Laserfiche WebLink
NOTES: <br />1. If the distance between cross—cuts are less then 150' the entire area between <br />corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br />2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br />R-29. <br />3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br />the shoulder or lane, only that area shall be resufaced as shown. <br />4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing. Section as03B 2 <br />Paved Shoulder <br />ez% <br />TRENCH CUTTING POLICYCROSS CUTTING OF <br />COUNTY ROADWAYS ea Rwlslen DCOUNTY OF SAN JOAQUIN <br />o�nsat�rr�weucwma:s <br />®VOLkang f0[ YOU Dote: DEC 2014 Std. Dwg. No. <br />1�1 <br />/r <br />Im <br />�// <br />p <br />010, <br />%r <br />IIg11 <br />ez% <br />TRENCH CUTTING POLICYCROSS CUTTING OF <br />COUNTY ROADWAYS ea Rwlslen DCOUNTY OF SAN JOAQUIN <br />o�nsat�rr�weucwma:s <br />®VOLkang f0[ YOU Dote: DEC 2014 Std. Dwg. No. <br />