Laserfiche WebLink
STREET LIGHTING NOTES <br />1. FOR STREEr LIGHT LOCATIONS & CIRCUTURY SEE STREEr <br />LIGHT PLANS SHEETS PUSLI-PuSL11. <br />2. STREET LIGHT CONDUIT INSTALLED N JOINT TRENCH. REFER <br />TO J.T. COMPOSITE PIANS FOR LOCATION OF STREET LIGHT <br />TRENCH. <br />JOINT TRENCH TRANSITION <br />TRANSITION TRENCH <br />i PG&E � TELE \ CAN <br />���CCC rrr i <br />1 r 1xL � <br />x <br />1T \i <br />`AVN LINE JOINT TRENCHL) <br />1. CONTRACTOR TO D CAVATE TRANSITIONS FROM MAIN -LINE TRENCH <br />TO VAULTS AS REQUIRED BY EACH UTILITY. <br />2. TRANSITIONS NOT SHOWN ON COMPOSITE DRAWING FOR CLARITY. <br />3. CONTRACTOR TO INCLUDE COST OF TRANSITIONS IN VAULT DfCAVATION COST. <br />X Y X <br />Z <br />JOINT TRENCH <br />PRIMARY BOX S12E DISTANCE WHEN CONDUIT ENTERS BOX 0'A' <br />^X" Y Z. <br />3'x5' 24' 7' 5' <br />4'6"x8'6" 24' 11' 7' <br />PRIMARY BOX S12E DISTANCE WHEN CONDUIT ENTERS BOK 0'B' <br />•X• Y Z. <br />3'x5' 32' 7' 5' <br />4'6"x8'6" 32' 11' 7' <br />TYPICAL PRIMARY BOX EXCAVATION <br />USING A CONDUIT SYSTEM <br />NOT TO SCALE <br />PG&E PRIMARY ENCLOSURE CLEARANCES <br />3'0"x5'0" PRIMARY ENCLOSURE <br />OR <br />4'0'x6'6" PRIMARY ENCLOSURE/TRANSFORMERS <br />OR <br />4'6"x8'6"x6'0" PRIMARY ENCLOSURE/TRANSFORMERS <br />3' MIN. (TYR) <br />(OR EASEMENT REQUIRED) <br />DIM "X" DIM "X" <br />CLEAR CLEAR <br />WORKING SPACE WORKING SPACE <br />3' MIN. (TYP) <br />3' MIN. 3'0"x5'0" ENCLOSURES <br />4' MIN. 4'0"X6'6" ENCLOSURES <br />5' MIN. 4'6"X8'6"X6'0" ENCLOSURES <br />NOT TO SCALE <br />4'x6'6"x5' SUBSURFACE TRANSFORMER <br />CLEARANCES <br />15.5' <br />LABOR & CONSTRUCTION <br />TRENCH <br />RESPONSIBILITY <br />JOINT TRENCH CONTRACTORS NOTES <br />TRANSFORMER 3' <br />8.5' <br />U <br />THE CONTRACTOR 5 RESPONSIBLE TO HAVE ALL INSTALLATIONS INSPECTED AND APPROVED <br />MIN. <br />U yy w O <br />J Z H <br />1. <br />F/C <br />Q <br />W(70 Q <br />BY THE RESPWM UTILITY COMPANY, MUNICIPAIM, OR SOILS ENGINEER PRIOR TO ANY <br />WWW <br />1S diW�z <br />a <br />INSTALLATION WORK <br />d d H U UU <br />1. <br />TRENCHING: <br />*UNLESS OTHERWISE SHOWN OR <br />EXCAVATE, BACKFILL <br />00009 <br />**NOTE: <br />AND COMPACT <br />THE CONTRACTOR SHALL PERFORM ALL 7RENCFILNG, EMANATING, BACIKFlWNG, INSTALLATION <br />2. <br />GAS MATERIAL: <br />2. <br />3. <br />1NSSTA✓=L� <br />ELECTRIC CABLE: <br />' ' r <br />SUPPLY <br />0000 <br />SHALL BE FAMILIAR WITH OSHA INDUSTRIAL ORDERS AND SHALL CONDUCT HIS WORK <br />INSTALL <br />00009 <br />4. <br />ELECTRIC CONDUIT: <br />W <br />m <br />ACCORDINGLY. WHEN WORKING