My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1492 - SP1497
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1255 - SP1877
>
SP1492 - SP1497
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 3:50:56 PM
Creation date
12/4/2023 4:45:55 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Alpine Road Resurfacing
Limits
State Route 88 to Eight Mile Rd.
Year
1995
Project Engineer
J. Stewart
Roads Worked
Alpine Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP1492 - SP1497
Type
Resurfacing
Document Relationships
Alpine Road
(Message)
Path:
\VAULT MAPS\*CARD CATALOG*\A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Z <br />0 <br />D <br />m <br />Refer to Shoulder <br />Details Below <br />Limits of Earthwork <br />(Misc. Areas) <br />Const. <br />I <br />Limits of Clearing and Grubbing <br />12' 12' <br />22' Pavement Reinforcing Fabric <br />Refer to Shoulder <br />Details Below <br />—t.�ncrete Overla <br />.... „ y <br />TYPICAL SECTION <br />Sta. 0+88 to Stc. 155+45i <br />Const. <br />4' ♦ ■ 4' 12' <br />I <br />~* <br />Con form <br />Shoulder Backing <br />Sta. 8+00 to Sta. 14+00 Rt. <br />Sta. 25+00 to Sta. 36+50 Lt. <br />Const. <br />4' 4' 12' <br />I <br />Conform �— <br />Shoulder Backing <br />Sta. 0+88 to Sta. 8+00 Rt. <br />Sta. 0+88 to Sta. 25+00 Lt. <br />Sta. 14+00 to Sta. 155+45 Rt. <br />Sta. 36+50 to Sta. 155+45 Lt. <br />SHOULDER DETAILS <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE <br />Carole J. Griffin 2/19/ <br />ACAD <br />\carole\ plan\alpine\ types <br />PROJECT ENGINEER I DATE <br />CHECKED DATE <br />' zap <br />NO SCALE I TYPICAL SECTION <br />SUBMITTED DAZE-OMMENDED DATE <br />Al <br />did ';�1� _— - -- - <br />GENERAL NOTES <br />1. All earthwork, except for final grading of the <br />shoulders, shall be completed prior to placing <br />finished course of Asphalt Concrete overlay. <br />2. Graveled shoulders shall be constructed by <br />uniformly placing Shoulder Backing material <br />at the rate of 3 tons per station per side. <br />The gravel shoulder between Sta. 25+00± and <br />Sta. 36+50t Lt. shall be limited to the 4' <br />adjacent to the edge of pavement. The completed <br />shoulder shall be graded flush with the edge of <br />pavement. <br />3. Where superelevations exist on horizontal curves, <br />the new surface slope and drainage shall con— <br />form to existing. <br />4. Existing pavement markers may remain in place <br />where the Asphalt Concrete overlay thickness is <br />0.25' or greater. <br />5. Asphalt Concrete shall be place in two layers <br />of approximate equal thickness with pavement <br />reinforcing fabric placed between the layers. <br />6. Placement of the first layer of Asphalt Concrete <br />surfacing shall not begin until Asphalt Concrete <br />used in pavement repair has been in place for <br />as minimum of 36 hours. <br />7. Care shall be taken when paving Asphalt Concrete <br />Frontages, (Driveways—Type E), so as not to <br />obstruct existing drainage. <br />0 Limits of Mailbox Relocation <br />♦ Graveled shoulder — <br />see General Note #2 <br />■ 8' — Sta. 25+00± to Sta. 36+50f Lt. <br />ALPINE ROAD RESURFACING <br />State Route 88 to Eight Mile Rd. <br />Sheet No. <br />2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.