Laserfiche WebLink
EARTHWORK (MISCELLANEOUS AREAS) <br />Location Quantity <br />Flag City Boulevard <br />Sta 22+40 to 37+60 (Lt.) & (Rt.) 15.2 Sta. <br />Total 15.2 Sta. <br />SHOULDER BACKING <br />Location Quantity <br />Star Street <br />Various Locations 10 Tons <br />Thornton Road <br />Various Locations 66 Tons <br />De Broggi Road\Flag City Boulevard <br />Various Locations 797 Tons <br />Total 873 Tons <br />DRIVEWAYS (TYPE E) <br />Location Quantity <br />Thornton Road <br />3 Locations 487 S.Y. <br />De Broggi Road\Flag City Boulevard <br />1 Location 30 S.Y. <br />Total 517 S.Y. <br />COUNTY OF SAN JOA0UIN <br />DRAWN BY DATE <br />Z, AgLi lar 12108 <br />PROJECT ENGINEER DATE <br />ASPHALT CONCRETE (TYPE <br />A) <br />FABRIC <br />Location <br />Quantity <br />Star Street <br />Quantity <br />Star Street <br />Mainline Resurfacing <br />1,681 <br />Tons <br />Pavement Repair <br />170 <br />Tons <br />Intersections <br />84 <br />Tons <br />Thornton Road <br />Crosswalks <br />Sta. 9+50 to Sta. <br />Mainline Resurfacing <br />1,452 <br />Tons <br />Pavement Repair <br />626 <br />Tons <br />Driveways <br />70 <br />Tons <br />Intersections <br />15 <br />Tons <br />De Broggi Road\Flag City Boulevard <br />25,073 <br />S.Y. <br />Mainline Resurfacing <br />3,360 <br />Tons <br />Pavement Repair <br />2,644 <br />Tons <br />Driveways <br />3 <br />Tons <br />Intersections <br />19 <br />Tons <br />Total <br />10,124 <br />Tons <br />u � WINO <br />^limns Ry <br />�angsL RV O <br />9 <br />f <br />i e►son Using T ng Shoula Verity <br />., information By Inspecting The Site Of Wo. <br />PAVEMENT <br />REINFORCING <br />FABRIC <br />Location <br />Quantity <br />Quantity <br />Star Street <br />Locations) <br />585 S. F. <br />Numerals <br />Sta. 10+00 to Sta. <br />19+80 <br />5,443 <br />S.Y. <br />Thornton Road <br />Locations) <br />432 S. F. <br />Crosswalks <br />Sta. 9+50 to Sta. <br />20+40 <br />4,722 <br />S.Y. <br />De Broggi Road\Flag <br />City Boulevard <br />175 S. F. <br />Sta. 5+00 to Sta. <br />36+60 <br />14,908 <br />S.Y. <br />Total <br />25,073 <br />S.Y. <br />NO SCALE <br />12�1b�o8t �—� <br />CHECKED <br />SUMMARY OF QUANTITIES <br />DATE APPROVAL RECOMMENDED <br />THERMOPLASTIC PAVEMENT <br />MARKINGS <br />Markings <br />Quantity <br />Arrows <br />(32 <br />Locations) <br />585 S. F. <br />Numerals <br />(4 <br />Locations) <br />71 S. F. <br />Words <br />(18 <br />Locations) <br />432 S. F. <br />Crosswalks <br />(3 <br />Locations) <br />470 S. F. <br />Limit Lines <br />(4 <br />Locations) <br />175 S. F. <br />Total 1,733 S.F. <br />4" THERMOPLASTIC TRAFFIC STRIPE <br />Location Quantity <br />33 Locations Throughout Project Total 25,550 L.F. <br />8" THERMOPLASTIC TRAFFIC STRIPE <br />Location Quantity <br />8 Locations Throughout Project Total 920 L.F. <br />PAVEMENT MARKERS <br />Markers Quantity <br />Type D Two—way Yellow Retroreflective 522 Each <br />Type D Two—way Blue Retroreflective 8 Each <br />Type G One—way Clear Retroreflective 155 Each <br />Total 685 Each <br />FLAG CITY STREETS RESURFACING <br />DATE <br />//-0i <br />Sheet No. <br />12 of 12 <br />