AROUND ENERGIZED EQUIPMENT. THE UTILITY OWNER SHALL BE <br />SUPPLY <br />00009 <br />gg <br />O <br />INSTALL <br />00000 <br />5. <br />ELECTRIC SPLICE BOXES: <br />SCHEMATICALLY. THE CONTRACTOR SHILL INSTALL ALL UTILITY VAULTS, PADS, CONDUITS, <br />3. <br />EXCAVATE <br />oocco <br />THE CONTRACTOR 5 RESPONSIBLE FOR PUBLIC SAFETY AND TRAFFIC CONTROL MEASURES <br />SUPPLY <br />OCOOo <br />INSTALL <br />OOOOe <br />6. <br />ELECTRIC TFMR. ENCLS: <br />DIMENSIONS WITH SUPPLIERS PRIOR TO EXCAVATING. <br />Z <br />SUPPLY <br />INSTAtL <br />o0o <br />7C�� <br />7. <br />ELECTRIC EQUIP. ENCLS.:EXCAVA <br />gmL) <br />oocce <br />AGREEABLE TO ADJACENT LAD USES AND TENANTS AT ALL TIMES <br />SUPPLYTE <br />00009 <br />4. <br />INSTALL <br />00000 <br />8. <br />ELECTRIC TRANS. PADS: <br />STANDARD PRACTICES AND SPECIFICATIONS OF EACH PARTICIPATING UUUTY COMPANY AND <br />OR <br />a <br />GRADE <br />o0coo <br />THE CONTRACTOR 70 BE AWAKE THAT THE LOCATION OF DOSING UNDERGROUND UTILITIES <br />SUPPLY <br />oocce <br />INSTALL <br />00000 <br />9. <br />ELECTRIC <br />PADS:GRA <br />SPECIFICATIONS OF THE CITY OR COUNTY INVOLVED. <br />z <br />SWITCH <br />0000 <br />BY PGK TELE HOIC DAN, IMPROVEMENT PLANS AND CITY RECORDS. GWAONE DESION <br />SUPLY <br />00000 <br />INSTALL <br />00009 <br />10. <br />TELEPHONE CONDUIT:SUPPLY <br />THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO COMMENCING WORK. <br />DISCREPANCY IS FOUND. <br />0000 <br />CONTRACTOR 6 RESPONSIBLE 70 VERIFY THE PRECISE LOCATION OF ALL UNDOi KIL D <br />INSTALL <br />00000 <br />11. <br />TELEPHONE CABLE: <br />FACILITIES. CONTRACTOR MALL NOTIFY UNDERGROUND SERVICE ALERT (USI) (811) AT <br />SUPPLY <br />00000 <br />& <br />INSTALL <br />00000 <br />12. <br />TELEPHONE SPLICE BOXES: <br />SURFACE MATERIAL A SAND BEDDING OF AT LEAST 2" (TWO INCHES) SHALL BE PROVIDED <br />EXCAVATE <br />00000 <br />THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF CONSTRUCTION WITH TIE <br />ON WHICH TIE UTILTRES WILL BE PLACED. (MAY NOT BE REWIRED IN NATIVE SAND MEAS, <br />6, <br />INSTALL <br />0oc00 <br />13. <br />TELEPHONE SAI PADS: <br />CONSULT WITH LOCAL AGENCIES). <br />CONDITIONS. THE CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW THE PROJECT AND SITE <br />INSTALLATIONS. <br />SUPLY <br />Q00000 <br />INSTALL <br />88x8 <br />14. <br />CATV CONDUITS: <br />THE ACTUAL LOCATION OF EXISTING FACILITES FROM THAT SHOWN IN THESE PIANS, OR <br />SUPPLY <br />00c00 <br />THE CONTRACTOR SHALL NOTIFY DEVELOPER 48 HOURS PRIOR TO THE NEED FOR SURVEY <br />INSTALL <br />OC c*0 <br />15. <br />CATV SPLICE BOXES:EXCAVA <br />STAKING. THE CONTRACTOR 5 RESPONSIBLE FOR THE PRESEINATKN OF AL CONSTRUCTION <br />TE <br />_ <br />SUPPLY <br />00c00 <br />STAKING SET BY THE DEVELOPERS SURVEYORS AND WILL BE BACK CHARGED FOR ANY <br />INSTALL <br />OC c*0 <br />16. <br />STREET LIGHTING:EXCAVA <br />RE-STRONG THAT 5 REWIRED. <br />TE <br />_ <br />SUPPLY <br />0oc00 <br />INSTALL <br />00000 <br />THE 0 ABOVE DESIGNATES THE WORK TO BE PERFORMED <br />SHOULD A CONFLICT MISE BETWEEN FACILOES SHOWN ON TIRES_ PIANS AND <br />BY THE CONTRACTOR AND EACH UTILITY <br />COMPANY. <br />BETWEEN THESE PIANS AND ACTUAL FIELD CONDITIONS. THE CONTRACTOR SHOULD VISIT <br />STREET LIGHTING NOTES <br />1. FOR STREEr LIGHT LOCATIONS & CIRCUTURY SEE STREEr <br />LIGHT PLANS SHEETS PUSLI-PuSL11. <br />2. STREET LIGHT CONDUIT INSTALLED N JOINT TRENCH. REFER <br />TO J.T. COMPOSITE PIANS FOR LOCATION OF STREET LIGHT <br />TRENCH. <br />JOINT TRENCH TRANSITION <br />TRANSITION TRENCH <br />i PG&E � TELE \ CAN <br />���CCC rrr i <br />1 r 1xL � <br />x <br />1T \i <br />`AVN LINE JOINT TRENCHL) <br />1. CONTRACTOR TO D CAVATE TRANSITIONS FROM MAIN -LINE TRENCH <br />TO VAULTS AS REQUIRED BY EACH UTILITY. <br />2. TRANSITIONS NOT SHOWN ON COMPOSITE DRAWING FOR CLARITY. <br />3. CONTRACTOR TO INCLUDE COST OF TRANSITIONS IN VAULT DfCAVATION COST. <br />X Y X <br />Z <br />JOINT TRENCH <br />PRIMARY BOX S12E DISTANCE WHEN CONDUIT ENTERS BOX 0'A' <br />^X" Y Z. <br />3'x5' 24' 7' 5' <br />4'6"x8'6" 24' 11' 7' <br />PRIMARY BOX S12E DISTANCE WHEN CONDUIT ENTERS BOK 0'B' <br />•X• Y Z. <br />3'x5' 32' 7' 5' <br />4'6"x8'6" 32' 11' 7' <br />TYPICAL PRIMARY BOX EXCAVATION <br />USING A CONDUIT SYSTEM <br />NOT TO SCALE <br />PG&E PRIMARY ENCLOSURE CLEARANCES <br />3'0"x5'0" PRIMARY ENCLOSURE <br />OR <br />4'0'x6'6" PRIMARY ENCLOSURE/TRANSFORMERS <br />OR <br />4'6"x8'6"x6'0" PRIMARY ENCLOSURE/TRANSFORMERS <br />3' MIN. (TYR) <br />(OR EASEMENT REQUIRED) <br />DIM "X" DIM "X" <br />CLEAR CLEAR <br />WORKING SPACE WORKING SPACE <br />3' MIN. (TYP) <br />3' MIN. 3'0"x5'0" ENCLOSURES <br />4' MIN. 4'0"X6'6" ENCLOSURES <br />5' MIN. 4'6"X8'6"X6'0" ENCLOSURES <br />NOT TO SCALE <br />4'x6'6"x5' SUBSURFACE TRANSFORMER <br />CLEARANCES <br />15.5' <br />SUBSURFACE <br />TRENCH <br />O <br />JOINT TRENCH CONTRACTORS NOTES <br />TRANSFORMER 3' <br />8.5' <br />4' 4' <br />-s^ <br />THE CONTRACTOR 5 RESPONSIBLE TO HAVE ALL INSTALLATIONS INSPECTED AND APPROVED <br />MIN. <br />SIDEWALK <br />1. <br />F/C <br />NOT TO SCALE <br />PAD SIZE: <br />48'x48" FIXED