Laserfiche WebLink
WORK <br />Date: 8232023 Author: JB Project: 81623_ RAIL _WORKS _N.GOLDEN_GATE _AVE _TCP <br />ILII <br />11 <br />aon0 <br />cLoseDPLACE <br />SIGNS <br />HEA <br />10' FROM <br />TRACKS <br />R11-2 & <br />Project Name: STOCKTON RAILROAD TCP <br />M4 -10L <br />On <br />n <br />u <br />ROAD2�� <br />� I <br />DC ti <br />DC.C���ROAD <br />CLOSED <br />n <br />A <br />W <br />AHEAD <br />z <br />0i V' <br />V' <br />O <br />DETOUR <br />CLOSED <br />WORK <br />w <br />AHEAD <br />AHEAD <br />ROAD <br />HEA <br />m <br />aon0 <br />R11-4 & <br />CLOSED <br />100'-200' <br />100-200' <br />0 <br />0 <br />AHEAD <br />SHEETNo. 30F4 <br />R11-2 TO <br />R11-2 <br />HT <br />ROAD <br />LOSER 7 <br />H1 <br />N GOLDEN GATE AVE. IF <br />CLOSED <br />ti <br />I * I <br />Q <br />z <br />Q <br />WI1 <br />GOLDEN GATE AVE. CLOSED 11/8/2023 FROM 7:OOAM TO 3:30PM, <br />OPENED TO THROUGH TRAFFIC NIGHTLY <br />GOLDEN GATE AVE. CLOSED 11/9/2023 FROM 7:OOAM TO 3:30PM, <br />OPENED TO THROUGH TRAFFIC NIGHTLY <br />* CONTRACTOR SHALL MAINTAIN UNOBSTRUCTED <br />ACCESS AT ALL TIMES. <br />* CONTRACTOR SHALL MAINTAIN/PROVIDE ACCESS <br />TO ALL DRIVEWAYS AFFECTED BY THE WORK AREA. <br />* CONTRACTOR SHALL ASSIGN A WORKER TO ASSIST <br />PEDESTRIANS AROUND OR THRU THE WORK AREA. <br />* CONTRACTOR SHALL MAINTAIN A MINIMUM <br />4' PATH OF TRAVEL FOR PEDESTRIANS. <br />* W20-1 "ROAD WORK AHEAD" SIGNS SHALL BE PLACED <br />ON ALL SIDE STREETS BETWEEN THE WORK AREA AND <br />THE FIRST SIGN ENCOUNTERED BY TRAFFIC ON THE <br />ROADWAY. <br />N GOLDEN GATE <br />TRAFFIC CONTROL NOTES: <br />M4 -10R <br />ALLTRAFEC CONTROL SPICES SHALL BE A W IN THBR PROPER POSITION AT ALL <br />TIMESAND SHALL BE REPAIRED REPLACED, oR CLEANED AS NECESSARYTO PRESERVE <br />THBR APPEARANCE AND CONTINUITY <br />THE CONTRACTOR SHALL CONFORM TO ALLTRAFFIC CONTROL POLICIES METHODS <br />DETAILS , DIMENSIONS AND PROCEDURES DESCRIBED IN THE 2018 CAMUTCD. <br />ALLFU HINGARROWSIGNSSHALLBES0u1RPOWERED. <br />CONTRACTOR SHALL PROVIDE FLAGMEN AS NECESSARY TO GIVE AD EQUATE WAR NINGTO <br />TRAFFIC OR TO THE PUBLIC OF ANY DANGEROUS CONDITIONS TO BE ENCOUNTERED. <br />CONTRACTOR SHALLREMOVETEMPORARYTRPFFIC DELINEATION SIGNAGEANDOTHER <br />DEVICES WHEN NO LONGER REQUIRED, AND SHALLRESTOREAREAS TO ORIGINAL <br />CONDITIONS <br />ALL PERSONS IN TRAFFIC CONTROL AREA SHALL