<br />SOUTH SYSTEM IMPROVEMENTS 
<br />SAN JOAQUIN COUNTY 
<br />VICINITY MAP 
<br />NOT TO SCALE 
<br />1: NORTH SAN JOAQUIN WATER CONSERVATION DISTRICT (NSJWCD) SHALL BE CONTACTED AT LEAST 
<br />48 HOURS PRIOR TO COMMENCEMENT OF WORK ON OR NEAR EXISTING DISTRICT FACILITIES. 
<br />2: USED MATERIAL, REJECTS, MISFITS, SECONDS, ETC. ARE NOT ACCEPTABLE FOR USE. 
<br />3: ALL CONSTRUCTION SHALL BE IN CONFORMANCE WITH THESE PLANS AND PROJECT 
<br />SPECIFICATIONS. 
<br />4: CONTRACTOR SHALL FIELD VERIFY THE HORIZONTAL AND VERTICAL LOCATIONS OF ALL EXISTING 
<br />FACILITIES PRIOR TO COMMENCING WORK. CALL UNDERGROUND SERVICE ALERT (USA) AT 8-1-1. 
<br />CONTRACTOR SHALL MAKE ENGINEER AWARE OF ANY DISCREPANCIES. WHERE UNDERGROUND AND 
<br />SURFACE STRUCTURES ARE SHOWN ON THE PLANS, THE LOCATIONS, DEPTH AND DIMENSIONS OF 
<br />STRUCTURES ARE BELIEVED TO BE REASONABLY CORRECT, BUT ARE NOT GUARANTEED. SUCH 
<br />STRUCTURES ARE SHOWN FOR THE INFORMATION OF THE CONTRACTOR, BUT INFORMATION SO 
<br />GIVEN IS NOT TO BE CONSTRUED AS A REPRESENTATION THAT SUCH STRUCTURES WILL, IN ALL 
<br />CASES, BE FOUND WHERE SHOWN, OR THAT THEY REPRESENT ALL OF THE STRUCTURES WHICH 
<br />MAY BE ENCOUNTERED. 
<br />5: CONCRETE DESIGN MIX SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL. ALL 
<br />CONCRETE SHALL HAVE A 28 -DAY MINIMUM COMPRESSIVE STRENGTH OF 45000 PSI UNLESS 
<br />OTHERWISE SPECIFIED. 
<br />6: TRENCH BACKFILL SHALL BE COMPACTED TO 90% RELATIVE COMPACTION UNLESS OTHERWISE 
<br />NOTED IN THESE PLANS. 
<br />7: ALL STEEL PIPE AND FITTINGS SHALL BE FURNISHED WITH A SHOP APPLIED HIGH SOLIDS EPDXY 
<br />COATING ON THE INTERIOR AND EXTERIOR, UNLESS OTHERWISE INDICATED. ALL OTHER EXPOSED 
<br />STEEL SHALL BE PAINTED WITH A PRE-TREATMENT PRIMER, AN UNDERCOAT, AND A FINAL COAT 
<br />OF PAINT IN ACCORDANCE WITH THESE PLANS. 
<br />8: ALL NUTS, BOLTS, AND WASHERS USED TO SECURE UNDERGROUND FITTINGS SHALL BE STAINLESS 
<br />STEEL. AFTER INSTALLATION, ALL STEEL HARDWARE SHALL BE COATED WITH A RUST 
<br />PREVENTATIVE, WRAPPED WITH 4 MIL POLYETHYLENE SHEETING, AND SECURED WITH PVC TAPE. 
<br />9: THRUST RESTRAINTS TO BE PROVIDED AT ALL PIPELINE BENDS, WHETHER OR NOT SHOWN ON THE 
<br />PLANS. 
<br />10: ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE HEALTH AND 
<br />SAFETY LAWS OF THE STATE OF CALIFORNIA AND CAL/OSHA STANDARDS. 
<br />11: CONTRACTOR WILL BE RESPONSIBLE FOR THE REPAIR OF ALL PIPELINE CRACKS, WHICH DEVELOP 
<br />DURING CONSTRUCTION OF IMPROVEMENTS AFFECTING EXISTING FACILITIES. 
<br />12: ALL EXCESS MATERIAL AND/OR DEBRIS SHALL BE REMOVED UPON COMPLETION OF INSTALLATION. 
<br />13: CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE DUST CONTROL AT ALL TIMES. 
<br />SITE SAFETY AND PROTECTION NOTES 
<br />1: THE DUTY OF THE ENGINEER, OWNER OR ITS AGENTS TO CONDUCT CONSTRUCTION OF THE 
<br />CONTRACTOR'S PERFORMANCE AND THE UNDERTAKING OF INSPECTIONS OR THE GIVING OF 
<br />INSTRUCTIONS AS AUTHORIZED HEREIN IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY 
<br />OF THE CONTRACTOR'S SAFETY MEASURES IN, ON, OR NEAR THE CONSTRUCTION SITE AND SHALL 
<br />NO BE CONSTRUED AS SUPERVISION OF THE ACTUAL CONSTRUCTION NOR MAKE THE ENGINEER, 
<br />OWNER OR ITS AGENTS RESPONSIBLE FOR PROVIDING A SAFE PLACE FOR THE PERFORMANCE OF 
<br />WORK BY THE CONTRACTOR, SUBCONTRACTORS, OR SUPPLIERS, OR FOR ACCESS, VISITS, USE, 
<br />WORK, TRAVEL OR OCCUPANCY BY ANY PERSON. 
