Laserfiche WebLink
E <br />R1 <br />1 2 3 4 5 6 7 8 9 10 <br />74 <br />K �f2 <br />a <br />D- <br />00 Z <br />� P <br />e'J <br />kit' <br />Club <br />ri <br />L �' �- <br />a <br />0 <br />WORK AREA <br />__4 <br />WORK SUMMARY <br />• INSTALL 5380' OF 4" PLASTIC HP MAIN <br />• INSTALL 4607' OF 2" PLASTIC HP MAIN <br />• ABANDON 5371' OF 4" STEEL HP MAIN <br />• ABANDON 5026' OF 2" STEEL HP MAIN <br />• ABANDON 229' OF 2" PLASTIC HP MAIN <br />9 ABANDON 286' OF 1-1/4" PLASTIC HP MAIN <br />• REPLACE 128 STEEL OR ALDYL-A SERVICES <br />• TRANSFER 14 PLASTIC SERVICE TO NEW MAIN <br />• CUT-OFF 2 STEEL SERVICES <br />C PROJECT NOTES <br />1. IF STOPPING FLOW AT A TIE-IN, INTALL A TEMPORARY 1" BYPASS NO LONGER THAN 25'. <br />2. PULL CARRIER CABLE SIZE 8 AND LOCATING WIRE FROM WEST TIE IN LOCATION ON COUNTRY CLUB AND MOERING TO EAST TIE IN LOCATION ON COUNTRY CLUB AT FRANKLIN INCLUDING, ALL <br />STL-PL TIE-INS. MODIFIED TYPE G ETS WITH #8 WIRES IN LIEU OF #10 WIRES AT ALL STL-PL TIE-INS. REVIEW CPRF FOR ALL DETAILS. <br />3. MAINTAIN 7.5' IN CAL TRANS CROSSING. <br />4. THIS IS A PHASE 2 JOB WITH PM31512733. TIE IN LOCATION IS JUST EAST OF EASTERN INTERSECTION OF FRANKLIN AVE AND COUNTRY CLUB BLVD. IN FRONT OF 2108 COUNTRY CLUB BLVD. <br />* ESTIMATING JOB WALK COMPLETED ON 07/15/2021. PREFERRED METHOD OF CONSTRUCTION TO BE <br />BORED FOR MAIN INSTALLATION AND BORED FOR SERVICE INSTALLATION, PER GC REPRESENTATIVE. <br />GAS NOTES <br />N <br />.l1 <br />1. PRIOR TO STARTING WORK, CONTACT LOCAL AREA CORROSION SUPERVISOR REGARDING CATHODIC PROTECTION REQUIREMENTS AND I&R SUPERVISOR REGARDING ANY SHUTDOWN, ABANDONMENT, OR <br />TIE-IN OF ANY MAINS WHICH MAY AFFECT ANY DISTRICT REGULATOR STATION. <br />2. ALL STEEL TIE-INS, CUT OFFS AND CAPPING OF CAST IRON AND STEEL MAIN PER A-36 AND C-37. <br />3. ALL PLASTIC CONNECTIONS TO BE PERFORMED IN ACCORDANCE WITH THE APPROPRIATE PROCEDURES LISTED IN TD -41705. <br />4. UNLESS OTHERWISE NOTED, CONSTRUCTION TO REFERENCE TD -4125P-09 TO DETERMINE EXISTING STEEL PIPE SPECS. <br />5. ALL ARC WELDING IS TO BE PERFORMED IN ACCORDANCE WITH THE GAS WELDING CONTROL MANUAL TD -4160M. REFER TO TD -4160P-20 FOR GENERAL WELDING REQUIREMENTS. <br />6. PURGE MAINS 10" IN DIAMETER & LESS PER GS&S A-38, ATTACHMENT A, PROCEDURE 2. PURGE MAINS GREATER THAN 10" IN DIAMETER PER GS&S A-38, ATTACHMENT A, PROCEDURE 3. <br />7. ABANDON ALL UNDERGROUND GAS FACILITIES PER UTILITY PROCEDURE TD-950OP-16 & GS&S A-93.2. <br />8. FOLLOW ALL MINIMUM INSTALLATION DEPTHS AND CLEARANCES TO OTHER FACILITIES FOR TRANSMISSION, DISTRIBUTION AND SERVICE PIPE AS OUTLINED IN GS&S A-04. FOR JOINT TRENCH <br />INSTALLATIONS, REFERENCE U.O. STANDARD S5453. <br />9. ALL GAS RISERS ARE TO BE INSTALLED IN