( 2 3 4 5 6 7 8
<br />9 10
<br />A;
<br />PH
<br />_ng
<br />ae
<br />' ESTIMATING JOB WALK COMPLETED ON 05/11/2022,
<br />RG
<br />OF1
<br />no
<br />PREFERRED METHOD OF CONSTRUCTION TO BE HOS-
<br />MR WIN INSTALLATION AND INSECT FOR SERVICE LEGEND
<br />INAAWIION, PER GC REPRESENTATNE
<br />FACE
<br />�xa- Hl- - INSTALL GAS MAN (SIZE NATO)
<br />3
<br />J,
<br />oRE
<br />m
<br />Ih
<br />-xa xa- IXISTING GAS MAN (SIZE LADLED)
<br />i3
<br />CC
<br />r
<br />a
<br />N
<br />E
<br />�xx�xx- U19ING WS MAN TO BE ABANDONED (SIZE NOTED)
<br />o
<br />9
<br />SIN 3
<br />VICINITY MAP
<br />`�
<br />w
<br />-
<br />" =
<br />---------- - WINE GAS SDMCE (SIZE NOTED)
<br />.o
<br />F
<br />� �
<br />..
<br />Ln
<br />.. w...,,M^..
<br />- E�
<br />U9IING GAS BENCE (SIZE NOTED)
<br />�
<br />o
<br />a
<br />` a � A�e�� IXlmmc Ws sERncE TO BE ABANDONED (SIZE NOTED))
<br />'s�
<br />' �b... SSSS^• ,
<br />,..^ „r»-�° .*' � .,,„,.., •_-------------_ WwpDlc PeNErnary wIBLS
<br />wcnT OF war
<br />PROJECT LOCATION ....,.a,,. „✓^w PPROPERTY ENE (NOT SIGN
<br />a � FACE OF curee
<br />`¢
<br />x,. BALK OF wAu<
<br />�
<br />D,
<br />O
<br />rv^ ax CASE OF PAVEMENT
<br />w Q
<br />.. m SEWER
<br />.,
<br />U G
<br />r7
<br />WATER
<br />w [n -E
<br />�!
<br />�
<br />-Ew
<br />m s`DRu DRAW
<br />L�
<br />¢
<br />`m 9TOAA/SEWER
<br />[D ¢
<br />0 U U
<br />CUT OFF
<br />Q w w
<br />f4i
<br />REPLACE SERVICE
<br />Q OCAP
<br />D
<br />EA
<br />QT CUT, T&TWWSFER SERVICE
<br />© CUT-OFF STRUCK
<br />4
<br />Q UPFAIE SAME
<br />U
<br />�
<br />WORK SUMMARY © PLUMBING NEEDED
<br />Irv9ALL REDUCER
<br />INSTALL 1531' OF 4' PLASTIC HP MAIN 4 EXlmrvG REDUCER
<br />• INSTALL 4477' OF 2' PLACE HP MAIN 11 INSTALL NFL FEET TRANSITION RTING
<br />ABANDON 997' OF 2' STEEL E MIN .. INSTALL COUPLING
<br />E EXISDNB PRESSURE CONTROL FILLING
<br />INOIE_ • ABANDON 66' OF 3' AL E MAIN
<br />CPRE INCLUDES ANODE INSTALLATION ON CPR s INSTALL PRICE CONTROL ITIDNG
<br />ERNEST AVE EM PERSHING AVE AND 6 . ABANDON 16' OF 2' PL HP TWIN o INSTALL CAP
<br />W/O GRANGE AVE. CPR` NNE DUAL
<br />SHOWN ON PAGE 5 (DUAL PAGE). . REPLACE 135 STEP OR ACYL -A BECAME ENO OF MAN MARKER
<br />e
<br />TRANSFER 5 PLASTIC SENSORS TO NEW WIN EXISTING ERE STATION
<br />OCT OFF 5 STEEL OR AI➢YL-A BERNARD N INSTALL ELS STATION
<br />(� INSVEL ELECTRONIC MARKER BALL
<br />C
<br />PROJECT NOTES
<br />e
<br />NW
<br />G
<br />1'. RENEW CORE RR CORROSION REQUIREMENTS AND ENSURE CATS OF CPRF IS AT START CAIS.
