My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP5086 - SP5093
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4710 - SP6054
>
SP5086 - SP5093
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 11:01:55 AM
Creation date
12/4/2023 10:53:41 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Thermoplastic Striping and Pavement Markings
Limits
Various Locations
Year
2012
Roads Worked
French Camp Rd., Jack Tone Rd., Mariposa Rd.
River Rd., Tracy Blvd., Eleventh St., West Ln.
Red Lines
Yes
Supplemental fields
Cross Ref
SP5086 - SP5093
DocCategory
Improvement Plans
Type
Thermoplastic Striping & Pavement Markings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br />0 <br />D <br />rri <br />70 <br />r <br />M <br />z <br />0 <br />GENERAL NOTES <br />1. Prior to commencing any work, it shall be the <br />contractor's responsibility to have each utility company <br />locate in the field their main and service lines. The <br />contractor shall notify the members of the Underground <br />Service Alert (USA) 48 hours in advance of performing <br />excavation work and/or sign relocation work by calling <br />toll—free 811 or 1 —800-227-2600. <br />2. The Contractor shall field verify all utility locations and <br />depths. It shall be the Contractor's sole responsibility to <br />protect all existing utilities, so that no damage results to <br />them during the performance of this contract. The <br />contractor shall be required to cooperate with other <br />contractors and utility companies installing new <br />structures, utilities, and services to the project. <br />3. Existing drainage facilities, water valves, frames and <br />covers, water meters, trees, shrubs, curb, gutter and <br />sidewalk shall remain in place unless otherwise noted on <br />the Plans. <br />4. Any existing thermoplastic or painted striping, pavement <br />markings (including limit lines and crosswalks) and <br />pavement markers shall be completely and properly <br />removed from the existing surface under the provisions <br />of Section 15 of the Caltrans Standard Specifications <br />before any new thermoplastic striping, pavement markings <br />and pavement markers are placed. <br />[oil] AJ1Z0 1 1111111=113 �YT112!I <br />DRAWN BY DATE <br />Y. Yamada 5,112 <br />.:- C;ORD DRAWINC <br />114dions By <br />:hanger By <br />Person Using This Drawing Should Verify <br />JOAQUIN I <br />NO SCALE <br />PROJECT ENGINEER DATE <br />11I ,.;ht ALf,L S 2•L <br />GENERAL NOTES <br />5. Under the provisions of Section 84 of the Caltrans <br />Standard Specifications, temporary centerline delineation <br />and pavement markings at all crosswalks and stop <br />locations shall be applied and maintained by the <br />Contractor if permanent replacement is not placed the <br />same day as removal. Placement and type of material <br />will be as approved by the Engineer. <br />6. A primer, of the type recommended by the manufacturer <br />of the thermoplastic material, shall be applied to all <br />asphaltic surfaces over 6 months old and to all Portland <br />cement concrete surfaces immediately in advance of, but <br />concurrent with, the application of thermoplastic material <br />under the provisions of Section 84 of the Caltrans <br />Standard Specifications. <br />7. New thermoplastic striping, pavement markings and <br />pavement markers shall be placed in like manner as the <br />existing striping, pavement marking and pavement <br />markers details unless otherwise indicated on the plans. <br />The limits of the proposed striping must match the limits <br />of the existing striping unless otherwise indicated on the <br />plans. Due to changes in traffic conditions, placement <br />location of pavement markings and/or striping detail may <br />be changed at the discretion of the Engineer. <br />8. At railroad crossings, thermoplastic paint shall not be <br />applied to any existing railroads or their concrete <br />planking. <br />9. Traffic stripes and pavement markers that are <br />discontinued through road intersections shall not be <br />measured for payment. <br />CHECKED I DATE <br />of -Y l L. <br />THERMOPLASTIC STRIPING AND PAVEMENT MARKINGS Sheet No. <br />(Various Locations) 2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.