Laserfiche WebLink
- <br />C.J <br />m <br />r <br />m <br />Iz <br />0 <br />COLD PLANE PAVEMENT <br />Location Quantity (SQYD) <br />Cambell Avenue <br />Sto 10+00 to Sta 10+75 310 <br />Sta 71 +59 to Sto 72+34 156 <br />Mahon Avenue <br />Sta 9+25 to Sta 9+90 260 <br />total /1b <br />PAVEMENT REPAIR <br />Location Quantity (SQYD) <br />18 Locations Total 41 <br />EARTHWORK <br />(MISCELLANEOUS <br />AREAS) <br />Location <br />Quantity <br />Quantity (STA) <br />Sta 44+85 <br />(Rt) to <br />Sta 47+82 (Rt) <br />2.97 <br />Sto 48+33 <br />(Rt) to <br />Sta 49+05 (Rt) <br />0.72 <br />Sta 56+70 <br />(Rt) to <br />Sta 57+40 (Rt) <br />0.70 <br />I ULUI `t.Jzi <br />PLACE MONUMENT FRAME AND COVER <br />Location Quantity (EA) <br />Sta 44+32 (1 ' Rt) 1 <br />Sta 49+88 (2' Rt) 1 <br />Total 2 <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Danie(Safdana 03/2021 <br />ar <br />DRIVEWAY (TYPE E) <br />Location Quantity (SQYD) <br />8 Locations Total 251 <br />PENETRATION TREATMENT <br />Location Quantity (SQYD) <br />Mahon Avenue Intersection (SW) 67 <br />Mahon Avenue Intersection (NW) 69 <br />Campbell Avenue (Southern Curve) 128 <br />Campbell Avenue (Northern Curve) 94 <br />I otal .SOLS <br />NO SCALE I SUMMARY OF QUANTITIES <br />CHECKED I DATE <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity (TON) <br />Mainline Paving <br />Sta 10+00 to Sta 72+34 2,564 <br />Cross Street Conforms <br />SHOULDER BACKING <br />Mahon Avenue <br />Location <br />Quantity <br />(TON) <br />Sto 10+00 to <br />Sta 72+34 (Lt & Rt) Total <br />990 <br />8 Locations <br />21 <br />Pavement Repair <br />DRIVEWAY (TYPE D) <br />18 Locations <br />Location <br />Quantity <br />(SQYD) <br />27 Locations <br />Total <br />536:1 <br />DRIVEWAY (TYPE E) <br />Location Quantity (SQYD) <br />8 Locations Total 251 <br />PENETRATION TREATMENT <br />Location Quantity (SQYD) <br />Mahon Avenue Intersection (SW) 67 <br />Mahon Avenue Intersection (NW) 69 <br />Campbell Avenue (Southern Curve) 128 <br />Campbell Avenue (Northern Curve) 94 <br />I otal .SOLS <br />NO SCALE I SUMMARY OF QUANTITIES <br />CHECKED I DATE <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity (TON) <br />Mainline Paving <br />Sta 10+00 to Sta 72+34 2,564 <br />Cross Street Conforms <br />Mahon Avenue <br />21 <br />Driveway T aY, e D) <br />26 Locations <br />43 <br />Driveway _(T oy, " <br />8 Locations <br />21 <br />Pavement Repair <br />18 Locations <br />22 <br />Total 2,671 <br />GEOSYNTHETIC PAVEMENT INTERLAYER <br />(PAVING FABRIC) <br />Location Quantity (SQYD) <br />Sta 10+75 to Sta 44+58 6,766 <br />Sta 44+58 to Sta 71 +59 4,802 <br />Total 11,568 <br />RECORD DRAWING <br />owr "O" Py <br />�s <br />Any Peran tl" This <br />AR 1 13y 1 w ely <br />� T>w S" tae MINQe1R <br />CAMPBELL AVENUE RESURFACING Sheet No. <br />(Escalon City Limits to Magnolia Avenue) 1 5 of 5 <br />