<br />WORK AREA
<br />__4
<br />WORK SUMMARY
<br />• INSTALL 5380' OF 4" PLASTIC HP MAIN
<br />• INSTALL 4607' OF 2" PLASTIC HP MAIN
<br />• ABANDON 5371' OF 4" STEEL HP MAIN
<br />• ABANDON 5026' OF 2" STEEL HP MAIN
<br />• ABANDON 229' OF 2" PLASTIC HP MAIN
<br />9 ABANDON 286' OF 1-1/4" PLASTIC HP MAIN
<br />• REPLACE 128 STEEL OR ALDYL-A SERVICES
<br />• TRANSFER 14 PLASTIC SERVICE TO NEW MAIN
<br />• CUT-OFF 2 STEEL SERVICES
<br />C PROJECT NOTES
<br />1. IF STOPPING FLOW AT A TIE-IN, INTALL A TEMPORARY 1" BYPASS NO LONGER THAN 25'.
<br />2. PULL CARRIER CABLE SIZE 8 AND LOCATING WIRE FROM WEST TIE IN LOCATION ON COUNTRY CLUB AND MOERING TO EAST TIE IN LOCATION ON COUNTRY CLUB AT FRANKLIN INCLUDING, ALL
<br />STL-PL TIE-INS. MODIFIED TYPE G ETS WITH #8 WIRES IN LIEU OF #10 WIRES AT ALL STL-PL TIE-INS. REVIEW CPRF FOR ALL DETAILS.
<br />3. MAINTAIN 7.5' IN CAL TRANS CROSSING.
<br />4. THIS IS A PHASE 2 JOB WITH PM31512733. TIE IN LOCATION IS JUST EAST OF EASTERN INTERSECTION OF FRANKLIN AVE AND COUNTRY CLUB BLVD. IN FRONT OF 2108 COUNTRY CLUB BLVD.
<br />* ESTIMATING JOB WALK COMPLETED ON 07/15/2021. PREFERRED METHOD OF CONSTRUCTION TO BE
<br />BORED FOR MAIN INSTALLATION AND BORED FOR SERVICE INSTALLATION, PER GC REPRESENTATIVE.
<br />GAS NOTES
<br />N
<br />.l1
<br />1. PRIOR TO STARTING WORK, CONTACT LOCAL AREA CORROSION SUPERVISOR REGARDING CATHODIC PROTECTION REQUIREMENTS AND I&R SUPERVISOR REGARDING ANY SHUTDOWN, ABANDONMENT, OR
<br />TIE-IN OF ANY MAINS WHICH MAY AFFECT ANY DISTRICT REGULATOR STATION.
<br />2. ALL STEEL TIE-INS, CUT OFFS AND CAPPING OF CAST IRON AND STEEL MAIN PER A-36 AND C-37.
<br />3. ALL PLASTIC CONNECTIONS TO BE PERFORMED IN ACCORDANCE WITH THE APPROPRIATE PROCEDURES LISTED IN TD -41705.
<br />4. UNLESS OTHERWISE NOTED, CONSTRUCTION TO REFERENCE TD -4125P-09 TO DETERMINE EXISTING STEEL PIPE SPECS.
<br />5. ALL ARC WELDING IS TO BE PERFORMED IN ACCORDANCE WITH THE GAS WELDING CONTROL MANUAL TD -4160M. REFER TO TD -4160P-20 FOR GENERAL WELDING REQUIREMENTS.
<br />6. PURGE MAINS 10" IN DIAMETER & LESS PER GS&S A-38, ATTACHMENT A, PROCEDURE 2. PURGE MAINS GREATER THAN 10" IN DIAMETER PER GS&S A-38, ATTACHMENT A, PROCEDURE 3.
<br />7. ABANDON ALL UNDERGROUND GAS FACILITIES PER UTILITY PROCEDURE TD-950OP-16 & GS&S A-93.2.
<br />8. FOLLOW ALL MINIMUM INSTALLATION DEPTHS AND CLEARANCES TO OTHER FACILITIES FOR TRANSMISSION, DISTRIBUTION AND SERVICE PIPE AS OUTLINED IN GS&S A-04. FOR JOINT TRENCH
<br />INSTALLATIONS, REFERENCE U.O. STANDARD S5453.
<br />9. ALL GAS RISERS ARE TO BE INSTALLED IN ACCORDANCE WITH GS&S J-15 & J-15.1.
<br />10. INSTALL METER PROTECTION PER GS&S J-95.