ACCORDANCE WITH GS&S J-15 & J-15.1. <br />10. INSTALL METER PROTECTION PER GS&S J-95. <br />11. VENT REGULATORS PER GS&S H-93. <br />12. LOCATION OF EXISTING UTILITIES ARE APPROXIMATE. CALL UNDERGROUND SERVICES ALERT (USA) TO CONFIRM. <br />13. CONSTRUCTION SHALL REPORT ALL OPERATIONAL CHANGES IN ACCORDANCE WITH PROCEDURES LISTED IN TD -4441P-03. <br />14. ALL STEEL RISERS ARE TO BE REPLACED WITH NON CORRODIBLE RISERS OR REPLACED BY USING THE RISER INSERT RENEWAL INSTALLATION PER GS&S A-90. <br />15. ALL SERVICES AND MAINS TO BE TESTED PRIOR TO TIE-IN PER GS&S A-34. IF MAIN TEST DATA IS NOT RECORDED ON THIS DRAWING, REFER TO THE ASSOCIATED OPERATIONAL CHANGE NOTICE. <br />FOR SERVICE TEST DATA, REFER TO THE GAS SERVICE RECORD. <br />16. INSTALL PLASTIC MAIN, SERVICES, & LOCATING WIRE PER GS&S A-34, A-90, A-90.2, A-90.3, A-91, A-93, A-93.1, A-93.3, UTILITY STANDARD TD -41705, D-34 & CORROSION CONTROL <br />STANDARD TD -4181S. <br />17. INSTALL ANODES PER CORROSION CONTROL MANUAL 0-13.1. <br />18. INSTALL ELECTROLYSIS TEST STATIONS PER CORROSION CONTROL MANUAL 0-10 AND 0-10.1. IF PRACTICAL, INSTALL ETS STATION OUT OF THE ROADWAY. <br />19. ALL EXCAVATION TO BE PERFORMED PER TD -5811M, TD -5811P-301, TD -5811P-105, TD -4412P-05, AND TD -4621S. STANDBY REQUIRED IF EXCAVATING WITHIN 5' OFA CRITICAL FACILITY, <br />BORING ACTIVITY THAT CROSSES OR THAT PARALLELS WITHIN 10' OF A CRITICAL FACILITY. CONTACT THE CONSTRUCTION SUPERVISOR. <br />20. NOTIFY SCHOOLS AND HOSPITALS WITHIN 500' OF PROPOSED EXCAVATION FOR GAS FACILITIES A MINIMUM OF 3 DAYS PRIOR TO DIGGING PER AB 1937. <br />21. ANY PIPE REPLACEMENT VIA SPLITTING TO BE DONE PER TD -4634P-01 & TD -4634P-02. <br />22. CAMERA INSPECTION (PRE/POST) FOR TRENCHLESS METHODS TO BE PERFORMED PER TD -4632P-01. <br />23. WARNING TAPE IS TO BE INSTALLED IN OPEN TRENCH INSTALLATION OVER GAS PIPELINES IN BOTH TRANSMISSION AND DISTRIBUTION FACILITIES. THIS INCLUDES BELL HOLES, EXCAVATIONS FOR <br />REPAIR PURPOSES AND RISER REPLACEMENTS PER GS&S L-16. <br />24. DEVIATIONS FROM THIS APPROVED DESIGN SHALL BE PROCESSED IN ACCORDANCE WITH TD -4014P-05 "FIELD DESIGN CHANGE PROCESS FOR DISTRIBUTION LINES AND DUAL -ASSET FACILITIES." <br />25. ALL TRENCH SPOILS AND BACKFILL MUST BE USED OR DISPOSED WITH AS REQUIRED BY PG&E SPECIFICATIONS AND ANY LOCAL CITY, COUNTY OR STATE REQUIREMENTS. <br />26. PG&E TO INSTALL/RESTORE TEMPORARY AND/OR PERMANENT PAVING IN ACCORDANCE WITH PG&E SPECIFICATIONS AND ANY LOCAL CITY, COUNTY OR STATE REQUIREMENTS. <br />27. STAND-BY REQUIREMENTS MUST BE IN ACCORDANCE WITH TD -5811P-301, TD -5811P-105 & TD -581113-005 WITH WORKING NEAR ANY CRITICAL FACILITIES. <br />28. MONUMENT PRESERVATION AS REQUIRED BY THE PROFESSIONAL LAND SURVEYORS' ACT (BUSINESS