Laserfiche WebLink
x <br />M <br />0 <br />z <br />CLEAN DRAINAGE FACILITIES <br />ASPHALT <br />(DRIVEWAY <br />PIPES) <br />Location <br />Quantity <br />Sta. <br />256+75 (Rt.) <br />Begin and End Overlay <br />Sta. <br />257+50 (Rt.) <br />Bridge Conform, South <br />Sta. <br />261+60 (Rt.) <br />Bridge Conform, North <br />Sta. <br />270+75 (Rt.)Lump <br />Sum <br />Sta. <br />271+15 (Rt.) <br />Sta. 285+64 to Sta. 289+67 <br />Sta. <br />272+05 (Rt.) <br />Sta. 351 +85 to Sta. 353+44 <br />Sta. <br />350+95 (Rt.) <br />PAVEMENT REPAIR <br />Location Quantity <br />4 Locations 184 S.Y. <br />REMOVE AND DISPOSE <br />METAL BEAM GUARD RAILING <br />Location Quantity <br />Sta. 275+29 Rt. Lump Sum <br />Sta. 279+60 Lt. <br />PLANING <br />ASPHALT <br />FRAME <br />CONCRETE <br />PAVEMENT <br />Quantity <br />Location <br />Quantity <br />Begin and End Overlay <br />297 <br />S.Y. <br />Bridge Conform, South <br />Approach 68 <br />S.Y. <br />Bridge Conform, North <br />Approach 416 <br />S.Y. <br />10 Intersections <br />626 <br />S.Y. <br />Sta. 285+64 to Sta. 289+67 <br />(Lt.) 124 <br />S.Y. <br />Sta. 351 +85 to Sta. 353+44 <br />(Lt.) 53 <br />S.Y. <br />Total 1,584 <br />S.Y. <br />ADJUST 18" SDI <br />Location Quantity <br />Sta. 240+54 (Rt.) 1 Each <br />ADJUST <br />MONUMENT <br />FRAME <br />AND COVER <br />Location <br />Quantity <br />Sta. 240+56 (Rt.) <br />1 Each <br />Sta. 268+10 (Rt.) <br />1 Each <br />Sta. 298+95 (Rt.) <br />1 Each <br />Sta. 311+85 (Rt.) <br />2 Each <br />n tacn <br />ADJUST WATER VALVE <br />FRAME AND COVER <br />Location Quantity <br />Sta. 311+83 (Rt.) 1 Each <br />Sta. 312+00 (Rt.) 1 Each <br />Sta. 326+63 (Rt.) 2 Each <br />Total 4 Each <br />IMPORTED BORROW (TOPSOIL) <br />Location Quantity <br />5 Locations 13 C.Y. <br />DRIVEWAYS <br />Location Quantity <br />2 Locations (Type D) 57 S.Y. <br />40 Locations (Type E) 2,273 S.Y. <br />SHOULDER BACKING <br />Location Quantity <br />Sta. 236+00 to Sta 351+85 (Rt.) 537 Tons <br />ASPHALT CONCRETE <br />(TYPE A <br />Location Quantity <br />Mainline 6,959 Tons <br />Intersections 278 Tons <br />Pavement Repair 140 Tons <br />Total 7,377 Tons <br />ASPHALT CONCRETE <br />(TYP E B <br />Location Quantity <br />Driveways 269 Tons �QPwr� <br />A.C. (Misc. Areas) 5 Tons <br />Total 274 Tons .► <br />i�\ ExP+nes:3/3i fa <br />D COUNTY OF SAN JOAQUIN N. 99 FRONTAGE ROAD EAST RESURFACING Sheet No. <br />m NO SCALE SUMMARY OF QUANTITIES (300' N/0 Fop piano Lane to 600' S/0 Eight Mile Road) 11 of 12 <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPROV RECOMMENDED DATE <br />J. M. Levers 8/00/��dl /��/ j�j� 3 Z1�/o <br />