My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP2296 - SP2307
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP1878 - SP2416
>
SP2296 - SP2307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 8:55:29 AM
Creation date
12/21/2023 2:15:22 PM
Metadata
Fields
Template:
Small Plans - SP
Project
N. 99 Frontage Road East Resurfacing
Limits
300' N/O Foppiano Lane to 600' S/O Eight Mile Road
Year
2001
Project Engineer
Michael Selling
Roads Worked
N. 99 Frontage Rd. (East)
Red Lines
No
Federal #
STPL-5929(113)
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP2296 - SP2307
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const. <br />Exist PCC Curb (Typ.) <br />Portions to be <br />replaced. See Curb <br />Detail this sheet. f` <br />7051 <br />Limits of Clearing and Grubbing <br />and Mailbox Relocation <br />F------- <br />20' , 2'-6' * 11' <br />Var. _ Vo r. <br />Conform <br />(0.04' Thick) <br />D Existing Roadway L Variable depth Shoulder <br />0 Backing or Imported <br />o Borrow (Topsoil) <br />SHOULDER DETAIL <br />Lit o <br />D <br />M <br />M <br />70 <br />91 <br />70 <br />0 <br />z <br />q <br />Const. <br />Limits of Clearing land Grubbing and <br />and Mailbox Relocation <br />4' 12' 12 4 See Shld. <br />Details <br />Pavement Reinforcing Fabric <br />1 <br />1-0. 17' <br />0.25' Asphalt Concrete <br />Existing Roadway <br />NOF <br />Place New PC <br />(Type 33) pei <br />Standard Plar <br />Remove poi <br />existing cur <br />of exist. ro <br />M COUNTY OF SAN J OAQUIN <br />DRAWN BY I DATE I PROJECT ENGINEER <br />J. M. Levers 1 8/00 <br />DATE CHECKED <br />GENERAL NOTES <br />1. Contractor shall scarify native soil adjacent to pavement at <br />intersection radii to a depth of 6" and blend shoulder backing <br />material prior to compaction. Payment for blending shall be <br />considered as included in the price for Shoulder Backing. <br />2. Existing drainage facilities shall remain in place unless otherwise <br />noted. The Contractor shall conduct earthwork operations so as <br />not to modify or obstruct the existing drainage. <br />3. All shoulder work (except for final shoulder grading) shall be <br />completed prior to placing final lift of asphalt concrete. <br />4. Asphalt Concrete used for Pavement Repair shall not be placed <br />in layers which exceed 0.50' in compacted thickness. <br />5. Placement of asphalt concrete surfacing shall not begin until <br />the asphalt concrete used in pavement repair has been in <br />place for 12 hours. <br />6. Asphalt Concrete shall be placed in two (2) layers of approximate <br />equal thickness with pavement reinforcing fabric placed on the <br />existing surface. <br />7 <br />Survey monument frames and covers shall be adjusted to <br />finished qrade. Exact locations to be determined by the <br />Island — Morada Lane Intersection NW <br />Sta. 289+69 to Sta 304+83 (Lt.) <br />Sta. 307+15 to Sta 349+20 (Lt.) <br />NO SCALE TYPICAL SECTION <br />AND DRIVEWAY DETAILS <br />DATE SUBMITTED DATE APPROVAL <br />Surface U./u n�N iii <br />Concrete <br />PAVEMENT REPAIR DETAIL <br />Note: Width (4' minimum), length <br />and locations to be determined <br />by the Engineer. <br />vise <br />,w <br />N. 99 FRONTAGE ROAD EAST RESURFACING Sheet No. <br />(300' N/0 Foppiano Lane to 600' S/0 Eight Mile Road) 2 of 12 <br />MMENDED DATE <br />/ <br />SHOULDER SCHEDULE <br />Location <br />* Width <br />Sta. <br />236+00 <br />to <br />Sta <br />255+75 <br />(Rt.) <br />6' <br />Sta. <br />255+75 <br />to <br />Sta <br />262+75 <br />(Rt.) <br />2' <br />Sta. <br />262+75 <br />to <br />Sta <br />270+90 <br />(Rt.) <br />6' <br />Sta. <br />270+90 <br />to <br />Sta <br />275+00 <br />(Rt.) <br />2' <br />Sta. <br />276+20 <br />to <br />Sta <br />277+50 <br />(Rt.) <br />4' <br />Sta. <br />279+00 <br />to <br />Sta <br />282+30 <br />(Rt.) <br />2' <br />Sta. <br />284+30 <br />to <br />Sta <br />292+35 <br />(Rt.) <br />2' <br />Sta. <br />295+00 <br />to <br />Sta <br />302+70 <br />(Rt.) <br />2' <br />Sta. <br />309+05 <br />to <br />Sto <br />332+10 <br />(Rt.) <br />2' <br />Sta. <br />332+35 <br />to <br />Sta <br />333+90 <br />(Rt.) <br />6' <br />Sta. <br />337+65 <br />to <br />Sta <br />351+85 <br />(Rt.) <br />2' <br />q <br />Const. <br />Limits of Clearing land Grubbing and <br />and Mailbox Relocation <br />4' 12' 12 4 See Shld. <br />Details <br />Pavement Reinforcing Fabric <br />1 <br />1-0. 17' <br />0.25' Asphalt Concrete <br />Existing Roadway <br />NOF <br />Place New PC <br />(Type 33) pei <br />Standard Plar <br />Remove poi <br />existing cur <br />of exist. ro <br />M COUNTY OF SAN J OAQUIN <br />DRAWN BY I DATE I PROJECT ENGINEER <br />J. M. Levers 1 8/00 <br />DATE CHECKED <br />GENERAL NOTES <br />1. Contractor shall scarify native soil adjacent to pavement at <br />intersection radii to a depth of 6" and blend shoulder backing <br />material prior to compaction. Payment for blending shall be <br />considered as included in the price for Shoulder Backing. <br />2. Existing drainage facilities shall remain in place unless otherwise <br />noted. The Contractor shall conduct earthwork operations so as <br />not to modify or obstruct the existing drainage. <br />3. All shoulder work (except for final shoulder grading) shall be <br />completed prior to placing final lift of asphalt concrete. <br />4. Asphalt Concrete used for Pavement Repair shall not be placed <br />in layers which exceed 0.50' in compacted thickness. <br />5. Placement of asphalt concrete surfacing shall not begin until <br />the asphalt concrete used in pavement repair has been in <br />place for 12 hours. <br />6. Asphalt Concrete shall be placed in two (2) layers of approximate <br />equal thickness with pavement reinforcing fabric placed on the <br />existing surface. <br />7 <br />Survey monument frames and covers shall be adjusted to <br />finished qrade. Exact locations to be determined by the <br />Island — Morada Lane Intersection NW <br />Sta. 289+69 to Sta 304+83 (Lt.) <br />Sta. 307+15 to Sta 349+20 (Lt.) <br />NO SCALE TYPICAL SECTION <br />AND DRIVEWAY DETAILS <br />DATE SUBMITTED DATE APPROVAL <br />Surface U./u n�N iii <br />Concrete <br />PAVEMENT REPAIR DETAIL <br />Note: Width (4' minimum), length <br />and locations to be determined <br />by the Engineer. <br />vise <br />,w <br />N. 99 FRONTAGE ROAD EAST RESURFACING Sheet No. <br />(300' N/0 Foppiano Lane to 600' S/0 Eight Mile Road) 2 of 12 <br />MMENDED DATE <br />/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.