My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2301001 thru PS-2301500_ - PS-2301211
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2023
>
PS-2301001 thru PS-2301500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2301001 thru PS-2301500_ - PS-2301211
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2023 8:38:29 AM
Creation date
11/30/2023 8:35:45 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2301211
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2023
Notes2
Both Sides of Harney Ln. 0.5 Mile E/O Alpine Rd.
Address
PO Box 174, Tracy,CA 95378
Application
Arnaudo Construction
Type
Trench
Supplemental fields
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E <br />E <br />W <br />SEE GENERAL NOTES ON COVER PAGE. <br />NOTES: <br />- Contractor shall maintain access to all driveways, pedestrians & emergency <br />vehicles within the affected area's, unless otherwise noted. <br />- Contractor shall maintain a safe "ADA" compliant accessible pedestrian <br />travel way at all times & have a designated escort to assist if needed. <br />- Contractor shall perform all appropriate measures to uphold the <br />safety of any bicyclists within the affected areas. <br />- Contractor shall post temporary "No Parking" signage within all affected areas 72 <br />hours before the start of work. notify all affected residents/businesses. <br />- Contractor may remove or reduce the control zone <br />when the affected area is no longer needed. <br />- Place W20-1 sign on any side street or high volume driveway that is within <br />the traffic control boundaries. <br />Flagger Note: <br />Two or more flaggers may be <br />needed depending on vehicle volume, <br />speeds & road conditions. Flaggers to <br />be in line of sight or radio communication <br />must be used. Adjust as needed <br />Pr directed by controlling authority. <br />Setup May Be Reversible <br />o Either Side Of The Road <br />F <br />— — — — — — — — — — — <br />500' <br />ROAD ONE LAN <br />WORK ROAD <br />AHEAD HEAD > <br />�tio ✓ <br />Arnaudo Construction <br />Utility Access, Repairs & Improvements <br />VIGHT WORK: <br />Nil signage and Channelizers shall be outfitted with <br />•etroreflective and meet the standards of the local agency or <br />)er MUTCD. Flashing Beacons/lights shall be used. Any flagger. <br />;hall meet code and be illuminated during non visible hours. <br />250' 250' . <br />BE <br />PREPARED <br />t TO STOP <br />WORKING HOURS - <br />Job/P.O. # - <br />Contractor to maintain LANE I W BE - W . W <br />access to residents CLOSED ✓ ANE PREPARED � ONROP <br />TO STOP \1 HE <br />at all times.�� GqP <br />,.o � I <br />0 250' 250' 500' <br />Taper50'-100' , <br />Buffer <br />�— — — vin or 15 rea Zone �. _ — — — F — — — — — — E Handel Road <br />:r �—► (�� i—► —► 50 mph <br />-tooc� vu�c��-�.�, v�.o icss ��•�.. �� I w�c�e. <br />/ <br />A av^:) <br />© COPYRIGHTED MATERIAL OF NATIONAL TRAFFIC <br />Page No. 2 of 2 <br />2a I 2� <br />I <br />V / <br />Legend <br />I• Channelizers/Delineators <br />Flashing Beacon <br />Sign Stand <br />® Work Area <br />Contractor Shall Maintain Access To All Residents, Businesses, IRA Fp,C <br />Pedestrians & Emergency Vehicles At All Times o2P DRAFTED BY <br />� STEVE NELSON � <br />E Handel Road Date Created - 11/22/2023 — 9 Contractor may p gger(s) when needed or directed depending on <br />implement the use of fla arrsanSzozTz y <br />EXP. 2/14/2027 <br />vehicle speeds, volume & road conditions to help slow or stop traffic. C9A & W3-4 signage <br />City Of Lodi, CA Drawing Not To Scale in addition to this plan, shall be spaced in all directions (See "Table A" & General Notes). ArssP I <br />ENGINEER & DESIGN DISCLAIMER: NATIONAL TRAFFIC DESIGNS TAKES NO RESPONSIBILITYS IN THE CASE OF ANYACCIDENT, INJURY OR DEATH FROM THE USE OF THESE PLANS. NATIONAL TRAFFIC DESIGNS <br />HAS PREPARED THESE PLANS AS A DRAFT TO BE USED IN THE DESCRETION OF THE CONTRACTOR & THOSE CERTIFIED ON SITE FOLLOWING ALL AGENCY GUIDLINES. <br />I Manifest I <br />49 x Chan nelizers/Delineators <br />18x Sign Flags <br />9 x Sign Stand <br />2 x C9A Flagger Ahead <br />2 x Flagmen <br />2 x Flashing Beacon <br />2 x W20-1 Road Work Ahead <br />2 x W20-4 One Lane Road Ahead <br />2 x W3-4 Be Prepared To Stop <br />1 x C30 Lane Closed <br />
The URL can be used to link to this page
Your browser does not support the video tag.