BOLLARDS AS REQUIRED <br />SWITCH CABINET DIMENSIONS: (SEE PG&E ELECTRIC SERVICE <br />DOCUMENT #051122) <br />40"w x41"d x55"h <br />PG&E PAD MOUNT INTERRUPTER DETAIL <br />(1-4) <br />N.T.S. <br />42EXISTING IMPROVEMENTS <br />SAW CUT <br />42 <br />13' <br />s� <br />SWK °' 4.5' <br />25' <br />i <br />209 <br />III <br />VERTICAL CURB- <br />& GUTTER <br />MAIN STREET <br />NTS <br />2 <br />S. L. <br />6" MIN. COMPACTED ROCKBASE <br />FOR PRIMARY BOXES AND <br />TRANSFORMERS (TYR) <br />JOINT <br />0 <br />Q <br />TRENCH <br />O <br />JOINT TRENCH CONTRACTORS NOTES <br />IL <br />GENERAL NOTES <br />1. <br />THE CONTRACTOR 5 RESPONSIBLE TO HAVE ALL INSTALLATIONS INSPECTED AND APPROVED <br />17. <br />EDGE OF SPLICE BOXES & PEDESTALS SHALL BE 5' FROM EDGE OF F.H. AND 3' FROM <br />1. <br />PC&E'S UO STANDARD 55453 TO BE ATTIRED FOR ALL TRENCHING, BACK-F1LUNG, AND <br />BY THE RESPWM UTILITY COMPANY, MUNICIPAIM, OR SOILS ENGINEER PRIOR TO ANY <br />STREET LIGHT C".) CONTRACTOR TO AVOID DISTURBING F.H. THRUST BLACK. <br />a <br />INSTALLATION WORK <br />BACK FILLING. (48 HOUR NOTICE) <br />*UNLESS OTHERWISE SHOWN OR <br />NOTED <br />Z <br />**NOTE: <br />18. <br />THE CONTRACTOR SHALL PERFORM ALL 7RENCFILNG, EMANATING, BACIKFlWNG, INSTALLATION <br />2 <br />SHOULD A DISPUTE OR DISAGREEMENT OVER MY INSTALLATION, DESIGN, PIAN, GR DRAWING <br />2. <br />CONTRACTOR WILL COMPLY WITH ALL LAWS, ORDINANCES AND REGULATIONS. CONTRACTOR <br />AND ALL OTHER WORK AS SHOWN OR NOTED ON THESE PLIAS & SPECIFICATIONS. <br />OCCUR THE SPECIFICATIONS AND REQUIREMENTS OF THE INDIVIDUAL UTILITY COMPANY AND <br />O <br />SHALL BE FAMILIAR WITH OSHA INDUSTRIAL ORDERS AND SHALL CONDUCT HIS WORK <br />THEIR INSPECTOR SHALL TAKE PRECEDENCE <br />W <br />m <br />ACCORDINGLY. WHEN WORKING AROUND ENERGIZED EQUIPMENT. THE UTILITY OWNER SHALL BE <br />19. <br />ALL TRENCHES BOXES AND CONDUIT LAYOUTS N THIS PLAN SET ARE SHOWN <br />gg <br />O <br />NOTIFIED TO SUPPLY THE APPROPRIATE MAN POWER AND SAFETY PRE ALITIONS AS NEEDED <br />SCHEMATICALLY. THE CONTRACTOR SHILL INSTALL ALL UTILITY VAULTS, PADS, CONDUITS, <br />3. <br />GNCALD E DESIGN SERVICES, INC. ASSUMES NO RESPONSIBILITY FOR THE QUALITY, <br />0- <br />THE CONTRACTOR 5 RESPONSIBLE FOR PUBLIC SAFETY AND TRAFFIC CONTROL MEASURES <br />EIC. IN PROPER RELATION TO FINAL GRADE VERIFY ALL SUBSIRUCTURE D7CCAVATION <br />QUANTITY OR TIMING OF WORK BY CONTRACTOR, UTILITY COMPANY CONSTRUCTION CREWS <br />H <br />J <br />DIMENSIONS WITH SUPPLIERS PRIOR TO EXCAVATING. <br />Z <br />OR OTHER SUBCONTRACTORS TO