Laserfiche WebLink
R/W 30' <br />I_ <br />w <br />I w <br />z <br />ROADWAY WIDENING —► <br />EXISTING RIGHT—OF—WAY <br />a <br />w <br />w <br />18'-24'f <br />2'-6'f <br />LINE CUT 0.50' <br />JF <br />CO/ISt <br />R/W <br />30' <br />i EXISTING RIGHT—OF—WAY <br />CL <br />w w I <br />w <br />i <br />18'-24p± w <br />z <br />2'-6'f ROADWAY WIDENING <br />ILINE CUT 0.50' <br />2 4 1 4 2 <br />2%_ VAR_ VAR.,-_ 2% <br />CONFORM �P�. 8% ° .�\�..\—%"� �qn ONFORM <br />'=RX <br />lr` a ISTINGROADWA,+ + +4++ + <br />At +°° + +. <br />SHOULDER BACKING + <br />- <br />o _ <br />COMPACT TO 90% RELATIVE <br />AC COMPACTION. <br />A.C. 0.60' <br />+: + +� AB 1.85' AB COMPACT <br />TO 95% RELATIVE COMPACTION. <br />LEFT SIDE <br />STA. 258+45 TO STA. 269+32 <br />R/W <br />2't ----{ <br />4' <br />CONFOR <br />A <br />SHOULDER BACKING <br />COMPACT TO 90% RELATIVE COMPACTION. <br />STA. 269+20 to 271+76± <br />STA. 273+72f TO 275+20 <br />NEW R/W <br />1' <br />i <br />0'-10, <br />BYRON ROAD <br />TYPICAL SECTION <br />30' <br />EXISTING RIGHT—OF—WAY <br />24'± <br />CO/RSt <br />BYRON <br />SHOULDER BACKING <br />COMPACT TO 90% RELATIVE <br />COMPACTION. <br />A.C. 0.60' <br />1.85' AB COMPACT <br />TO 95% RELATIVE COMPACTION. <br />RIGHT SIDE <br />STA. 258+45 TO STA. 268+70 <br />30' <br />EXISTING RIGHT—OF—WAY <br />24'± <br />0" 0.25' A.C. OVERLAY <br />STA. 269+20 TO 275+20 <br />ROAD <br />TYPICAL SECTION <br />• STA. 11+27± TO STA, 17+00 <br />Const <br />30' <br />EXISTING RIGHT—OF—WAY <br />• 32' 33'± <br />30' <br />EXISTING RIGHT—OF—WAY <br />R/W <br />4'� � 2't <br />NFORM <br />SHOULDER BACKING <br />COMPACT TO 90% RELATIVE COMPACTION. <br />STA. 269+20 to 275+20 <br />Cl- <br />uj GRIND 0.25' A.C. AND PLACE 0.50'-0.25' A.C. OVERLAY. w <br />w (CURVE RADII) w1 1'f -47't —I 14 16'-74'f w (CURVE RADII) <br />z ROADWAY WIDENING ZS i - u ROADWAY WIDENING <br />4' 4' 2'— 1 8 f � 0'-20'± <br />0.50'-0.25' <br />0.50' E CUT A.C. 0.50' LINE CUT <br />A.C. 0.60' <br />27 2%_ 2% 2% <br />`8� <br />CONFORM �l✓ar <br />• Q.4. <br />� -- - + + + + *. + +. a+ + t + +.° EXISTING ° ROADd�IQY- ,• • + + + + + + +a °° + .+ <br />-tl At <br />SHOULDER BACKING A.C. 0.60' r•/u hal / <br />°+ : # . + + • a.+..�. + + + + + <br />COMPACT TO 90% RELATIVE 1.85' AB COMPACT '� ���� 1.85' AB COMPACT <br />COMPACTION. ` ✓� TO 95% RELATIVE COMPACTION. lT �, TO 95% RELATIVE COMPACTION. <br />� 11 Z� � <br />5 <br />EXISTING UTILITY POLES <br />NEW UTILITY TO BE RELOCATED BY GRANT Ll NE ROAD <br />POLE LOCATION. OTHERS. <br />— <br />TYPICAL SECTION <br />LEFT SIDE RIGHT SIDE <br />STA. 271+60 (BYRON RD) STA. 273+84 (BYRON RD) <br />TO STA. 16+80 (GRANT LINE RD) TO STA. 12+20 (GRANT LINE RD) <br />-F/orr <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED BY <br />Entique Silva 1/13 <br />;61k �� U� 1113/,, /, <br />DRAf�IE:R SHEET N0. REVISION DATE <br />a <br />w <br />w <br />z <br />NEW R/W <br />,_ <br />0 5/ <br />1 <br />i <br />2'-4' <br />2f -4f <br />8�a Var CONFORM <br />SHOULDER BACKING <br />COMPACT TO 90% RELATIVE <br />COMPACTION. <br />AC <br />+ ° AB <br />itL - 1 35 th;cjc <br />'ON 133HS I 83MV80 <br />GENERAL NOTES <br />1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND FACILITIES, <br />PUBLIC OR PRIVATE, AND TO PROTECT THEM FROM DAMAGE, THE CONTRACTOR SHALL BEAR THE TOTAL EXPENSE OF REPAIR OR REPLACEMENT <br />OF ANY UNDERGROUND FACILITIES DAMAGED BY HIS OPERATIONS. QUANTITY AND EXACT LOCATIONS OF ALL UTILITIES TO BE DETERMINED BY <br />CONTRACTOR 48 HOURS BEFORE BEGINNING WORK. PHONE USA (811) PRIOR TO DIGGING. <br />2. THE CONTRACTOR SHALL FURNISH ALL MATERIALS AND SHALL PERFORM ALL LABOR IN ACCORDANCE WITH THE REQUIREMENTS OF THE <br />STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS AND STANDARD PLANS DATED MAY 2006, AND COUNTY <br />SPECIAL PROVISIONS. <br />3. CONTRACTOR IS RESPONSIBLE FOR TRAFFIC CONTROL MEASURES, AND CONFORMING TO THE CURRENT CALIFORNIA MANUAL UNIFORM <br />TRAFFIC CONTROL DEVICES. EVERY LANE OPEN TO TRAFFIC NEAR RAILROAD CROSSING SHALL HAVE AN ACTIVE WARNING DEVICE FUNCTIONING <br />AT ALL TIMES. ALL ACTIVE WARNING DEVICES SHALL EXTEND THE ENTIRE WIDTH OF THE TRAVEL LANES. <br />4. SHOULDER BACKING MATERIAL AT ALL INTERSECTION RADII SHALL RECEIVE PENETRATION TREATMENT AT 0.25 GALLON/SQUARE YARD. <br />LIMITS OF THE PENETRATION TREATMENT WORK SHALL BE CONFINED TO INTERSECTION RADII PLUS FIFTY FEET (50') IN EACH DIRECTION. <br />PAYMENT FOR PENETRATION TREATMENT SHOULD BE CONSIDERED AS INCLUDED IN THE UNIT PRICE PAID FOR PENETRATION TREATMENT. <br />5. THE CONTRACTOR SHALL CONDUCT THE SHOULDER BACKING OPERATION SO AS NOT TO DISTURB OR OBSTRUCT ANY EXISTING <br />DRAINAGE. <br />6. LOOP DETECTORS SHALL BE CENTERED IN EFFECTIVE LANE WIDTHS UNLESS OTHERWISE NOTED ON PLANS OR DIRECTED BY <br />THE ENGINEER. <br />7. CONTRACTOR SHALL CONTACT JIM WIROWEK WITH PACIFIC GAS & ELECTRIC AT (209) 932-6415 OFFICE OR <br />(209) 480-1681 CELL FOR POWER SERVICE CONNECTION. <br />8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPORTING ALL CONFLICTS, ERRORS, OMISSIONS, ETC, TO THE ENGINEER IMMEDIATELY <br />UPON DISCOVERY. IF SO DIRECTED BY THE ENGINEER, THE CONTRACTOR SHALL STOP WORK UNTIL REMEDIAL ACTION CAN BE TAKEN. ANY <br />COST RESULTING FROM THE CONTRACTOR'S FAILURE TO REPORT OR FAILURE TO STOP WORK AS DIRECTED WILL BE RESPONSIBILITY OF <br />THE CONTRACTOR. <br />9, TRAFFIC STRIPES, PAVEMENT MARKINGS AND RAISED PAVEMENT MARKERS SHALL BE PER CALIFORNIA (MUTCD) MANUAL AND STANDARD <br />PLANS AND SPECIFICATIONS, LATEST EDITION. <br />10. ALL SIGNS SHALL BE STANDARD SIZE AND INSTALLED ON GALVANIZED STEEL SQUARE POSTS PER COUNTY STANDARD PLAN R-26, <br />UNLESS OTHERWISE NOTED ON THE PLANS. <br />11. ALL CONFLICTING STRIPES AND PAVEMENT MARKINGS SHALL BE REMOVED AT APPROPRIATE TIME RELATIVE TO THIS WORK OR AS <br />OTHERWISE DIRECTED BY THE ENGINEER. CONFLICTING SIGNS AND RAISED PAVEMENT MARKERS SHALL BE REMOVED. ALL REMOVALS SHALL <br />BE THE RESPONSIBILITY OF THE CONTRACTOR. TEMPORARY STRIPING, MARKINGS, SIGNINGS SHALL BE IN PLACE PRIOR TO OPENING LANES <br />TO TRAFFIC. <br />12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY SCHEDULING INSPECTION AND TESTING OF ALL FACILITIES CONSTRUCTED <br />UNDER THIS CONTRACT, ALL TESTING SHALL CONFORM TO THE STANDARD SPECIFICATIONS, ALL RE—TESTING SHALL BE PAID BY THE <br />CONTRACTOR. <br />13. THE CONTRACTOR SHALL NOTIFY SPRINT FOR A REPRESENTATIVE TO BE PRESENT DURING WORK NEAR THE FIBER OPTIC LINE AT <br />LEAST TWO WEEKS PRIOR TO COMMENCEMENT OF WORK. PLEASE CONTACT SPRINT REPRESENTATIVE ED PEREZ AT (209) 423-9741 <br />14. THE CONTRACTOR SHALL NOTIFY KINDER MORGAN TO ARRANGE FOR A PIPELINE REPRESENTATIVE TO BE PRESENT DURING WORK NEAR <br />THE PIPELINES AT LEAST TWO WEEKS PRIOR TO COMMENCEMENT OF WORK, PLEASE CONTACT KINDER MORGAN AREA MANAGER, MR. MIKE <br />McWHORTER AT (559) 493-2975 THE CONTRACTOR SHALL ALSO PROVIDE A LIST OF CONSTRUCTION EQUIPMENT THAT WILL BE USED AT <br />THE PROJECT SITE TO KINDER MORGAN 15 CALENDAR DAYS AFTER AWARD OF CONTRACT. <br />15. THE CONTRACTOR SHALL CONTACT CHEVRON PIPELINE COMPANY TO ARRANGE A FACILITY INSPECTOR ON SITE DURING CONSTRUCTION <br />AT LEAST TWO WEEKS PRIOR TO COMMENCEMENT OF WORK, THE CONTRACTOR SHALL ALSO PROVIDE A LIST OF CONSTRUCTION EQUIPMENT <br />THAT WILL BE USED AT THE PROJECT SITE TO CHEVRON PIPELINE COMPANY 15 CALENDAR DAYS AFTER AWARD OF CONTRACT, PLEASE <br />CONTACT JEREMY GROSS AT (925) 753-2003 OR ADAM HAAS AT (925) 766-9210. <br />16. THE CONTRACTOR SHALL CONTACT UNION PACIFIC RAILROAD COMPANY JIM SMITH AT (916) 789-5152 ON THE START DATE AT LEAST <br />TWO WEEKS PRIOR TO COMMENCEMENT OF WORK. THROUGHOUT THE ENTIRE CONSTRUCTION TIME FRAME, THE CONTRACTOR AND UPRR <br />SHALL WORK CONCURRENTLY AND COMMUNICATE/COORDINATE ON WORK SCHEDULE PERFORMED BY BOTH PARTIES. <br />17. THE CONTRACTOR SHALL NOTIFY MARK RUIZ, CITY OF TRACY CONSTRUCTION INSPECTION DIVISION, AT (209) 483-6091, <br />FORTY—EIGHT (48) HOURS PRIOR TO START OF WORK. <br />18. THE CONTRACTOR IS PROHIBITED TO USE HEAVY VIBRATORY EQUIPMENT OVER CHEVRON AND KINDER MORGAN PETROLEUM PIPELINE <br />AND SPRINT/VERIZON FIBER OPTIC LINE. CONSTRUCTION EQUIPMENT WILL BE LIMITED TO LIGHT WEIGHT GRADERS/EXCAVATORS AND ROLLERS <br />WITH MINIMAL COMPACTION OF THE SUBGRADE OVER THE PIPELINE AND FIBER OPTIC TO AVOID POSSIBLE DAMAGE, <br />19. REMOVAL OF PAVEMENT MARKERS SHALL BE CONSIDERED AS INCLUDED IN THE CONTRACT UNIT PRICE PAID FOR ASPHALT CONCRETE <br />AND NO SEPARATE PAYMENT WILL BE ALLOWED. <br />20. ALL UNDERGROUND WORK AND SIGNAL WORK SHALL BE INSTALLED AND COMPLETED PRIOR TO THE FINAL A.C. LIFT, <br />RECOR"RAMVING <br />i <br />No Ch _ - �...........-- <br />DetP l <br />VTKhis:Dm� <br />Any P�arcnn 1Asin ine. h0uld Vorlfy <br />aminfirm^tif?r� R' insnQrtlno The Site Of Wrwv <br />UNDERGROUND <br />SERVICE ALERT <br />OFESS/p1, <br />W <br />No. 42581 <br />9�F cIV1\- <br />David Mend za <br />Registered Civil Engineer <br />DATE TYPICAL SECTION, GENERAL NOTES, AND BYRON ROAD AND GRANT LINE ROAD SHEET TOTAL <br />S <br />COUNTY OF SAN JOAQUIN No SCALE SHOULDER DETAILS z 7 <br />/r3 INTERSECTION IMPROVEMENTS <br />