<br />11. VENT REGULATORS PER GS&S H-93.
<br />12. LOCATION OF EXISTING UTILITIES ARE APPROXIMATE. CALL UNDERGROUND SERVICES ALERT (USA) TO CONFIRM.
<br />13. CONSTRUCTION SHALL REPORT ALL OPERATIONAL CHANGES IN ACCORDANCE WITH PROCEDURES LISTED IN TD -4441P-03.
<br />14. ALL STEEL RISERS ARE TO BE REPLACED WITH NON CORRODIBLE RISERS OR REPLACED BY USING THE RISER INSERT RENEWAL INSTALLATION PER GS&S A-90.
<br />15. ALL SERVICES AND MAINS TO BE TESTED PRIOR TO TIE-IN PER GS&S A-34. IF MAIN TEST DATA IS NOT RECORDED ON THIS DRAWING, REFER TO THE ASSOCIATED OPERATIONAL CHANGE NOTICE.
<br />FOR SERVICE TEST DATA, REFER TO THE GAS SERVICE RECORD.
<br />16. INSTALL PLASTIC MAIN, SERVICES, & LOCATING WIRE PER GS&S A-34, A-90, A-90.2, A-90.3, A-91, A-93, A-93.1, A-93.3, UTILITY STANDARD TD -41705, D-34 & CORROSION CONTROL
<br />STANDARD TD -4181S.
<br />17. INSTALL ANODES PER CORROSION CONTROL MANUAL 0-13.1.
<br />18. INSTALL ELECTROLYSIS TEST STATIONS PER CORROSION CONTROL MANUAL 0-10 AND 0-10.1. IF PRACTICAL, INSTALL ETS STATION OUT OF THE ROADWAY.
<br />19. ALL EXCAVATION TO BE PERFORMED PER TD -5811M, TD -5811P-301, TD -5811P-105, TD -4412P-05, AND TD -4621S. STANDBY REQUIRED IF EXCAVATING WITHIN 5' OFA CRITICAL FACILITY,
<br />BORING ACTIVITY THAT CROSSES OR THAT PARALLELS WITHIN 10' OF A CRITICAL FACILITY. CONTACT THE CONSTRUCTION SUPERVISOR.
<br />20. NOTIFY SCHOOLS AND HOSPITALS WITHIN 500' OF PROPOSED EXCAVATION FOR GAS FACILITIES A MINIMUM OF 3 DAYS PRIOR TO DIGGING PER AB 1937.
<br />21. ANY PIPE REPLACEMENT VIA SPLITTING TO BE DONE PER TD -4634P-01 & TD -4634P-02.
<br />22. CAMERA INSPECTION (PRE/POST) FOR TRENCHLESS METHODS TO BE PERFORMED PER TD -4632P-01.
<br />23. WARNING TAPE IS TO BE INSTALLED IN OPEN TRENCH INSTALLATION OVER GAS PIPELINES IN BOTH TRANSMISSION AND DISTRIBUTION FACILITIES. THIS INCLUDES BELL HOLES, EXCAVATIONS FOR
<br />REPAIR PURPOSES AND RISER REPLACEMENTS PER GS&S L-16.
<br />24. DEVIATIONS FROM THIS APPROVED DESIGN SHALL BE PROCESSED IN ACCORDANCE WITH TD -4014P-05 "FIELD DESIGN CHANGE PROCESS FOR DISTRIBUTION LINES AND DUAL -ASSET FACILITIES."
<br />25. ALL TRENCH SPOILS AND BACKFILL MUST BE USED OR DISPOSED WITH AS REQUIRED BY PG&E SPECIFICATIONS AND ANY LOCAL CITY, COUNTY OR STATE REQUIREMENTS.
<br />26. PG&E TO INSTALL/RESTORE TEMPORARY AND/OR PERMANENT PAVING IN ACCORDANCE WITH PG&E SPECIFICATIONS AND ANY LOCAL CITY, COUNTY OR STATE REQUIREMENTS.
<br />27. STAND-BY REQUIREMENTS MUST BE IN ACCORDANCE WITH TD -5811P-301, TD -5811P-105 & TD -581113-005 WITH WORKING NEAR ANY CRITICAL FACILITIES.