THE DEVELOPER. <br />3. <br />THE CONTRACTOR 5 RESPONSIBLE FOR MAINTAINING POINTS OF ACCESS THAT ARE <br />gmL) <br />AGREEABLE TO ADJACENT LAD USES AND TENANTS AT ALL TIMES <br />20. <br />ALL JOINT TRENCH CONSTRUCTION WORK SHALL BE IN ACCORDANCE WITH THE CURRENT <br />4. <br />THE DRAWINGS AND SPECIFICATIONS SIAL BE CONSIDERED TO BE COMPLEMENTARY TO <br />z <br />STANDARD PRACTICES AND SPECIFICATIONS OF EACH PARTICIPATING UUUTY COMPANY AND <br />OR <br />a <br />ONE ANOTHER. ANYTHING MENTIONED IN THE SPECIFICATIONS AND NOT SHOWN ON THE <br />4. <br />THE CONTRACTOR 70 BE AWAKE THAT THE LOCATION OF DOSING UNDERGROUND UTILITIES <br />CONFORM TO TIE CURRENTLY ADOPTED EDITIONS OF THE STANDARD PLANS AND <br />DRAWINGS OR SHOWN ON THE DRAWINGS AND NOT MENTIONED IN TIE SPMFIGITIONS <br />94OWN ON THESE PLANS ARE APPROXIMATE BASED UPON MM DATA MAOE AVAILABLE <br />SPECIFICATIONS OF THE CITY OR COUNTY INVOLVED. <br />z <br />SHALL BE CONSIDERED OF LIKE EFFECT AS IF APPEARING IN BOTH, CONTACT GIACALONE <br />BY PGK TELE HOIC DAN, IMPROVEMENT PLANS AND CITY RECORDS. GWAONE DESION <br />DESIGN SERVICES INC. PRIOR TO STMT OF WORK OR SUBMITTAL OF BID IF A <br />SERVICES, INC ASSUMES NO RESPONSIBILITY FOR THE INFORMATION SHOWN. THE <br />21. <br />THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO COMMENCING WORK. <br />DISCREPANCY IS FOUND. <br />CONTRACTOR 6 RESPONSIBLE 70 VERIFY THE PRECISE LOCATION OF ALL UNDOi KIL D <br />FACILITIES. CONTRACTOR MALL NOTIFY UNDERGROUND SERVICE ALERT (USI) (811) AT <br />22. <br />THE BOTTOM OF ALL TRENCHES BALL BE CLEARED OF ROCKS AND ALL OTHER HARD <br />& <br />CONSULT PARTICIPATING UTILITIES, SOILS ENGINEER, AND THE CITY FOR APPROVED BACK <br />LEST 48 HOURS (2 WORKING DAYS) PRIOR TO STMT OF WORK <br />SURFACE MATERIAL A SAND BEDDING OF AT LEAST 2" (TWO INCHES) SHALL BE PROVIDED <br />FILL MATERIAL COMPACTION TO MEET LOCAL AGENCIES REQUIREMENTS. <br />5. <br />THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF CONSTRUCTION WITH TIE <br />ON WHICH TIE UTILTRES WILL BE PLACED. (MAY NOT BE REWIRED IN NATIVE SAND MEAS, <br />6, <br />MALOTE DESIGN SERVICES, INC. ASSUMES NO RESPONSIBILITY FOR THE PROJECT <br />ECTIVE <br />RESPUTILITY AGENCIES ALLOWNG 48 HOURS PRIOR TO THE NEED FOR <br />CONSULT WITH LOCAL AGENCIES). <br />CONDITIONS. THE CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW THE PROJECT AND SITE <br />INSTALLATIONS. <br />23. <br />THE CONTRACTOR SHALL NOTIFY GMCALONE DESIGN SERVICES, INC. OF ANY DFFE W CES IN <br />PRIOR TO SUBMITTING HIS BID. <br />THE ACTUAL LOCATION OF EXISTING