakes, and must bear all expenses for replacement and/or errors caused <br />by their unnecessary loss or disturbance. <br />10. Prior to commencing any work, it will be the Contractor's responsibility to have each utility company <br />locate in the field their main service lines and laterals. The Contractor must notify members of the <br />Underground Service Agency (USA) 48 hours in advance of performing excavation work by calling the toll <br />free number (1 800-642 2444) or 811. <br />11. The Contractor must field verify all existing highway and utility facilities' locations and depths. It will be <br />the Contractor's sole responsibility to locate and protect all existing highway and utility facilities, so that <br />no damage results to them during the performance of this contract. The Contractor will be required to <br />cooperate with other contractors and utility companies installing new structures, utilities and services to <br />the project. Payment for this work will be considered to be included in the various items of work <br />involved. <br />12. All new Curb, Gutter and Sidewalk must conform to the existing flowline elevations with a straight grade <br />between conforms unless otherwise noted. <br />13. Install Expansion Joints at beginning and end of new Curb, Gutter and Sidewalk and between new <br />sidewalks and existing driveways. <br />14. Quantity paid for Curb, Gutter- and/or Sidewalk in linear foot is measured along the flowline of the gutter <br />pan. <br />15. The Contractor must obtain an Encroachment Permit from the City of Stockton for placement for <br />performing traffic, control or placing traffic control devices (or performing work) in their jurisdiction(s)- <br />Payment for this will be considered to be included in the various items of work involved. <br />NO SCALE GENERAL NOTES AND <br />TYPICAL SECTIONS <br />DATE CHECKED DATE <br />4/25/23 �e bl�ew� -- 4/25/23 1 <br />LINCOLN VILLAGE STREETS RESURFACING 2023( Sheet No. <br />(Grigsby Place: Stockton City Limits to Benjamin Holt Drive, Swain Court: Swain Road to North End) 2 of 5 <br />