Laserfiche WebLink
r� <br />No - <br />N <br />t <br />O <br />N <br />V) <br />Earthwork (Misc. Areas) <br />(Type 1): Place Imported <br />Borrow (Typ.) ---, <br />Install Terminal System <br />(Type ET) at all four corners. <br />See Sheet 10 for details <br />0.25' A.C. Overlay <br />Remove Concrete: <br />R & D exist. sacked <br />conc. slope protection. <br />(Both sides) <br />Remove exist. Metal Beam <br />Guard Rail and Install <br />Thrie Beam Barrier. <br />See Sheet 11 for details <br />South Paddy Creek <br />50' <br />A.C. Trans. <br />20' 0 <br />0 <br />N <br />0 <br />E. P. <br />(L' Construction <br />0 <br />N <br />S4 j� <br />n 7 <br />K L O <br />� A <br />utir <br />Harney <br />Lane <br />W <br />� Z <br />PROJECT <br />RECORD DRAWING <br />Corrections By <br />No Changes By.Co�--� <br />Date <br />Any Person Using This Dr: 1argy <br />Adl information By inspecting the bite ()f wnrk <br />COUNTY OF SAN JOA UIN NO SCALE PLAN CLEMENTS ROAD RESURFACING <br />Q Comstock Road to Harney Lane <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPR V COMMENDED DTE <br />Sheet No. <br />7 of 15 <br />/LLJ <br />Z <br />W <br />� Z <br />PROJECT <br />RECORD DRAWING <br />Corrections By <br />No Changes By.Co�--� <br />Date <br />Any Person Using This Dr: 1argy <br />Adl information By inspecting the bite ()f wnrk <br />COUNTY OF SAN JOA UIN NO SCALE PLAN CLEMENTS ROAD RESURFACING <br />Q Comstock Road to Harney Lane <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE SUBMITTED DATE APPR V COMMENDED DTE <br />Sheet No. <br />7 of 15 <br />