FACILITES FROM THAT SHOWN IN THESE PIANS, OR <br />6. <br />THE CONTRACTOR SHALL NOTIFY DEVELOPER 48 HOURS PRIOR TO THE NEED FOR SURVEY <br />P� OTHER CONFLICTS WITH THE DESIGN, PRIOR TO CONTINUING WORK IN THAT AREA THE <br />7. <br />AL <br />ALL LENGTHS SHOWN W THESE PIANS ME ESTIMATES. FINAL WATITRES SFRN.L BE BASED <br />BE E, <br />STAKING. THE CONTRACTOR 5 RESPONSIBLE FOR THE PRESEINATKN OF AL CONSTRUCTION <br />CONTRACTOR SHALL BE HELD RESPONSIBLE FOR MY FIELD CHANGES MADE WITHOUT FIRST <br />WHAT PROJECT. <br />WENT WILL BE NEEDED TO COMPLETE THIS PROTECT. DUE TO CHANGES, ADDITIONS. <br />COMPLEQUANTITTE <br />STAKING SET BY THE DEVELOPERS SURVEYORS AND WILL BE BACK CHARGED FOR ANY <br />NOTIFYING GIACALONE DESIGN SERVICES INC. <br />ON <br />GR OMISSIONS FINAL MAY <br />RE-STRONG THAT 5 REWIRED. <br />24. <br />GACALONE DESIGN SERVICES, INC. ASSUMES NO RESPONSIBILITY FOR ANY DIFFERENCES <br />S <br />SHOULD A CONFLICT MISE BETWEEN FACILOES SHOWN ON TIRES_ PIANS AND <br />7. <br />CONTRACTOR RESPONSIBLE 70 PROTECT IN ALAE ALL EXISTING FACILITIES. <br />BETWEEN THESE PIANS AND ACTUAL FIELD CONDITIONS. THE CONTRACTOR SHOULD VISIT <br />IMPROVEMENT PUNS FOR THIS PROJECT, THE IMPROVEMENT PLANS SHALL TAKE <br />ETHEXCAVATION E UNDERGROUND <br />EXCAVATION MAY BE REWIRED OVER, UNDER GR ADJACENT TO EXISTING <br />THE PROJECT SITE PRIOR TO SUBMITTING BID. <br />PRECEDENCE CONTACT GIACALONE DESIGN SERVICES, INC. (925) 467-1740 IF A PROBLEM <br />PROTECT <br />UTILITIES. THE CONTRACTOR B RESPONSIBLE 70 LOCATE, EIPOSE AND PROTECT Nl <br />SHOULD OCCUR. <br />EASING FACILITIES. THE CONTRACTOR IS RESPONSIBLE TO BID THE WORK BASED ON THE <br />25• <br />THE CONTRACTOR SHALL COORDINATE AL CONNECTIONS BETWEEN EXISTING MD PROPOSED <br />REVIEW OF THE IMPROVEMENT PLANS IN CONJUNCTION WITH THESE PAWS <br />FACILITIES WITH THE RESPECTIVE UTILITY INSPWUDR. ALL DUSTING CONDUIT TO BE USED <br />9. <br />ALL TRANSFORMERS AND TRANSFDNER PADS ARE TO BE INSTALLED PER PG&E <br />SHALL BE MANDREL TESTED AND PROVED PRIOR TO WAKING CONNECTION AS OIRWU BY <br />SPECIFICATIONS. PROTECTIVE BOLLMDS ARE TO BE PLACED WHERE NEEDED AS DIRECTED <br />8. <br />ITS THE CONTRACfOR/ODELOPER RESPONSIBILITY 10 MAKE SURE THAT 71E IIDSf <br />THE GOVERNING INSPECTOR. UTILITY COMPANIES SCOL LAKE AL Wr TIE-INS AND <br />�� <br />CUMW SET OF PANS ARE BEING USED. CALL GIAACALONE DESIGN SERVICES, INC. <br />CONNECTIONS. THE CONTRACTOR SHALL NOT EAM <br />MIER OR WORK ON Y EWE=(828) <br />487-1740 TO VERIFY. <br />FACILITES. UNLESS CHIMED BY THE LAW NSPECIDR. THIS COST SEAL