My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
B596 - B800
PublicWorks
>
VAULT MAPS
>
Large Plans - LP
>
Drawer B
>
B585 thru
>
B596 - B800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2025 3:04:30 PM
Creation date
11/17/2023 10:30:40 AM
Metadata
Fields
Template:
Large Plans - LP
Project
Project Plans for the Construction on State Highway
Limits
In San Joaquin County About 19KM West of Modesto From 0.1KM West of Service Road Overcrossing to Delta Mendota Canal Bridge
Year
2010
Project Engineer
Juan R. Zuniga
Red Lines
Yes
Supplemental fields
Cross Ref
B596 - B800
DocCategory
Improvement Plans
Type
Construction on State Highway
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
11/20/2023 11:34 AM
Modified:
11/20/2023 11:34 AM
Text:
B624
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
{rc <br />6 <br />EARTHWORK <br />STAGE <br />DESCRIPTION <br />STATION <br />ROADWAY <br />EXCAVA110N <br />EMBANKMENT <br />(N) <br />NOTES <br />' <br />ROM <br />< <br />m3 <br />m3 <br />92.fi <br />AGE 1 <br />BASIN NORTH OF WB ROUTE 132 <br />34+55.6 X <br />40+01.5 X <br />4933 <br />6 <br />ROUTE 132 <br />UNE <br />R U 1 <br />34+23.2 X <br />45+53.0 X <br />2032 <br />18 848 <br />LINE <br />EB <br />LIN - O F -RAMP <br />44+25.6 X <br />49+30.0 6 <br />14 528 <br />26 765 <br />IN LU AIN <br />2 1.8 <br />A" LINE AND "C" LINE W8 ON <br />42+48.6 X <br />46+04.1 'C" <br />49+60.0 A <br />49+30.0 "C" <br />16 ]58 <br />29 5]4 <br />INCLUDES BASINS <br />5]26.2 <br />VERNALIS ROAD <br />27+50.0 F <br />32+00.0 F <br />]5 <br />5033 <br />INCLUD S BIRD Rd INTERSECTION <br />] 4 <br />W8 ROUTE 132 <br />49+60.1 X <br />60+81.4 X <br />59]4 <br />1622 <br />1.1 <br />52+99.000 TO 60+81.354 EB <br />"D" LINE - EB ON-RAMP AND <br />50+8].5 D <br />54+75.8 "X" <br />54+]5.8 D <br />5]+30.0 "X" <br />tp 943 <br />8049 <br />219.9 <br />BASIN SOUTH OF EB ROUTE 132 <br />58+41.4 X <br />59+]B.5 X <br />983 <br />4 <br />L-6 <br />]49 <br />Tem BIRD ROAD <br />9+80.0 <br />1 +48.3 TI <br />26 <br />6 <br />648 <br />1142.0 <br />358.2 <br />132 <br />595.8 <br />918.6 <br />1226 <br />1128 <br />A 2 <br />BIRO ROAD NORTH OF ROUTE 132 <br />14+91.] E <br />18+10.0 E <br />6624 <br />INCWDES WB RAMP INTERSECTION <br />318.9 <br />BIRD ROAD SOUTH OF ROUTE 132 <br />AND "D" LINE -EB ON RAMP <br />10+70.0 "E" <br />14+24.5 "E' <br />1852 <br />]] 669 <br />19 094 <br />Tem EB ON RAMP <br />12+26. <br />1 + 2.0 T2 <br />4 <br />19 <br />WH OFF RAMP "C' LINE <br />29] 9 <br />Tem W8 CROSSOVER <br />45+43.7 <br />4 + 5.9 T3 <br />6 <br />1 1 <br />52+85.9 T4 <br />55+26.6 T4 <br />24 <br />68 <br />EB ON RAMP "D" LINE <br />983.8 <br />Tem EB GROSSO <br />55+42.3 <br />513.3 <br />791.3 <br />BIRD ROAD <br />STAGE <br />UNE -EB ON RAMP <br />49+43.3 D <br />50+10.0 D <br />]261 <br />14 305 <br />INCLUDES BASIN <br />VERNALIS ROAD <br />96].9 <br />939.4 <br />REMOVE BASE AN U AIN <br />- 0.4 <br />12 309 <br />12 309 <br />SEE UMMARY BELOW <br />TOTA <br />41 946 <br />IMPORTED BORROW = 155 84 m3 <br />STRUCTURAL SECTION GUANTITIE8 <br />LOCATON <br />� i <br />- <br />_ <br />_ <br />�u i <br />Z� <br />Uu <br />_� <br />"A" <br />LINE <br />< <br />~ <br />RAMP <br />92.fi <br />m3 <br />tonne <br />m3 <br />m3 <br />m3 <br />tonne <br />ROUTE 132 <br />UNE <br />W8 <br />OFF <br />RAMP <br />240.9 <br />"D" <br />LINE <br />EB <br />32+0].934 TO 34+23.42] EB <br />RAMP <br />123.6 <br />TOTAL <br />1]9.3 <br />191.] <br />2 1.8 <br />]15.8 <br />0.1 <br />34+23.42] TO 45+53.000 EB <br />y54� <br />5]26.2 <br />3334.3 <br />Rte <br />2699.2 <br />1.9 <br />48+82.000 TO 60+81.388 W8 <br />863 <br />] 4 <br />3028.5 <br />2314.0 <br />798.9 <br />1.1 <br />52+99.000 TO 60+81.354 EB <br />132 <br />SHEET L-6 <br />1053.3 <br />891.0 <br />219.9 <br />0.4 <br />VERNALIS Rd SHEET <br />L-6 <br />]49 <br />690 <br />WH ON RAMP "A" LINE AND <br />ROUTE 132 42+4].000 TO 44+26.912 <br />45]4 <br />648 <br />1142.0 <br />358.2 <br />132 <br />595.8 <br />918.6 <br />1226 <br />1128 <br />EB OFF RAMP "B" LINE <br />318.9 <br />1290.] <br />918.3 <br />1]].2 <br />5]5.3 <br />0.4 <br />19 094 <br />12 3p9' <br />WH OFF RAMP "C' LINE <br />29] 9 <br />1029.0 <br />698.3 <br />165.5 <br />519.6 <br />0.3 <br />EB ON RAMP "D" LINE <br />983.8 <br />308.5 <br />513.3 <br />791.3 <br />BIRD ROAD <br />1105.9 <br />265].6 <br />2012.0 <br />580.] <br />15]0.3 <br />0.8 <br />VERNALIS ROAD <br />96].9 <br />939.4 <br />- 0.4 <br />TEMPORARY TRAFFIC HANDLING DETOURS <br />aoaa.D <br />3381.0 <br />HMq DINE <br />160.2 <br />MAINTENANCE VEHICLE PULLWTS <br />111.4 <br />69.5 <br />EXTENDED GORE PAVING <br />129.0 <br />182.5 <br />TOTAL <br />45]4 <br />648 <br />3848.5 <br />21 047.2 <br />14 912.0 <br />2032.5 <br />8093.1 <br />5.4 <br />BORDER EA T REVISED 3/ <br />STAMPED HMA <br />LOCATION <br />10 <br />SJ <br />GORE <br />AREA <br />m2 <br />"A" <br />LINE <br />WH <br />ON <br />RAMP <br />92.fi <br />"8' <br />LINE <br />EB <br />OFF <br />RAMP <br />258.] <br />"C" <br />UNE <br />W8 <br />OFF <br />RAMP <br />240.9 <br />"D" <br />LINE <br />EB <br />ON <br />RAMP <br />123.6 <br />TOTAL <br />5]+30.000 <br />EB <br />2 1.8 <br />]15.8 <br />etrle <br />10 <br />SJ <br />132 <br />42+4].000 <br />1.5/4.8 <br />WB <br />010,1 <br />640 <br />1861 <br />1 13 <br />Janucry 20. <br />2010 <br />IIi <br />943 RESERVE DP. x100 11910 EAST HAZELTON <br />GRIND EXISTING CONCRETE PAVEMENT <br />STA <br />FROM TO <br />DIRECTION <br />LANE WIDTH <br />No. <br />m2 <br />42+4].000 <br />46+00.491 <br />WB <br />2 im <br />640 <br />1861 <br />1 13 <br />to <br />132 <br />SHEET L-2 <br />L-3 & L-4 <br />2452 <br />4+ 3.900 <br />5]+30.000 <br />EB <br />2 1.8 <br />5 <br />TOTAL <br />y54� <br />REMOVE BABE AND SURFACING <br />(N) NOT A SEPARATE PAY MEM, FOR INFORMATION ONLY. <br />• INCLUDED IN EARTHWORK SUMMARY <br />PLACE HMA (Misc AREA) <br />LOCATION <br />PLACE HMA <br />(Miac AREA) <br />m2 <br />LOCATON <br />CN) <br />AREA m2 <br />(N) <br />m3 <br />Rte <br />132 <br />H T -1 <br />& L-2 <br />1861 <br />1 13 <br />to <br />132 <br />SHEET L-2 <br />L-3 & L-4 <br />2452 <br />R e <br />132 <br />&BIRO Rd <br />SHEET L-4 L-5 -] <br />675 <br />621 <br />Rte <br />132 <br />&BIRO Rd <br />SHEET L-5 L-6 <br />863 <br />] 4 <br />Rte <br />132 <br />SHEET L-6 <br />]7 <br />]1 <br />VERNALIS Rd SHEET <br />L-6 <br />]49 <br />690 <br />Rte <br />132 <br />SHEET L-6 <br />& L-] <br />1226 <br />1128 <br />TEMPORARY TRAFFI <br />DLING TOURS <br />1 1 1 <br />036 <br />TOTAL <br />19 094 <br />12 3p9' <br />(N) NOT A SEPARATE PAY MEM, FOR INFORMATION ONLY. <br />• INCLUDED IN EARTHWORK SUMMARY <br />PLACE HMA (Misc AREA) <br />LOCATION <br />PLACE HMA <br />(Miac AREA) <br />m2 <br />• PAVED HMA APRON <br />33.44 <br />OVERSIOE DRAIN <br />15.]2 <br />0 L <br />49.16 <br />• SEE DRAINAGE QUANTITIES SHEETS <br />AS BUILT <br />CONTRACT No. 10-2A7804 <br />C.C.A. DATE 08/ 15/ 2014 <br />R.E. NAME Juan R. Zufiiga <br />IfFUI <br />RFI No. 065 <br />SUMMARY OF QUANTITIES <br />a-� <br />CU Ob25] EA 2AT801 <br />
The URL can be used to link to this page
Your browser does not support the video tag.