<br />4S INSTALL ANDRE
<br />WIRES TO THE STEEL SECTION ON WIRE OTHER SIDE
<br />2 WEA SLOE TIEN ON MICHIGW-CAO WEN (2) M4 M IWRES ANO BOTH STEELCONSTRUCTIONTO
<br />A HMWPE WIRES AND N B RESIID
<br />3: AT INTERSECTION OF MICHIGAN AND MISSION -CAD WEN (2) VORS W BOTH WIRES INTO A F5, CONNECT BOTH WIRES FROM THE WEA SIDE l[I C INSTALL VALUE W/ FRAME AND COVER
<br />ES CON
<br />ESTABLISH E D (T )CIS BASICWIR
<br />4'. AT O OF OXFORD AND WEN (2) $6 HMWPE WIRE AND RCN BOTH WIRES IMO THE RECTIFIER ® EXISTING VALUE W/ FRAME AND OWER
<br />_
<br />LB MAE A D
<br />5: ON BRISTOL -INSTALL (2) SON MAG ANODE IN EACH DP THE (3) OVERT SHOWN IN CPRF DETAIL (DETAIL PAGE). TOTAL OF (B) TRIODES SHELL BE INSTALLED ON BRITTOL
<br />(3) MOM
<br />INSTALL HAZAD
<br />AVE INSTALL THEM VEERELN PS SHOWN IN FIGURE IN 0-13.1.
<br />_
<br />6'. PLEASE NOTE THAT CORNCOACH THAT ARE UPLOADED TO SAP ARE VALID A SECOND CPRF W UPLOADED AN SNON l0 THE EpSTING CPFF AND WAR NOT INTENDED AN T EXISTING HM
<br />-
<br />A REPLACEMENT. BOTH 'PRFs ARE VALID AND DE
<br />D CRUCIAL TO THE DESIGN
<br />BE
<br />o `�
<br />, INSTALL SERVICE TEE
<br />it INSTALL EYE
<br />N EXISTING EN
<br />3
<br />O MANHOLE
<br />GAS NOTES 342-0}IS PLAT MAP & BLOCK NUMBER
<br />I. PRIOR TO SIARDNI WORK, CONTACT NCA_ AREA CORROSION RESPONSE REGARDING CALLING PROTECTION REQUIREMENTS MR II REPEATED? SCANNING ANY SHUTDOWN, ABANDONMENT, OR TO TIES RUN GAS SYSTEM
<br />OHN OF ANY WINS WHICH MAY AFFECT ANY D19RIU REGULATOR STATION. (DE) MAN END CAS WIN
<br />ABANDON IN PLACE:
<br />ALL STEEL TIE-INS, GUT REFS AND CAPPING OF CAST IRON ANO STEEL MAIN PER A-36 MD c -3I.
<br />J. ALL PLASTIC CONNECTIONS TO BE PERFORMED IN ACCORDANCE WITH THE APPROPRIATE PROCEDURES TOLD IN TD-0I70S. DUAL NO. DUAL EIGHT
<br />4. UNLESS OTHERWISE NOTED, CONSTRUCTION TO REFERENCE TG-0125PE9 TO DETERMINE IXImNB STEEL PIPE SPECS. Within forty-five (45) days after the service of a 45 day notice from San Joaquin County Public
<br />d
<br />o
<br />B
<br />POLE NO
<br />s. ALL ARC WELDING Is TO BE PERFORMED w ACCORDANCE WITH THE G'S WELDING CONTROL MANUAL TG-016OM. BEER TO TU-016OP-20 FOR GENERAL WELDING REQUIREMENTSBE
<br />Works to relocate, change grade, construct, use, maintain, change or modify any street
<br />8
<br />6. PURGE MAINS 10' IN DIAMETER &LESS PER GS&S A 33, ATTACHMENT A, PROCEDURE 2 PURGE MAINS GREATER THAN 1O" IN EARLIER PER M&S A -3S, ATTACHMENT A, PROCEDURE 3.
<br />]. ABANDON ALL UNDERGROUND CAS EMITTED PER CLIFF PROCEDURE M-150OP-16 & Gi A-932. improvement or any County -owned utility facilities, Pacific Gas and Electric shall at its sole cost CONTACTS
<br />I
<br />r
<br />e
<br />5. FELLOW ALL MINIMUM INSTALLATION DEPTHS MR CLEARANCES US OTHER FACUTEs FOR TRANSMISSION, DISTRIBUTOR ASD SERVICE PIPE AS OURINED IN ARM A 04. RR JOINT TRENCH
<br />INSTALLATIONS, REFERENCE U.D. STANDARD SEAGA. and expense, begin the necessary work to remove abandoned facilities in conflict. PwuININc WCINEER'. D9ND RYMERS z09 40s-7782
<br />B rvER sNOH SAM 559 640 -ABIs
<br />9. ALL AM RISERS ARE TO BE INSTALLED IN AMORSOMCE WITH CSkS iJ-151. RESPONSIBLE ENGINEER
<br />IO INSTALL METER PROTECTION PER DOM J-95 GPOM SUPEINISOR: RICK MUSK 2119 CO2 -6555
<br />-
<br />-
<br />II. VENT REGULATORS PER BSffi H-93. CORROSION SUPERVISORHAVE DURHAM 925 3831
<br />12 LOCATION CF 919NG MMES PRE APPROXIMOTE CALL UNDERGROUND SCNICES MEET (USA) TO CONTRA
<br />13. CONs1RUCTIOry SHALL REPORT ALL OPERAnONAL cnANc`s IN ACCORDANCE WITH PROCEDURES uAN IN m -4,41P-03.
