My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2203001 thru PS-2203500_ - PS-2203408
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2022
>
PS-2203001 thru PS-2203500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2022_PS-2203001 thru PS-2203500_ - PS-2203408
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 3:29:00 PM
Creation date
11/7/2023 3:26:45 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2203408
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2022
Notes2
3263 E. Cherokee Rd.
Address
PO Box 930, Stockton,CA 95201
Application
Pacific Gas & Electric-Stockton
Type
Trench
Supplemental fields
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
See Note 1 Below <br />Existing <br />6" Mm6" �+ Pavement 6" I+-6" Min <br />—►1 ► <br />(Typ) NO <br />\ See Note 2 Below u11, <br />3'-0" Compact in 12" max 3-0" <br />layers to a min relative <br />------ compaction of 957 --------Var <br />\--------- under pavement and \ -------- <br />Var ? _ — — \' 90% outside pavement. <br />— Compact in 24" max Cp CD+12" <br />layers to a min relative <br />OD/2 compaction of 65%, <br />Compact in 6" layers a <br />to a min relative <br />compaction of 90%. <br />10" Min �C 10" Min 10" Min OD 10" Min <br />QD CO <br />+ 20" Min + 20" Min <br />RIGID CONDUIT FLEXIBLE CONDUIT <br />JIRIES: <br />1. New pavement shall be 1" thicker than existing pavement, minimum <br />of 0.25 Ft. New base shall be 1" thicker than existing base, min of 0.50 Ft, <br />2. Select native material or Imported granular material as approved by the Director <br />of Public Works. Backfill with materials equal to or better than the existing <br />pavement end base in quality. <br />3, Relative compaction of mcteriols shall be tested in cccardance with <br />the State of Colifamia, Dept. of Transportation Testing Manuals, test <br />method No. California 216 or 231, <br />4. All existing pavement shall be neatly cut to line prior to trench excavation, <br />5. Jetting or ponding will be permitted within the street right—of—woy with <br />a 3 year bond, when approved by the Director of Public Works. <br />6. When shown by soil composition and compoctobillty, ninety percent (90%) <br />compaction may be used, when approved by the Director of Public Works <br />7. Special bedding and bockfill requirements may be shown on the plans or <br />specified in the special provisions. <br />Approved by, <br />W/r TYPICAL TRENCH BACKFILL VowivIV& <br />No, Revbian Dead ion Date <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OFMIC WORKS <br />Weft fm YOU Date Dtc sola std. Dwg, No. R•29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.