BE INCLUDED <br />10. <br />THE TRENCH WIDTHS ND DEPTHS SHOWN ARE BASED ON THE ANNUM UTILITY <br />IN CONTRACTOR BD. <br />COMPANY REQUIREMENTS <br />REQUIREMENTS FOR WIDTH, DEPTH THE CONTRACTOR SFRN.L <br />9. <br />THE CONTRACTOR SAL COORDINATE ALL TIE-INS WITH UTILITY COMPANIES AS REWIRED. <br />EXCAVATE HE E THE PROP <br />EXCAVATE FOR ADDITIONAL WIDTH OR DE7PIFI WHERE THE PROPOSED JOINT TRENCH <br />28• <br />THE CONTRACTOR IS REQUIRED TO EXCAVATE 'BELL HOES' AT THE TIE-IN LOCATIONS AS <br />FACILITIES APPROACH AND CROSS OTHER DUSTING UIIJIY LINES (MM DRNN. SEWER, <br />10. <br />THE CONTRACTOR SAL PROVIDE TE -IN HOLE TO 12' BELOW DUSTING GIS MAIN FOR <br />REQUIRED BY THE UTILITY COMPANIES. <br />TO CLEAR <br />PG&E GIS RE-IN(S) UNLESS OTHERWISE NOTED ON PLANS <br />BE PLACEDEITHEREITHHEABOVETMTHEE Df6STILINGGUUTIIM NES WITH AT LEAST6'6'' tLITIES � <br />R BELOW OR <br />11. <br />JOINT TRENCH FACILITIES SHALL MAINTAIN A MINIMUM OF 3' HORIZONTAL CLEARANCE FROM <br />27• <br />TRENCHING MD/0R SUBSTRUCTURE EXCAVATIONS MAY TAKE PLACE OVER, UNDER, OR <br />CLEARANCE BETWEEN THE EXISTING UTILITY LINES BEING CROSSED, OR SUCH GREATER <br />EDGE OF JOINT TRENCH TO EDGE OF W UTILITIES WITH A MINIMUM 6" VERTICAL <br />ADJACENT TO OTHER UNDERGROUND FACILITIES (STORM, SEWER, WATER, EFC.). THE <br />MINIMUM DISTANCE AS MAY BE REWIRED BY THE LOCAL GOVERNMENTAL AGENCY OR OTHER <br />CLEARANCE WHEN CROSSING (U.O.N), THE CONTRACTOR SHALL REFER 70 PG&E UO <br />CONTRACTOR 5 RESPONSIBLE TO LOCATE' EXPOSE AND PROTECT IN PLACE ALL EXISTING <br />PUBLIC REGULA70RY AGENCY. (SEE MINIMUM COVER AND CLEARANCE TABLE) <br />STANDARD 55453 FOR ADDITIONAL INFORMATION. <br />FACILITIES. <br />FACILITIES. THIS WORK SHALL NOT BE CONSIDERED AS EXTRA WORK. IT IS THE <br />RESPONSIBILITY TO REVIEW ALL IMPROVEMENT AND GRADING PAWS, IN <br />11. <br />TRENCH SECTIONS SHOWN ARE MD INDICATE MEAS OF OCCUPANCY ONLY, <br />12. <br />TRANSITION TRENCH FOR VAULTS/PEDESTALS NOT SHOWN FOR CLARITY. THE CONTRACTOR <br />CONJUNCTION WITH THESE PIANS, AND BD HIS WORK ACCORDINGLY. <br />THEY DO NOT REFLECT THE SIZE AL QUANTITY F THE FS AS SS BONG INSTALLED AND <br />E OR QUA <br />NE DESIGNED TO ACCOMMODATE AL REWIRED FACILITIES M SHOWN ON EACH TRENCH <br />SIAL PROVIDE INCIDENTAL TRENCHNG AS REQUIRED FOR CONDUIT/CABLE ROUTING INTO <br />28. <br />THE RESPECTIVE UTILITY INS PMFGR WILL DETERMINE IN THE FIELD IF REFINING WAIS <br />PARTICIPANTS' CONSTRUCTION DRAWINGS. REFER TO THE COMPOSE, CONDUIT, STREEILIGNT <br />VAULTS/PEDESTALS. CONTRACTOR SIAL INCLUDE COST OF TRANSITION TRENCH