My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2115 - SP2126
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1878 - SP2416
>
SP2115 - SP2126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 8:41:10 AM
Creation date
12/21/2023 1:17:06 PM
Metadata
Fields
Template:
Small Plans - SP
Project
East Stockton Streets Resurfacing Phase 1
Limits
Carmellia Avenue, Ardelle Avenue, Sonora Street, Hobart Avenue, Lafayette Street, Dana Avenue, Washington Street, Adrienne Avenue, Anthony Avenue, Thelma Avenue, May Avenue
Year
2000
Project Engineer
Kaila Coppal
Roads Worked
Carmellia Ave., Ardelle Ave., Sonora St., Hobart Ave.
Lafayette St., Dana Ave., Washington St.
Adrienne Ave., Anthony Ave., Thelma Ave., May Ave.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP2115 - SP2126
Type
Resurfacing
Document Relationships
Adrienne Street (Stockton)
(Message)
Path:
\VAULT MAPS\*CARD CATALOG*\A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br />0 <br />n <br />M D <br />m n <br />� D <br />.C-) -T1 <br />o M <br />X- <br />Z <br />D <br />K <br />fi m <br />CD <br />En <br />1-1 <br />0 <br />Z3 <br />i <br />0 <br />N� <br />0 <br />,mow > <br />,,Off <br />X <br />NOTE: Portion of existing concrete driveways from edge of <br />pavement to 4' beyond shall be removed. Concrete shall be <br />be saw cut to provide a neat straight joint at the conform <br />line. Final list to be provided by the Engineer. Payment for <br />removing concrete shall be considered as pay Item EXISTING <br />HIGHWAY FACILITIES (Removing Concrete). Driveways shall be <br />considered as pay Item DRIVEWAYS TYPE "D". <br />Ardelle Avenue: <br />EP <br />Station 3+65-4'x24' <br />(Lt.) <br />Station 5+22-4'x20' <br />(Rt.) <br />Station 18+55-4'x16' <br />(Rt.) <br />Carmellia Avenue: <br />Station 5+22-4'x32' (Rt.) <br />Dana Avenue: <br />Station 13+60-4'x22' (Lt.) <br />See Note _ <br />Hobart Avenue: <br />EP <br />Station <br />9+89-4'x16' <br />4 <br />(Rt.) <br />Station <br />10+65-4'x15' <br />Hobart Ave. <br />(Lt.) <br />Station <br />21 +08-4'x12' <br />May Ave. <br />(Lt.) <br />Sonora <br />Street: <br />Station <br />2+56-4'x20' <br />(Rt.) <br />Station <br />9+00-4'x16' <br />(Rt.) <br />Thelma <br />Avenue: <br />Station 8+48-4'x22' (Rt.) <br />r..!_L!_ <br />Note: Concrete <br />4' Min. Width, length and locations <br />to be determined by the Engineer. <br />PAVEMENT REPAIR DETAIL <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE I PROJECT ENGINEER DATE CH <br />/0,.,c,47'Ka;n o 2/2000 Ka4','a- C#'f.f Z/y/oo <br />5' at S t a <br />5' at Sta <br />*10' at Sta <br />• 2' at Sta <br />• 10' at Sta <br />• 2' at Sta <br />• 2' at Sto <br />• 3' at Sta <br />• 10' at Sta <br />EP - Conform @ E.P. <br />4' 1:1 <br />�- Conform <br />15+75 (Rt.) Hobart Ave.------ 12' Min. <br />20+51 (Lt.) Hobart Ave. <br />Existing Width <br />26+65 (Lt.) Ardelle Ave. 0.30' Asphalt Concrete over shaped <br />and compacted native material. <br />TYPE D <br />RECORD DRAWING <br />Corrections By- <br />No Changes By Ja, ,44rony <br />Date_ /z%7/pa <br />Any Person usi9,g i nis urawing briould Verify <br />All information By inspecting The Site Of Work. <br />2+60 (Rt.) Thelma Ave. Variable depth Asphalt Concrete <br />26+65 (Rt.) Ardelle Ave. over existing paved driveway. <br />TYPE E <br />R = Conform to <br />existing radii TYPICAL DRIVEWAYS <br />NO SCALE 1 CONSTRUCTION DETAILS I EAST STOCKTON STREETS RESURFACING PHASE1 <br />.CK D DATE SUBMIT DATE DATE AP ROVA ECOMMENDED DATE 7/001 fAWa� <br />Sheet No. <br />10 of 12 <br />EP <br />4 <br />10+00 (Rt.) <br />i- <br />Anthony Ave <br />22+80 (Rt.) <br />Hobart Ave. <br />1+12 (Rt.) <br />May Ave. <br />3+20 (Rt.) <br />May Ave. <br />2+60 (Rt.) Thelma Ave. Variable depth Asphalt Concrete <br />26+65 (Rt.) Ardelle Ave. over existing paved driveway. <br />TYPE E <br />R = Conform to <br />existing radii TYPICAL DRIVEWAYS <br />NO SCALE 1 CONSTRUCTION DETAILS I EAST STOCKTON STREETS RESURFACING PHASE1 <br />.CK D DATE SUBMIT DATE DATE AP ROVA ECOMMENDED DATE 7/001 fAWa� <br />Sheet No. <br />10 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.