Laserfiche WebLink
NOTES: <br />1. If the distance between cross—cuts are less then 150' the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br />R-29. <br />3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br />the shoulder or lane, only that area shall be resufaced as shown. <br />4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing. Section 2-5.03B-2. <br />c � <br />a y. <br />� N <br />Uv U <br />C <br />'CV <br />y O � <br />pS O <br />C = a <br />- 3 N <br />N Q <br />Paved Shoulder <br />°t O <br />� L <br />0,0 <br />N U <br />� C <br />7 <br />U <br />N <br />O <br />U <br />TRENCH CUTTING POLICY Approved by: <br />CROSS CUTTING OF No. Re/1? <br />�r COUNTY ROADWAYS <br />COUNTY OF SAN JOAQUIN <br />DB AR1YvffiNf OF P 11C WORKS <br />Working for YOU Date: DEC 2014 Std. Dwg. No. R—H6 <br />1�1 <br />111�� WORK- <br />90 <br />1�1 <br />