Laserfiche WebLink
0 <br />ar <br />a <br />m <br />07 n <br />00 D <br />O <br />C7 <br />CD -1 <br />3 m <br />co <br />� z <br />r+- D <br />M <br />0 <br />I <br />rn <br />w <br />0 <br />D <br />M <br />71 <br />F11 <br />z <br />0 <br />R & D Existing <br />Place Wood Posts MBGR and Posts, Place Wood Posts <br />Approach Railing and place Thrie Approach Railing <br />Place Terminal System Transition, Typ. Beam Barrier. Transition, Typ. <br />(Type ET), Typ. Refer to Refer to S.P. Refer to Sheet Refer to S.P. <br />Place Terminal System <br />(Type ET), Typ. Refer to <br />0' 10' 20' <br />S C A L E I N F E E T <br />Gabion Rock Slope Protection <br />Refer to Sheet 12 for details. <br />Misc. Earthwork <br />NOTE: <br />Refer to Sheet No. 7 for earthwork details. <br />Corrections By <br />No Changes By ::5— <br />Date <br />:5 Date //,' 71 ° z <br />Any Person Usinc 5, <br />+VIII Intormation By insnpntinri rhe Pito "tiAInr4 <br />COUNTY <br />OF SAN <br />JOAQUIN <br />SCALE: 1 " — <br />20' <br />MINOR STRUCTURE W468 <br />RAILING LAYOUT <br />CLEMENTS ROAD RESURFACING <br />(COMSTOCK ROAD TO HARNEY LANE) <br />Sheet No. <br />11 of 15 <br />DRAWN BY <br />DATE <br />PROJECT ENGINEER <br />DATE <br />CHECKED DATE <br />SUBMITTED <br />DATEAPPROVA <br />RECOMMENDED <br />DATE <br />South <br />Paddy Creek <br />RECORD <br />DRAWL <br />Corrections By <br />No Changes By ::5— <br />Date <br />:5 Date //,' 71 ° z <br />Any Person Usinc 5, <br />+VIII Intormation By insnpntinri rhe Pito "tiAInr4 <br />COUNTY <br />OF SAN <br />JOAQUIN <br />SCALE: 1 " — <br />20' <br />MINOR STRUCTURE W468 <br />RAILING LAYOUT <br />CLEMENTS ROAD RESURFACING <br />(COMSTOCK ROAD TO HARNEY LANE) <br />Sheet No. <br />11 of 15 <br />DRAWN BY <br />DATE <br />PROJECT ENGINEER <br />DATE <br />CHECKED DATE <br />SUBMITTED <br />DATEAPPROVA <br />RECOMMENDED <br />DATE <br />