Laserfiche WebLink
VERTICAL <br />CURB AND GUTTER <br />7'-6" Min or as shown on <br />5'-0" Min or as shown on plans— <br />y Score mark if monolithic pour-\ <br />J <br />1.5%(l% to 22': allowable T � <br />4•x... .... i.. :, <br />6" <br />VERTICAL <br />CURB, GUTTER AND SIDEWALK <br />NOTE: <br />1/2" x <br />24" <br />rebar, <br />greased <br />and <br />wrapped <br />one side <br />through <br />all <br />expansion <br />and <br />cold <br />[D <br />joints. <br />Wr VERTICAL CURB, <br />aGUTTER AND SIDEWALK <br />s DmcdpUon Day <br />COUNTY OF SAN JOAQUIN <br />aeenerAaflar oe werrc wosxs <br />Wwkmg for YOU pay: MAY 2020 Std. Dwg. No. 11_7 <br />