<br />14 ALL STEEL RISERS ARE TO BE REPLACED WITH NON CORRODIBLE RISERS OR REPLACED BY USING THE RISER INSERT RENEWAL INSTALNHON PER GS&S A-90
<br />IS ALL GRANGE AND MAPS TO BE TESTED PRIOR TO TIE-IN PER G5&5 A 34, IF MAIN TEST DATA Is NOT RECORDED ON OIs DRAWING. PETER TO THE ASSOCIATED OPERATIONAL CHANGE NOCE
<br />�
<br />FOR BERVCE 79 DATA, RFEER TO THE GAS SERVICE RECORD. C' C C C' THE FOLLOWING SCHOOL OR HOSPITAL IS WITHIN
<br />16, INSTALL PLA91C MAIN, SERVICES, & LOCATING WIRE PR 66 A-34, A-90, A-90.2 AE0.3, A-91, A-93, A-93.1, AE3.3, THEE STANDARD TU -0170S, D-34 & CORROSION CONTROL ETJ TATION ETJ C' STATION ETS STATION 500 OF PROPOSELL CGNSTR ICT ON ACTIVITIES ANLL
<br />ID -41815. PLASTIC ABANDONMENT STEEL ABANDONMENT
<br />o. INSTALL ANODES PER CORROSION CONTROL MANUAL Q-13.1. BOB, les) Wo 6s) MAY REQUIRE NOTIFICATION PRIOR TO COMMENCING
<br />IA. INSTALL ELELTROLISIS TEST STATRONS PER CORROSION CONTROL MANUAL ALI AND 0-111. IF PROFIICPL, INSTALL EES 9AHON OR OF THE ROADWAY. ELS BOX (C-5) ER BOX (C-5) TTmT c nrvx c WORK PER THE NATURAL GAS PIPELINE SAFETY ACT :• •:
<br />19. ALL EXCNVANM TO BE PERFORMED PER TD -FAC M, TL-M11Pa01, TGfiB11P-105, TU -0412F-05, AND 10-0621S. STANDBY REQUIRED IF EXCAVATING WTHIN 5 OF A CRUTHAL FACIUTY,
<br />z
<br />CE:STANDARD
<br />¢
<br />o
<br />OF 20 11 (CALIFORNIA AR_1 B3%)
<br />WRING ACTNm THAT MEASURE OR THAT PARALLELS WITHIN 10' OF A CRITRCAL FACWn. CONTACT THE CDNSTRUCRON SUPERMAN
<br />o
<br />P0. NOTIFY SCHOOLS AND HOSPITALS WITHIN 5W' OF DISPOSED EXMVAHON FOR IRS FACILITES A MINIMUM OF 3 DAYS PRIOR TO DIGGING PER AS 1937. MADISON ELEMENTARY SCHOOL
<br />z
<br />21 ANY PIPE REPLACEMENT NA SPLICING TO BE DONE PER TD -4634P-01 & TD-dB34P-02
<br />ME
<br />2 CAMERA INSPECTION (PRE/PCST) NR TRENCHI65 METHODS TO BE PERFORMED PER TR) -4B3^3 -0L sf ZINC uucs sp ZINC Anne
<br />smµom wl"
<br />3. WARNING TAPE Is TO BE INSTALLED IN OPEN TRENCH INSTALLATION OVER SAM PIPELINES IN BOTH TRANSMISSION AND DISTRIBUTION FACILITES. THIS INCLUDES BELL HOLES, EXCAVATIONS FOR 'nn[ Cnxxm IIo q wa Wo ale 'No mNEK p4 JOB DATA
<br />V-
<br />A
<br />REPAR PURPOSES AND RISER REPLACEMENTS PER 6&S L-16. LURE waw ON Aire pm �NINK'AOT CRATE C1Y- STOCKION
<br />e W InsOOIICTon EASE oe Ins ecteJ CATHOLIC PRNECTON IN WORK AREA
<br />24. DNIATICNS FROM THIS APPROVED DESIGN SHALL BE PROCESSED IN ACCORDANCE WITH ID-9014P-05'RID DESIGN CHANCE PROCESS FOR DISTRIBUTOR LINES AND LWL-ASSET FACIMES' p COUNTY SAN JOAQON
<br />2i an Ni on 0mwing. ATTEIIIION FDREMAN
