My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7530 - SP7534
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP7508 -
>
SP7530 - SP7534
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 10:03:06 AM
Creation date
12/21/2023 11:17:18 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Tully Road Resurfacing
Limits
2,617' South of Baker Road to Comstock Road
Year
2022
Roads Worked
Tully Rd.
Red Lines
Yes
Project #
222116
Districts
District 4
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7530 - SP7534
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
awnv rRUUQo 1 <br />LEGEND: <br />140 <br />Place 0.25' HMA Overlay <br />0.25' Depth of Cold Plane Pavement <br />■ Limits of Cold Plane Pavement <br />ROAD <br />105 <br />* Payment for this work must be considered as included in <br />the contract unit price for Earthwork (Miscellaneous Areas) <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER <br />%. Versid 02/22 1 <br />NO SCALE <br />DATE <br />2.1►C4z.? <br />PLAN <br />CHECKED DATE <br />/-/T (A Z/'S/Z7 <br />115 <br />II <br />O <br />END PROJECT j o <br />M <br />I <br />O <br />�QW <br />II <br />QQ <br />(�Q_ <br />155 <br />II <br />N <br />cn <br />_ <br />07 <br />co <br />0 00 <br />N O <br />00 (0 C7 <br />Ut <br />+ � <br />V O <br />J O O3 <br />O <br />W O <br />c0 c0 D <br />rn <br />3 <br />oo O <br />O <br />O <br />00 3 <br />W G <br />O <br />O <br />CD <br />O_ <br />�a <br />N <br />rC/)r <br />CD <br />O <br />: <br />M <br />N <br />,D <br />+ <br />C <br />±o <br />+r,-i�, <br />a By <br />+ <br />Q <br />+ <br />D g <br />C) <br />+ <br />Cf) <br />o <br />Wm <br />Q <br />a <br />W .moi <br />O O <br />CA <br />U1 <br />Q <br />0 <br />o <br />Q <br />0 <br />+ <br />X-� <br />Usi,,1 3 hit i 4 `r'e".;7 7hb J''_t: :..,� <br />rrr <br />07 <br />:T <br />.� <br />By Inst. ,asp + 1.s0 SftG 0t `°j0(k <br />r-1- <br />O <br />0DII <br />�� <br />Dm <br />* Payment for this work must be considered as included in <br />the contract unit price for Earthwork (Miscellaneous Areas) <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER <br />%. Versid 02/22 1 <br />NO SCALE <br />DATE <br />2.1►C4z.? <br />PLAN <br />CHECKED DATE <br />/-/T (A Z/'S/Z7 <br />115 <br />II <br />O <br />END PROJECT j o <br />M <br />I <br />�M <br />�QW <br />II <br />QQ <br />(�Q_ <br />155 <br />II <br />I I U) <br />cn <br />_ <br />07 <br />co <br />0 00 <br />N O <br />00 (0 C7 <br />II 0 <br />+ � <br />V O <br />J O O3 <br />O <br />W O <br />c0 c0 D <br />rn <br />3 <br />oo O <br />O <br />O <br />00 3 <br />O <br />O <br />O <br />m <br />O_ <br />O <br />N <br />Cn <br />* Payment for this work must be considered as included in <br />the contract unit price for Earthwork (Miscellaneous Areas) <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER <br />%. Versid 02/22 1 <br />NO SCALE <br />DATE <br />2.1►C4z.? <br />PLAN <br />CHECKED DATE <br />/-/T (A Z/'S/Z7 <br />115 <br />II <br />O <br />END PROJECT j o <br />M <br />160 / <br />Q_ <br />M <br />145 <br />150 <br />155 <br />I I U) <br />cn <br />�Q <br />07 <br />co <br />cn <br />M <br />cn <br />co <br />cn <br />O <br />rn <br />fi <br />: <br />Q <br />rn <br />cn <br />Q <br />m <br />H- 1 �I _ A �, <br />Mm <br />s I V V <br />cn <br />cn <br />+ <br />C <br />+ <br />+r,-i�, <br />a By <br />+ <br />Q <br />+ <br />o <br />° <br />� <br />`;�s_3y. - <br />C <br />U1 <br />Q <br />0 <br />o <br />0 <br />X-� <br />Usi,,1 3 hit i 4 `r'e".;7 7hb J''_t: :..,� <br />0 <br />.� <br />By Inst. ,asp + 1.s0 SftG 0t `°j0(k <br />r-1- <br />* Payment for this work must be considered as included in <br />the contract unit price for Earthwork (Miscellaneous Areas) <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER <br />%. Versid 02/22 1 <br />NO SCALE <br />DATE <br />2.1►C4z.? <br />PLAN <br />CHECKED DATE <br />/-/T (A Z/'S/Z7 <br />115 <br />II <br />O <br />END PROJECT j o <br />M <br />160 / <br />Q_ <br />M <br />g cn m <br />Q <br />h <br />�G <br />I I U) <br />::E <br />0 <br />1-0- <br />00 O I I ° <br />N <br />+ o <br />JO <br />OO 0 N <br />3 <br />O <br />TULLY ROAD RESURFACING <br />(2,617' South of Baker Road to Comstock Road) <br />Sheet No. <br />3of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.