WEAR APPROPRIATE REFLECTIVE VETS <br />PER. CCR T8 CSO 1598 <br />111 <br />Date: 8232023 Author: JB Project: 81623_ RAIL _WORKS _N.GOLDEN_GATE _AVE _TCP <br />ILII <br />11 <br />aon0 <br />cLoseDPLACE <br />SIGNS <br />REVISIONS <br />10' FROM <br />TRACKS <br />R11-2 & <br />Project Name: STOCKTON RAILROAD TCP <br />M4 -10L <br />GOLDEN GATE AVE. CLOSED 11/8/2023 FROM 7:OOAM TO 3:30PM, <br />OPENED TO THROUGH TRAFFIC NIGHTLY <br />GOLDEN GATE AVE. CLOSED 11/9/2023 FROM 7:OOAM TO 3:30PM, <br />OPENED TO THROUGH TRAFFIC NIGHTLY <br />* CONTRACTOR SHALL MAINTAIN UNOBSTRUCTED <br />ACCESS AT ALL TIMES. <br />* CONTRACTOR SHALL MAINTAIN/PROVIDE ACCESS <br />TO ALL DRIVEWAYS AFFECTED BY THE WORK AREA. <br />* CONTRACTOR SHALL ASSIGN A WORKER TO ASSIST <br />PEDESTRIANS AROUND OR THRU THE WORK AREA. <br />* CONTRACTOR SHALL MAINTAIN A MINIMUM <br />4' PATH OF TRAVEL FOR PEDESTRIANS. <br />* W20-1 "ROAD WORK AHEAD" SIGNS SHALL BE PLACED <br />ON ALL SIDE STREETS BETWEEN THE WORK AREA AND <br />THE FIRST SIGN ENCOUNTERED BY TRAFFIC ON THE <br />ROADWAY. <br />N GOLDEN GATE <br />TRAFFIC CONTROL NOTES: <br />M4 -10R <br />ALLTRAFEC CONTROL SPICES SHALL BE A W IN THBR PROPER POSITION AT ALL <br />TIMESAND SHALL BE REPAIRED REPLACED, oR CLEANED AS NECESSARYTO PRESERVE <br />THBR APPEARANCE AND CONTINUITY <br />THE CONTRACTOR SHALL CONFORM TO ALLTRAFFIC CONTROL POLICIES METHODS <br />DETAILS , DIMENSIONS AND PROCEDURES DESCRIBED IN THE 2018 CAMUTCD. <br />ALLFU HINGARROWSIGNSSHALLBES0u1RPOWERED. <br />CONTRACTOR SHALL PROVIDE FLAGMEN AS NECESSARY TO GIVE AD EQUATE WAR NINGTO <br />TRAFFIC OR TO THE PUBLIC OF ANY DANGEROUS CONDITIONS TO BE ENCOUNTERED. <br />CONTRACTOR SHALLREMOVETEMPORARYTRPFFIC DELINEATION SIGNAGEANDOTHER <br />DEVICES WHEN NO LONGER REQUIRED, AND SHALLRESTOREAREAS TO ORIGINAL <br />CONDITIONS <br />ALL PERSONS IN TRAFFIC CONTROL AREA SHALL WEAR APPROPRIATE REFLECTIVE VETS <br />PER. CCR T8 CSO 1598 <br />111 <br />Date: 8232023 Author: JB Project: 81623_ RAIL _WORKS _N.GOLDEN_GATE _AVE _TCP <br />ILII <br />11 <br />CONST HOURS: <br />DAYS <br />MON-FRI 7:OOAM - 3:30 PM <br />SAT -SUN <br />NIGHTS <br />SUN-THURS <br />REVISIONS <br />M410L `10R <br />COMPASS <br />H1 <br />Project Name: STOCKTON RAILROAD TCP <br />On <br />n <br />u <br />ROAD2�� <br />� I <br />DC ti <br />DC.C���ROAD <br />CLOSED <br />n <br />A <br />W <br />AHEAD <br />z <br />0i V' <br />V' <br />O <br />DETOUR <br />CLOSED <br />WORK <br />w <br />AHEAD <br />AHEAD <br />HEAD <br />HEA <br />Phone Number: 209-518-8399 <br />aon0 <br />R11-4 & <br />1 1 <br />m <br />100'-200' <br />100-200' <br />100-200' <br />CONTRACTOR BHALLCOVER EX STING SIGNS WHERE THEY CON RICT W ITH CONSTRUCTION <br />DETOURS AND SIGNING. <br />ALL 0PEN EXCAVATION OR CONSTRUCTION WORK BH9LL BEA MINIMUM OF 5' FROM <br />ANY OPERATING TRAFFIC IANES <br />CONTRACTOR BHALLCOORDINATE WITH GTYICOUNTY AGENCY FOR AMC TEMPORARY TRAFFIC <br />SIGNALTIMING MODIFICATIONS. <br />THE CONTRACTOR BHALLPRovmE FOR ACCESS To ALLAD ACENT PROPERTIES DURING <br />WORKHOURB. CONSTRUCTION OPERATIONS BHALLBE CONDUCTED IN SUCHA MANNER <br />AB TO CAUBEAB IJTRE INCONVENIENCEAB POBBIBLETOABUT➢NG PROPEWY <br />OWNER3mPERATORS. <br />NOTIFY THE LOCAL LAW ENFORCEM ENTi FIRE AND AM BUTANCE COMPANIES WITHIN RHOURS <br />BEFORE CONSTRUCTION BEGINS <br />THE LOCATION OF THE SIGNS AS SHOWN ON THE ILLUSTRATIONS ARE GUIDELINES AND ACTUAL <br />LOCATIONS WILL DEPEND UPON AUGNM ENT, GRADE LOCATION OF STREET INTERSECTIONS AND <br />NOTHING ALLOWED IN BUFFER SPACE EXCEPT C30"LANE CLOSED" OR"SHOULDER CLOSED <br />PERMITTEDINTHEBUFFERAREAB. <br />www.invarionxcrn <br />N FILBERT ST. <br />Date: 8232023 Author: JB Project: 81623_ RAIL _WORKS _N.GOLDEN_GATE _AVE _TCP <br />ILII <br />11 <br />CONST HOURS: <br />DAYS <br />MON-FRI 7:OOAM - 3:30 PM <br />SAT -SUN <br />NIGHTS <br />SUN-THURS <br />REVISIONS <br />M410L `10R <br />COMPASS <br />A14-1OR M4 -10L <br />Project Name: STOCKTON RAILROAD TCP <br />On <br />n <br />u <br />ROAD2�� <br />i <br />w <br />CLOSED <br />n <br />A <br />W <br />AHEAD <br />z <br />0 <br />O <br />0 <br />ROAD 7 <br />w <br />WORK <br />11 <br />M4 <br />HEA <br />CONTRACTOR BHALLCOVER EX STING SIGNS WHERE THEY CON RICT W ITH CONSTRUCTION <br />DETOURS AND SIGNING. <br />ALL 0PEN EXCAVATION OR CONSTRUCTION WORK BH9LL BEA MINIMUM OF 5' FROM <br />ANY OPERATING TRAFFIC IANES <br />CONTRACTOR BHALLCOORDINATE WITH GTYICOUNTY AGENCY FOR AMC TEMPORARY TRAFFIC <br />SIGNALTIMING MODIFICATIONS. <br />THE CONTRACTOR BHALLPRovmE FOR ACCESS To ALLAD ACENT PROPERTIES DURING <br />WORKHOURB. CONSTRUCTION OPERATIONS BHALLBE CONDUCTED IN SUCHA MANNER <br />AB TO CAUBEAB IJTRE INCONVENIENCEAB POBBIBLETOABUT➢NG PROPEWY <br />OWNER3mPERATORS. <br />NOTIFY THE LOCAL LAW ENFORCEM ENTi FIRE AND AM BUTANCE COMPANIES WITHIN RHOURS <br />BEFORE CONSTRUCTION BEGINS <br />THE LOCATION OF THE SIGNS AS SHOWN ON THE ILLUSTRATIONS ARE GUIDELINES AND ACTUAL <br />LOCATIONS WILL DEPEND UPON AUGNM ENT, GRADE LOCATION OF STREET INTERSECTIONS AND <br />NOTHING ALLOWED IN BUFFER SPACE EXCEPT C30"LANE CLOSED" OR"SHOULDER CLOSED <br />PERMITTEDINTHEBUFFERAREAB. <br />www.invarionxcrn <br />N FILBERT ST. <br />Date: 8232023 Author: JB Project: 81623_ RAIL _WORKS _N.GOLDEN_GATE _AVE _TCP <br />Owner: RAI LWORKS <br />CONST HOURS: <br />DAYS <br />MON-FRI 7:OOAM - 3:30 PM <br />SAT -SUN <br />NIGHTS <br />SUN-THURS <br />REVISIONS <br />M410L `10R <br />COMPASS <br />A14-1OR M4 -10L <br />Project Name: STOCKTON RAILROAD TCP <br />On <br />n <br />u <br />i <br />w <br />n <br />A <br />W <br />DETOUR <br />z <br />0 <br />O <br />0 <br />R11-2 & <br />w <br />-10L <br />< <br />M4 <br />Phone Number: 209-518-8399 <br />aon0 <br />R11-4 & <br />cLoseD <br />M4 -10R <br />SHEETNo. 30F4 <br />R11-2 TO <br />ROAD <br />LOSER 7 <br />N GOLDEN GATE AVE. IF <br />NIGHTTIME TRAFFIC CONTROLFOR HIGHWAY MAINTENANCE AND CONSTRUCTION USE GUIDELINES <br />INTHE"NCHRP REPORT 470FOR DEIGNAND OPERATION COMPLY W ITH "ANSI 1OT2004" FOR <br />APPAREL HIGHWAY CONSTRUCTION WORK OGMING SHALL BE PER CONSTRUCTION SAFETY <br />OMER 1523 (CAUFORNIA CODE OF REGULATIONS TILT. 0, Dv. H CHAPTER 4, BOB. 4, A WICLE3, <br />BBOUT <br />ON1523- ILLUMINATIONS) <br />. <br />11/8-11/9 <br />Legend <br />Cone <br />Sign <br />i SIGN <br />Capitol <br />Barr"aa"' 1n0' <br />Date: 8232023 Author: JB Project: 81623_ RAIL _WORKS _N.GOLDEN_GATE _AVE _TCP <br />Owner: RAI LWORKS <br />CONST HOURS: <br />DAYS <br />MON-FRI 7:OOAM - 3:30 PM <br />SAT -SUN <br />NIGHTS <br />SUN-THURS <br />REVISIONS <br />COMPASS <br />Comments: <br />NOT TO SCALE: <br />CAPITOL BARRICADE, INC. ACKNOWLEDGES NO RESPOSIBILITY IN THE CASE OF ANY ACCIDENT, <br />INJURY OR DEATH OCCURING DURING THE USE OF THESE PLANS. <br />PLANS ARE NOT TO BE DUPLIATED FOR USE BY ANY OTHER PERSONS OR ENTITY NOT <br />INCLUDED IN THIS CONTRACT WITHOUT CONSENT OF CAPITOL BARRICADE, INC OR OWN ER <br />Project Name: STOCKTON RAILROAD TCP <br />Prime Contractor: RAIL WORKS <br />Project Manager: Timothy Reynolds <br />Phone Number: 209-518-8399 <br />SHEETNo. 30F4 <br />