<br />ALL FRENCH SPOILS AND BACKFILL MUST BE USED OR DISPOSED WITH W REQUIRED BY PG&E SPECIFIGOONS AND ANY LOCAL M,, COUNTY OR STATE REQUIREMENTS. WR m[E WR CS
<br />PIAT' 3003024-15A
<br />_
<br />"-
<br />O w FIT
<br />U d 3
<br />26. PG&E ED INSTALERESTORE TEMPORARY AND/OR PERMANENT PANNG IN ACCORHANCE WITH PG&E SPECIRLATICNS ME MY LOCAL CITY, COUNTY OR STATE REQUIREMENTS. D AND' sM WR Rnmc w� AI Corrosion Irvels Sotistoctory per NOICY THE CORROSION LEFT. 46 HOURS 024
<br />CPA 300E ST
<br />a
<br />1
<br />R. STANDEY REQUIREMENTS MUST BE IN ACCORDANCE WITH T0.5911F301, TDS&11FI06 & TD -581 ID -005 WITH WORKING NEAR MY OPTICAL FACURES. P C MAN �I ABANDONED EEL MAIN ?� ABANDONEN PG&E Gas USity StanSON TD -41515. PRIOR TO START OF WORK.
<br />28. MONUMENT PRRCNATION AS REQUIRED BY THE PROFESSIONAL WAN CREDITORS' ACT (BUSINESS MR PROFESSION MDE SUB -SECTION 8700-5505) SECTION 8I7I4 PRIOR TO THE START OF PLANS MAIN STEEL RAN -1 MAI
<br />Tus nervi¢ A meewr m'wa ewuo �F aIc wlF fiLXPSIG
<br />U y ><
<br />nmF
<br />'INSTRUCTION, ALL SURVEY MONUMEN6, WITHIN THE PROJECT LIM05 TROT HAVE THE PCSSIBILEEY OF BEING DAMAGED OR DESTROYED DURING CONSTRUCTOR, MUST BE LOCATED, AND DOE- _ NC% 54 PSIS
<br />eM wrs
<br />REFERENCED BY A MERGER EVD SURVEYOR, AND A CORNED OF RECORD OR RECORD OF SURVEY SHALL BE FILED WHO THE COUNTY SURVEYOR. IF ANY OF THESE SURVEY MONUMENTS ARE W HE wtl0[BllN_wN Oo-snpv-IW¢ 0¢l & (m-ewA-ILS) ATTENTION FOREMAN qpp 35 PSG
<br />NiRnLT
<br />5 Euo msorleE
<br />N_ -No
<br />DESTROYED. MM%R OR COVERER OVER DURING CONSTRUCTOR. A NEW MONUMENT AND MONUMENT BOX MUST THEN BE SET IN ITS PLACE, AT THE ORIGINAL LOCATION, BY A LICENSED UNIT _ T mLwp: sm cMWUR z Qxmmea EmPE,, AS PRIOR TO STARRNC JOB, CONSULT ARLL EZ: 16 -ST -12-C
<br />mrm. wos iamx
<br />xs xCnsew
<br />upRITA
<br />SOMEYOR AND ANOTHER CORNER OF REGARD OR RECORD OF SURJEY RED WILD WE LQUNTY SURVEYED. LIN wnnm w lux u¢ NONER
<br />a mono [rs m o nm' m[ um CORROSION MECHANIC RR LOCATRNG WIRE
<br />eTo
<br />¢
<br />-
<br />CPI
<br />wnr ssIN
<br />CNI WIN _
<br />29. CCNSTROWON MEANS AND METHODS MAY DEVIATE PER FIELD VERIFIED CCNDNONS IN ACCORDANCE WITH LEGAL JURISDICTION REQUIREMENTS IF THERE ARE ANY QUE910N5, CONTACT oxiwune sox
<br />Innw[p�mm WpM °e"A°" • INSTAWTION AND CATHODIC PROTECTION
<br />mp BE m OTE rewocnm w pwamy 7Npt-.0
<br />RESPCNSIALE ENGINEER, m e><Ap
<br />EUIw¢ To Malo u¢u-T EDA b REALRERENTE
<br />L77
<br />-7J
<br />6 5 4 3 2 1 INCH 0 v
<br />
|