AND PROFESSION CODE SUB -SECTION 8700-8805) SECTION 8771; PRIOR TO THE START OF <br />CONSTRUCTION, ALL SURVEY MONUMENTS, WITHIN THE PROJECT LIMITS THAT HAVE THE POSSIBILITY OF BEING DAMAGED OR DESTROYED DURING CONSTRUCTION, MUST BE LOCATED, AND <br />REFERENCED BY A LICENSED LAND SURVEYOR, AND A CORNER OF RECORD OR RECORD OF SURVEY SHALL BE FILED WITH THE COUNTY SURVEYOR. IF ANY OF THESE SURVEY MONUMENTS ARE <br />DESTROYED, DAMAGED OR COVERED OVER DURING CONSTRUCTION, A NEW MONUMENT AND MONUMENT BOX MUST THEN BE SET IN ITS PLACE, AT THE ORIGINAL LOCATION, BY A LICENSED LAND <br />SURVEYOR, AND ANOTHER CORNER OF RECORD OR RECORD OF SURVEY FILED WITH THE COUNTY SURVEYOR. <br />29. CONSTRUCTION MEANS AND METHODS MAY DEVIATE PER FIELD VERIFIED CONDITIONS IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS. IF THERE ARE ANY QUESTIONS, CONTACT <br />RESPONSIBLE ENGINEER. <br />CATHODIC PROTECTION IN WORK AREA <br />ATTENTION FOREMAN: <br />NOTIFY THE CORROSION DEPT. AT <br />(925) 383-6468, 48 HOURS PRIOR TO <br />START OF WORK. <br />ATTENTION FOREMAN <br />PRIOR TO STARTING JOB, CONSULT AREA <br />CORROSION MECHANIC FOR LOCATING WIRE <br />INSTALLATION AND CATHODIC PROTECTION <br />REQUIREMENTS <br />14A P PELNE REPLACEMENT <br />COUNTRY CLUB AND DELANO PH2 <br />J 0 B DATA <br />CIIY: SIUCKIUN <br />COUNTY: SAN JOAQUIN <br />P LAT:3004-C2-C4. D2 -D4 <br />CPA:3004-1 & 3004-10 <br />TBA: X-02 <br />MAOP: 60 PSIG <br />NOP: 54 PSIG <br />APD: 40 PSIG <br />EZ: 16 -ST -12-C <br />Installation Tested or Inspected <br />and Noted on Drawing. <br />All Corrosion Levels Satisfactory per <br />PG&E Gas Utility Standard TD -4181S. <br />Qualified Employee Date <br />Corrosion mechanics signature is retired when a <br />CPA boundary is within the scope of the project. <br />ETS STATION <br />PLASTIC DEAD END <br />FINAL GRADE ETS BOX (G-5) <br />WIRE, <br />COPPER <br />#10 <br />YELLOW <br />PLASTIC MAIN J �EMi <br />NOTE: <br />• BRING ALL WIRES AND WIRE CONNECTIONS INTO ETS (0-10) <br />• ETS CAN BE INSTALLED OFFSET FROM THE GAS FACILITIES <br />TO AVOID HIGH -TRAFFIC AREAS. <br />STOCKTON <br />ETS STATION <br />STEEL ABANDONMENT <br />FINAL GRADE ETS BOX (G-5) <br />5# ZINC ANODE WIRE, COPPER #10 <br />PINK <br />ABANDONED ABANDONED <br />STEEL MAIN STEEL MAIN <br />NOTE: <br />• BRING WIRE INTO ETS, DO NOT BOND WIRE (TD-950OP-16) <br />• ENSURE ENOUGH PINK WIRE IS PROVIDED TO EXTEND 2' <br />BEYOND COVER. LOOP LOCATING WIRE INSIDE F/C. <br />• ETS CAN BE INSTALLED OFFSET FROM THE ABANDONED <br />FACIUTIES TO AVOID HIGH -TRAFFIC AREAS. <br />WIRE, COPPER <br />ETS STATION <br />ETS BOX (G-5) <br />(2) #8 STRANDED WIRES <br />STEEL MAIN J PLASTIC MAIN PLASTIC MAIN f <br />NOTE: <br />DO NOT WELD