Laserfiche WebLink
(z <br />0 <br />PORTABLE CHANGEABLE MESSAGE SIGN <br />Locations Quantity (EA) <br />State Route 12 2 <br />Acampo Road 1 <br />Total 3 <br />SHOULDER BACKING <br />Location Quantity (TON) <br />Sta 30+14 to Sta 144+44 (Lt & Rt) 1,822 <br />Total 1,822 <br />ASPHALTIC <br />EMULSION <br />(FOG SEAL <br />COAT) <br />Location <br />Quantity <br />Quantity <br />(SQYD) <br />Sta 10+58 to <br />Sta 29+15 (Lt <br />& Rt) <br />1,650 <br />Sta 76+77 to <br />Sta 86+06 (Lt <br />& Rt) <br />826 <br />Sta <br />30+14 <br />Total <br />2,476 <br />PENETRATION TREATMENT <br />Location Quantity (SQYD) <br />12 Locations (Intersection Radii) Total 805 <br />DRIVEWAY (TYPE D) <br />Location Quantity (SQYD) <br />3 Locations Total 88 <br />DRIVEWAY (TYPE E) <br />Location Quantity (SQYD) <br />10 Locations Total 403 <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE I PROJECT ENGINEER <br />A.FELIX 3/2022 <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity (TON) <br />Mainline (Includes TE) 5,797 <br />Intersection Conform Areas 153 <br />Driveways (Type D & E) 6 <br />,-.........Pavement Rip r <br />Total 5,957 <br />COLD <br />PLANE PAVEMENT <br />Location <br />Sta 11+23 <br />Quantity <br />(SQYD) <br />Bruella Road <br />Sta 10+58 to <br />Sta <br />11+00 <br />200 <br />Sta 11+00 to <br />Sta <br />29+14 <br />4,959 <br />Sta 29+14 to <br />Sta <br />30+14 <br />262 <br />Sta 76+77 to <br />Sta <br />77+77 <br />266 <br />Sta 77+77 to <br />Sta <br />86+06 <br />2,256 <br />Sta 92+83 to <br />Sta <br />94+00 <br />347 <br />Sta 143+44 to <br />Sta <br />144+44 <br />357 <br />Intersection Conforms <br />Kirschenman Road <br />Sta 10+12 <br />to Sta <br />10+62 <br />163 <br />Schmiedt Road <br />Sta 9+38 <br />to Sta <br />9+88 <br />298 <br />Sta 10+12 <br />to Sta <br />10+62 <br />127 <br />Orchard Road <br />Sta 9+38 <br />to Sta <br />9+88 <br />132 <br />Sta 10+12 <br />to Sta <br />10+62 <br />200 <br />Total <br />9,567 <br />PAVEMENT REPAIR <br />Location Quantity (SQYD) <br />12 Locations Total 44 <br />NO SCALE I SUMMARY OF QUANTITIES <br />DATE CHECKED DATE <br />t Jf .,-I <br />ADJUST FRAME AND COVER <br />(STORM DRAIN MAINTENANCE HOLE) <br />Location <br />Quantity (EA) <br />Sta 11+23 <br />(4' Lt) <br />1 <br />Sta 12+61 <br />(4' Lt) <br />1 <br />Sta 15+10 <br />(6' Lt) <br />1 <br />Sta 18+19 <br />(6' Lt) <br />1 <br />Sta 23+26 <br />(5' Lt) <br />1 <br />Total 5 <br />PLACE MONUMENT FRAME AND COVER <br />Location Quantity (EA) <br />Sta 118+15 (8' Rt) 1 <br />Total 1 <br />ADJUST FRAME AND COVER <br />(MONUMENT) <br />Location Quantity (EA) <br />Sta 65+87 (10' Lt) 1 <br />Sta 118+18 (8' Rt) 1 <br />Total 2 <br />ADJUST FRAME AND COVER <br />(WATER VALVE) <br />Location Quantity (EA) <br />Sta 11 +26 (8' Rt) 1 <br />Sta 27+55 (8' Rt Multiple) 4 <br />Total 5 <br />BRUELLA ROAD RESURFACING <br />( State Route 12 to Acampo Road) <br />Sheet No. <br />5 of 5 <br />