<br />2: THE CONTRACTOR SHALL HAVE AT THE WORK SITE, COPIES OR SUITABLE EXTRACTS OF 
<br />CONSTRUCTION SAFETY ORDERS, ISSUED BY CAL -OSHA. CONTRACTOR SHALL COMPLY WITH 
<br />PROVISIONS OF THESE AND ALL OTHER APPLICABLE LAWS, ORDINANCES AND REGULATIONS. THE 
<br />CONTRACTOR MUST COMPLY WITH PROVISIONS OF THE SAFETY AND HEAL REGULATIONS FOR 
<br />CONSTRUCTION, PROMULGATED BY THE SECRETARY OF LABOR UNDER SECTION 107 OF THE 
<br />CONTRACT WORK HOURS AND SAFETY STANDARDS ACE, AS SET FORTH IN TITLE 29 C.F.R. 
<br />3: TO PROTECT THE LIVES AND HEALTH OF CONTRACTOR'S EMPLOYEES UNDER THE CONTRACT, THE 
<br />CONTRACTOR SHALL COMPLY WITH ALL PERTINENT PROVISIONS OF THE "MANUAL OF ACCIDENT 
<br />PREVENTION IN CONSTRUCTION" ISSUED BY THE ASSOCIATED GENERAL CONTRACTORS OF AMERICA, 
<br />INC., AND SHALL MAINTAIN AN ACCURATE RECORD OF ALL CASES OF DEATH, OCCUPATIONAL 
<br />DISEASE, AND INJURY REQUIRING MEDICAL ATTENTION OR CAUSING LOSS OF 11ME FROM WORK, 
<br />ARISING OUT OF AND IN THE COURSE OF EMPLOYMENT OR WOK UNDER THE CONTRACT. 
<br />4: THE CONTRACTOR ALONE SHALL BE RESPONSIBLE FOR THE SAFETY, EFFICIENCY, AND ADEQUACY 
<br />OF CONTRACTOR'S FACILITIES, APPLIANCES, AND METHODS AND FOR ANY DAMAGE, WHICH MAY 
<br />RESULT FROM THEIR FAILURE OR THEIR IMPROPER CONSTRUCTION, MAINTENANCE, OR OPERATION. 
<br />5: THE CONTRACTOR AGREES THAT IT SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB 
<br />SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY 
<br />OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND 
<br />NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, 
<br />INDEMNIFY, AND HOLD THE OWNER, ENGINEER, AND THEIR RESPECTIVE AGENTS HARMLESS FROM 
<br />ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK 
<br />ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF OWNER, 
<br />ENGINEER, OR THEIR RESPECTIVE AGENTS. 
<br />6: THE OWNER AND ITS AGENTS' SITE RESPONSIBILITIES ARE LIMITED SOLELY TO THE ACTIVITIES OF 
<br />THEIR EMPLOYEES ON SITE. THE RESPONSIBILITIES SHALL NO BE INFERRED BY ANY PARTY TO 
<br />MEAN THAT THE OWNER OR ITS AGENTS HAVE RESPONSIBILITY FOR SITE SAFETY. SAFETY IN, ON, 
<br />OR ABOUT THE SITE IS THE SOLE AND EXCLUSIVE RESPONSIBILITY OF THE CONTRACTOR ALONE. 
<br />THE CONTRACTOR'S METHODS OF WORK PERFORMANCE, SUPERINTENDENCE,AND THE 
<br />CONTRACTOR'S EMPLOYEES, AND SEQUENCING OF CONSTRUCTION ARE ALSO THE SOLE AND 
<br />EXCLUSIVE RESPONSIBILITIES OF THE CONTRACTOR ALONE. 
<br />006 
<br />DE GRAAF 
<br />IT-IIMMI r-FRING, INC. 
<br />DEGRAAFENGINEERINGINC.COM 
<br />P.O. BOX 87 RIPON, CA 95366 
<br />(209)614-2745 
<br />Na 86415 
<br />DATE SIGNED: 
<br />BID SET 
<br />NOT FOR CONSTRUCTION 
<br />1112/2022 
<br />10[*�VVA61W0 b7a\I=11111111 
<br />0 
<br />Know. what's below. 
<br />Cal before you 
<br />CHECKED BY: DD 
<br />DATE: 11/212022 
<br />SHEET 
<br />1 OF 10 
<br />U_ 
<br />0 
<br />z 
<br />0 
<br />H 
<br />w 
<br />; 
<br />Z 
<br />g 
<br />(t 
<br />of 
<br />W 
<br />W 
<br />O 
<br />LL 
<br />QJ 
<br />0 
<br />Z 
<br />U 
<br />z 
<br />w 
<br />`U 
<br />O 
<br />W 
<br />Z_ 
<br />rw 
<br />>Q 
<br />Z 
<br />� 
<br />O 
<br />1:5 
<br />cy 
<br />0 
<br />O 
<br />O 
<br />Q 
<br />W 
<br />Z 
<br />z 
<br />Q 
<br />O 
<br />z 
<br />PROJECT: 
<br />22-01 
<br />DRAWN BY: 
<br />GJ 
<br />CHECKED BY: DD 
<br />DATE: 11/212022 
<br />SHEET 
<br />1 OF 10 