<br />28. MONUMENT PRESERVATION AS REQUIRED BY THE PROFESSIONAL LAND SURVEYORS' ACT (BUSINESS AND PROFESSION CODE SUB -SECTION 8700-8805) SECTION 8771; PRIOR TO THE START OF
<br />CONSTRUCTION, ALL SURVEY MONUMENTS, WITHIN THE PROJECT LIMITS THAT HAVE THE POSSIBILITY OF BEING DAMAGED OR DESTROYED DURING CONSTRUCTION, MUST BE LOCATED, AND
<br />REFERENCED BY A LICENSED LAND SURVEYOR, AND A CORNER OF RECORD OR RECORD OF SURVEY SHALL BE FILED WITH THE COUNTY SURVEYOR. IF ANY OF THESE SURVEY MONUMENTS ARE
<br />DESTROYED, DAMAGED OR COVERED OVER DURING CONSTRUCTION, A NEW MONUMENT AND MONUMENT BOX MUST THEN BE SET IN ITS PLACE, AT THE ORIGINAL LOCATION, BY A LICENSED LAND
<br />SURVEYOR, AND ANOTHER CORNER OF RECORD OR RECORD OF SURVEY FILED WITH THE COUNTY SURVEYOR.
<br />29. CONSTRUCTION MEANS AND METHODS MAY DEVIATE PER FIELD VERIFIED CONDITIONS IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS. IF THERE ARE ANY QUESTIONS, CONTACT
<br />RESPONSIBLE ENGINEER.
<br />CATHODIC PROTECTION IN WORK AREA
<br />ATTENTION FOREMAN:
<br />NOTIFY THE CORROSION DEPT. AT
<br />(925) 383-6468, 48 HOURS PRIOR TO
<br />START OF WORK.
<br />ATTENTION FOREMAN
<br />PRIOR TO STARTING JOB, CONSULT AREA
<br />CORROSION MECHANIC FOR LOCATING WIRE
<br />INSTALLATION AND CATHODIC PROTECTION
<br />REQUIREMENTS
<br />14A P PELNE REPLACEMENT
<br />COUNTRY CLUB AND DELANO PH2
<br />J 0 B DATA
<br />CIIY: SIUCKIUN
<br />COUNTY: SAN JOAQUIN
<br />P LAT:3004-C2-C4. D2 -D4
<br />CPA:3004-1 & 3004-10
<br />TBA: X-02
<br />MAOP: 60 PSIG
<br />NOP: 54 PSIG
<br />APD: 40 PSIG
<br />EZ: 16 -ST -12-C
<br />Installation Tested or Inspected
<br />and Noted on Drawing.
<br />All Corrosion Levels Satisfactory per
<br />PG&E Gas Utility Standard TD -4181S.
<br />Qualified Employee Date
<br />Corrosion mechanics signature is retired when a
<br />CPA boundary is within the scope of the project.
<br />ETS STATION
<br />PLASTIC DEAD END
<br />FINAL GRADE ETS BOX (G-5)
<br />WIRE,
<br />COPPER
<br />#10
<br />YELLOW
<br />PLASTIC MAIN J �EMi
<br />NOTE:
<br />• BRING ALL WIRES AND WIRE CONNECTIONS INTO ETS (0-10)
<br />• ETS CAN BE INSTALLED OFFSET FROM THE GAS FACILITIES
<br />TO AVOID HIGH -TRAFFIC AREAS.
<br />STOCKTON
<br />ETS STATION
<br />STEEL ABANDONMENT
<br />FINAL GRADE ETS BOX (G-5)
<br />5# ZINC ANODE WIRE, COPPER #10
<br />PINK
<br />ABANDONED ABANDONED
<br />STEEL MAIN STEEL MAIN
<br />NOTE:
<br />• BRING WIRE INTO ETS, DO NOT BOND WIRE (TD-950OP-16)
<br />• ENSURE ENOUGH PINK WIRE IS PROVIDED TO EXTEND 2'
<br />BEYOND COVER. LOOP LOCATING WIRE INSIDE F/C.
<br />• ETS CAN BE INSTALLED OFFSET FROM THE ABANDONED
<br />FACIUTIES TO AVOID HIGH -TRAFFIC AREAS.
<br />WIRE, COPPER
<br />ETS STATION
<br />ETS BOX (G-5)
<br />(2) #8 STRANDED WIRES
<br />STEEL MAIN J PLASTIC MAIN PLASTIC MAIN f
<br />NOTE:
<br />DO NOT WELD LOCATING WIRE END FOR END TO STEEL.
<br />THIS CREATES A CURRENT BYPASS AROUND THE #10 WIRE.