LOCATING WIRE END FOR END TO STEEL. <br />THIS CREATES A CURRENT BYPASS AROUND THE #10 WIRE. <br />ETS BOX (G-5) <br />WIRE, COPPER #8 <br />BLACK/WHITE <br />STEEL MAIN <br />LEGEND <br />cV <br />Q <br />Cl- <br />z <br />o <br />Q <br />z <br />� <br />-HP HP - INSTALL GAS MAIN (SIZE NOTED) <br />z <br />o <br />O <br />E <br />o <br />z <br />-_ <br />in <br />� <br />in <br />N <br />u-> <br />II <br />^ <br />o <br />HP HP EXISTING GAS MAIN (SIZE NOTED) <br />M <br />0 <br />• <br />\ <br />Cn <br />U <br />z <br />� <br />­4r-HPHP- EXISTING GAS MAIN TO BE ABANDONED (SIZE NOTED) <br />O <br />z <br />U <br />� <br />O <br />C/-) <br />Lf7 <br />EXISTING GAS SERVICE (SIZE NOTED) <br />Q <br />? <br />CD <br />EXISTING GAS SERVICE TO BE ABANDONED (SIZE NOTED) <br />RIGHT OF WAY <br />mU <br />N <br />Z <br />W <br />0 <br />N <br />PROPERTY LINE (NOT ROW) <br />o <br />o <br />& <br />M <br />Ln <br />J <br />FENCE LINE <br />:bi <br />z <br />o <br />to <br />CL <br />w <br />z <br />CL <br />FREEWAY LINE° <br />P P EXISTING ELECTRIC PRIMARY LINE <br />SWR SEWER <br />W WATER <br />So STORM DRAIN <br />z <br />n <br />w <br />o CUT-OFF <br />O o w <br />® REPLACE SERVICE <br />c, z Q <br />d+ <br />'O <br />�T CUT, TEST & TRANSFER SERVICE <br />© CUT-OFF SERVICE <br />C, <br />J CD <br />LD <br />O.10 <br />w <br />SIR <br />© PLUMBING NEEDED <br />w o J z <br />I- <br />Q U w <br />oC� <br />A INSTALL REDUCER <br />z � <br />Y <br />¢ <br />t EXISTING REDUCER <br />c= <br />C/)z (_-) <br />E] INSTALL STL-TO-PL TRANSITION FITTING <br />c Ln <br />INSTALL ELECTROFUSION COUPLING <br />:5 EXISTING PRESSURE CONTROL FITTING <br />Q Lz <br />n <br />INSTALL PRESSURE CONTROL FITTING <br />D INSTALL CAP <br />I END OF MAIN MARKER <br />EXISTING ETS STATION <br />INSTALL ETS STATION <br />a <br />INSTALL ELECTRONIC MARKER BALL <br />INSTALL 3 -WAY TEE <br />N <br />0 <br />Y <br />T ELBOW <br />INSTALL ANODE <br />o <br />a INSTALL VALVE W/ FRAME AND COVER <br />® EXISTING VALVE W/ FRAME AND COVER <br />o <br />2542-G3-15 PLAT MAP & BLOCK NUMBER <br />(T) TIES INTO GAS SYSTEM <br />(DE) DEAD END GAS MAIN <br />INSTALL HVTT <br />i EXISTING HVTT <br />INSTALL SERVICE TEE <br />Z <br />0 <br />^J INSTALL EFV <br />N EXISTING EFV <br />> <br />O MANHOLE <br />® DRAIN INLET <br />w <br />DETAIL NO. DETAIL CALLOUT <br />0 <br />PAGE NO. <br />CONTACTS <br />"►ri <br />2 1 INCH 0 <br />cV <br />Q <br />Cl- <br />z <br />o <br />Q <br />z <br />� <br />z <br />O <br />E <br />o <br />z <br />-_ <br />D <br />c <br />0 <br />z <br />0 <br />Y <br />C� <br />C -D <br />¢ <br />U <br />M <br />0 <br />Cn <br />U <br />z <br />� <br />O <br />z <br />U <br />� <br />O <br />C/-) <br />Q <br />CD <br />2 1 INCH 0 <br />