Laserfiche WebLink
Fi <br />116742 <br />V <br />1'-10" <br />2'-4" <br />West End <br />FILE NAME <br />1L 7 <br />5'-6" 7)_1011_15'-6" <br />1'-10" <br />2 <br />East End <br />SITE 1 <br />Davis Road <br />Minor Structure W-168 <br />3'- 6„ --_ <br />Remove headway <br />flush with top <br />of deck. <br />W,A <br />SITE 2 <br />Davis Road <br />Minor Structure W-169 <br />l_-__ _ 6,_011 <br />2,_7„ <br />V-6" <br />i <br />2'- C <br />SITE 6 <br />Harney LQn . <br />—404 Minnr Stri irti irA 1h <br />EXISTING END VIEWS <br />Conc. cover slab <br />2' 2' - <br />Existing <br />Box Culvert-\ <br />/7/7 <br />L1 <br />#5x24' Dowel @ 12" O.C. <br />Top and bottom. <br />#4 @ 8" max. <br />-Thoroughly clear, curface & coat <br />w/ epoxy bonding compound. <br />New R.C. Box <br />Firm subgrade soil or <br />compacted backfill as <br />directed by the Engineer. <br />CULVERT EXTENSION D <br />Y I DATE i PROJECT ENGINEER DATE II CHECKED DATE <br />DRAWER . ;. <br />-46, ce s- » <br />7'-2" <br />4 <br />4' <br />Exist. Slide Gate <br />SITE 4 <br />Thornton Road <br />Minor Structure W-136 <br />EXISTING END VIEWS <br />TYPE III BARRICADES <br />Location - Quantity <br />Site 3 Tully Road W440 <br />Sta. 4+00 2 Each <br />Sta. 6+00 2 Each <br />Total 4 Each <br />REMOVE CONCRETE <br />Location Quantity <br />Site 1 \ <br />Site 2 <br />Site 4 1 Lump Sum <br />Site 5 <br />Site 6 <br />BRIDGE REMOVAL <br />Location Quantity <br />Site 3 Tully Road W440 1 Lump Sum <br />CLEANING EXISTING <br />DRAINAGE FACILITIES <br />Location Quantity <br />Site 1 <br />Site 2 <br />Site 3 1 Lump Sum <br />Site 4 <br />Site 5 <br />EARTHWORK (MISC. AREAS) <br />Location Quantity <br />Site 1 <br />Site 2 <br />Site 3 <br />Site 4 1 Lump Sum <br />Site 5 <br />Site 6 <br />ASPHALT CONCRETE <br />(MISC. AREAS) <br />Location Quantity <br />Site 3 Tully Road W440 <br />Travel Lane 168 S.Y. <br />A.C. Down Drain 10 S.Y. <br />Total 178 S.Y. <br />-------------- <br />A CONCRETE <br />STRUCTURES) <br />4 <br />--- <br />Quantity <br />Site <br />1 <br />Exist. Slide Gate <br />SITE 4 <br />Thornton Road <br />Minor Structure W-136 <br />EXISTING END VIEWS <br />TYPE III BARRICADES <br />Location - Quantity <br />Site 3 Tully Road W440 <br />Sta. 4+00 2 Each <br />Sta. 6+00 2 Each <br />Total 4 Each <br />REMOVE CONCRETE <br />Location Quantity <br />Site 1 \ <br />Site 2 <br />Site 4 1 Lump Sum <br />Site 5 <br />Site 6 <br />BRIDGE REMOVAL <br />Location Quantity <br />Site 3 Tully Road W440 1 Lump Sum <br />CLEANING EXISTING <br />DRAINAGE FACILITIES <br />Location Quantity <br />Site 1 <br />Site 2 <br />Site 3 1 Lump Sum <br />Site 4 <br />Site 5 <br />EARTHWORK (MISC. AREAS) <br />Location Quantity <br />Site 1 <br />Site 2 <br />Site 3 <br />Site 4 1 Lump Sum <br />Site 5 <br />Site 6 <br />ASPHALT CONCRETE <br />(MISC. AREAS) <br />Location Quantity <br />Site 3 Tully Road W440 <br />Travel Lane 168 S.Y. <br />A.C. Down Drain 10 S.Y. <br />Total 178 S.Y. <br />Total 58 C.Y. (F) <br />PRECAST CONCRETE <br />BOX CULVERT (8'x4') <br />Location Quantity <br />Site 3 Double Box 38 L.F. x 2 = 76 L.F. (F) * <br />PRECAST CONCRETE <br />BOX CULVERT (6'x4') <br />Location Quantity <br />Site 4 Single Cell 12 L.F. (F) <br />TEMPORARY PROPERTY FENCE <br />Location Quantity <br />Site 3 (Sta. 4-t-60 to Sta. 5+40) <br />Eastside 110 L.F. <br />Westside 110 L.F. <br />Total 220 L.F. <br />RECONSTRUCT PROPERTY FENCE <br />Location Quantity <br />Site 3 (Sta. 4+60 to Sta. 5+40) <br />Eastside 80 L.F. <br />Westside 80 L.F. <br />Total 160 L.F. <br />z <br />(F) * Denotes Final Pay Quantities <br />I <br />NO SCALE i CONSTRUCTION DETAILS PROJECT RM� t I E <br />X <br />w <br />0 <br />z <br />W <br />J <br />..�.. LL. <br />INOR STRUCTURESSHEET TOTAL NO <br />SHEETS <br />.HABILITATION 1990 s 100 <br />CLASS <br />(MINOR <br />A CONCRETE <br />STRUCTURES) <br />Location <br />Quantity <br />Site <br />1 <br />13 <br />C.Y. <br />Site <br />2 <br />11 <br />C.Y. <br />Site <br />3 <br />14 <br />C.Y. <br />Site <br />4 <br />12 <br />C.Y. <br />Site <br />5 <br />R <br />r Y <br />Total 58 C.Y. (F) <br />PRECAST CONCRETE <br />BOX CULVERT (8'x4') <br />Location Quantity <br />Site 3 Double Box 38 L.F. x 2 = 76 L.F. (F) * <br />PRECAST CONCRETE <br />BOX CULVERT (6'x4') <br />Location Quantity <br />Site 4 Single Cell 12 L.F. (F) <br />TEMPORARY PROPERTY FENCE <br />Location Quantity <br />Site 3 (Sta. 4-t-60 to Sta. 5+40) <br />Eastside 110 L.F. <br />Westside 110 L.F. <br />Total 220 L.F. <br />RECONSTRUCT PROPERTY FENCE <br />Location Quantity <br />Site 3 (Sta. 4+60 to Sta. 5+40) <br />Eastside 80 L.F. <br />Westside 80 L.F. <br />Total 160 L.F. <br />z <br />(F) * Denotes Final Pay Quantities <br />I <br />NO SCALE i CONSTRUCTION DETAILS PROJECT RM� t I E <br />X <br />w <br />0 <br />z <br />W <br />J <br />..�.. LL. <br />INOR STRUCTURESSHEET TOTAL NO <br />SHEETS <br />.HABILITATION 1990 s 100 <br />