<br />ETS BOX (G-5)
<br />WIRE, COPPER #8
<br />BLACK/WHITE
<br />STEEL MAIN
<br />LEGEND
<br />cV
<br />Q
<br />Cl-
<br />z
<br />o
<br />Q
<br />z
<br />�
<br />-HP HP - INSTALL GAS MAIN (SIZE NOTED)
<br />z
<br />o
<br />O
<br />E
<br />o
<br />z
<br />-_
<br />in
<br />�
<br />in
<br />N
<br />u->
<br />II
<br />^
<br />o
<br />HP HP EXISTING GAS MAIN (SIZE NOTED)
<br />M
<br />0
<br />•
<br />\
<br />Cn
<br />U
<br />z
<br />�
<br />4r-HPHP- EXISTING GAS MAIN TO BE ABANDONED (SIZE NOTED)
<br />O
<br />z
<br />U
<br />�
<br />O
<br />C/-)
<br />Lf7
<br />EXISTING GAS SERVICE (SIZE NOTED)
<br />Q
<br />?
<br />CD
<br />EXISTING GAS SERVICE TO BE ABANDONED (SIZE NOTED)
<br />RIGHT OF WAY
<br />mU
<br />N
<br />Z
<br />W
<br />0
<br />N
<br />PROPERTY LINE (NOT ROW)
<br />o
<br />o
<br />&
<br />M
<br />Ln
<br />J
<br />FENCE LINE
<br />:bi
<br />z
<br />o
<br />to
<br />CL
<br />w
<br />z
<br />CL
<br />FREEWAY LINE°
<br />P P EXISTING ELECTRIC PRIMARY LINE
<br />SWR SEWER
<br />W WATER
<br />So STORM DRAIN
<br />z
<br />n
<br />w
<br />o CUT-OFF
<br />O o w
<br />® REPLACE SERVICE
<br />c, z Q
<br />d+
<br />'O
<br />�T CUT, TEST & TRANSFER SERVICE
<br />© CUT-OFF SERVICE
<br />C,
<br />J CD
<br />LD
<br />O.10
<br />w
<br />SIR
<br />© PLUMBING NEEDED
<br />w o J z
<br />I-
<br />Q U w
<br />oC�
<br />A INSTALL REDUCER
<br />z �
<br />Y
<br />¢
<br />t EXISTING REDUCER
<br />c=
<br />C/)z (_-)
<br />E] INSTALL STL-TO-PL TRANSITION FITTING
<br />c Ln
<br />INSTALL ELECTROFUSION COUPLING
<br />:5 EXISTING PRESSURE CONTROL FITTING
<br />Q Lz
<br />n
<br />INSTALL PRESSURE CONTROL FITTING
<br />D INSTALL CAP
<br />I END OF MAIN MARKER
<br />EXISTING ETS STATION
<br />INSTALL ETS STATION
<br />a
<br />INSTALL ELECTRONIC MARKER BALL
<br />INSTALL 3 -WAY TEE
<br />N
<br />0
<br />Y
<br />T ELBOW
<br />INSTALL ANODE
<br />o
<br />a INSTALL VALVE W/ FRAME AND COVER
<br />® EXISTING VALVE W/ FRAME AND COVER
<br />o
<br />2542-G3-15 PLAT MAP & BLOCK NUMBER
<br />(T) TIES INTO GAS SYSTEM
<br />(DE) DEAD END GAS MAIN
<br />INSTALL HVTT
<br />i EXISTING HVTT
<br />INSTALL SERVICE TEE
<br />Z
<br />0
<br />^J INSTALL EFV
<br />N EXISTING EFV
<br />>
<br />O MANHOLE
<br />® DRAIN INLET
<br />w
<br />DETAIL NO. DETAIL CALLOUT
<br />0
<br />PAGE NO.
<br />CONTACTS
<br />"►ri
<br />2 1 INCH 0
<br />cV
<br />Q
<br />Cl-
<br />z
<br />o
<br />Q
<br />z
<br />�
<br />z
<br />O
<br />E
<br />o
<br />z
<br />-_
<br />D
<br />c
<br />0
<br />z
<br />0
<br />Y
<br />C�
<br />C -D
<br />¢
<br />U
<br />M
<br />0
<br />Cn
<br />U
<br />z
<br />�
<br />O
<br />z
<br />U
<br />�
<br />O
<br />C/-)
<br />Q
<br />CD
<br />2 1 INCH 0
<br />
|