N <br />WILL BE NEEDED 70 MEET THE MINIMUM CLEARANCE REQUIREMENTS. REFER 70 THE PG&E <br />PIM AND/GR EACH RESPECTIVE UTILITY COMPANIES CONSIRWUKIN DRAWINGS FOR THE <br />VAULT/PEDESTAL EXCAVATION COST. <br />'GREEN BOOK" STANDARD DRAWING 051122 FOR APPROVED RETAINING WALL REQIUIREMBTS <br />NECESSARY CONDUIT, CABLE AND/OR PPE BEING INSFAUID. <br />13. <br />THE CONTRACTOR SINAL OFFSET VAUL75/PEDESTALS AS REWIRED FOR CONDUIT/CABLE <br />RETAINING WAILS ARE THE DEVELOPERS RESPONSIBILITY AND ME am INCLUDED IN THIS <br />12 <br />RESPECTIVE UTILITY TO OBTAIN CITY OR COUNTY APPROVAL OF ALL ABOVE GROUND <br />ROUTING. <br />CONTRACT <br />EWIPNENf. <br />29. <br />THE CONTRACTOR SHALL 'RED -LINE" (1) ONE SEF OF THE JOINT TRENCH COMPOSITE <br />14. <br />THE CONTRACTOR SAL FIELD ADJUST VMNDICAPDRAMPS AS REQUIRED 70 AVOID <br />PLANS AND (2) TWO SETS OF THE CAS AND ELECTRIC PIANS WITH AS -BUILT' <br />13. <br />AL BOXES TO BE INSTATED WTIHN THE R/W MD/OR PUE AREA. <br />SEWER A WITH dRIVEWAYS, SIDEWAYS, HANDICAP RAIDS, FIRE FOORANIS, WATER & <br />SEWER U7D7ALS, ETC. <br />INFORMATION MD GIVE TO THE DEVELOPER PRIOR TO SPLICING OF THE PRIMARY ELECTRIC <br />SYSTEM <br />14. <br />ANY QUESTIONS OR UNCERTAINTIES REGARDING REMOVAL MD/OR REPLACEMENT OF <br />EXISTING NARDI OR LANDSCAPE SHALL BE COORDINATED WITH THE DEVELOPER <br />15. <br />SERVICE LOCATIONS SHOWN ME APPROXIMATE, THE CONTRACTOR SHALL FIELD VERIFY THEIR <br />30. <br />CONTRACTOR TO VERIFY RIGHT OF WAY, PUBLIC UTILITY EASEMENT MD/OR PUBLIC SERVICE <br />AND/OR OTHER PARTIES/AGENCIES INVOLVED. <br />EXACT LOCATIONS PRIOR TO COMMENCING WORK. THE CONTRACTOR SHALL FIELD ADJUST <br />EASEMENT ACQUISITION WITH THE APPLICANT PRIOR TO CONSTRUCTION WITHIN AREAS OF <br />SERVICE STUB AND CROSSING LOCATIONS AS REQUIRED TO AVOID CONFLICTS WITH OTHER <br />QUESTION. <br />15. <br />A 3 FOOT CLEAR & LEVEL WORKING AREA MUST BE MAINTAINED MOUND ALL ELECIRK: <br />FACILTRE3. <br />ENCIDSURES, EXCEPT 4'-6"x8'-8" VAULTS WHICH SHALL MAINTAIN A 5 FOOT MINIMUM <br />31. <br />SUBSTRUCTURES MUST HAVE 12' MINIMUM CLEARANCE FROM JOINT TRENCH. <br />CLEAR & LEVEL WORKING AREA ON THE SHORT SIDES AND 3 FOOT ON THE LONG WALL <br />16. <br />SMVICE COMPLETION TRENCHES SHALL BE INSTALLED AFTER CURB AND GLITTER, UNLESS <br />SIDES., PAD MOUNT EQUIPMENT SIAL MNNFAN AN 8 FOOT CLEAR & LEVEL WORKING AREA <br />DIRECTED OTHERWISE. THE CONTRACTOR SIAL COORDINATE ADDITIONAL MDVE-INS AS <br />N FRONT OF EQUIPMENT DOORS AND 3 FOOT CLEW ON SIDES & BACK, UNLESS DIRECTED <br />NECESSARY TO COMPLETE THE SERVICES TO EACH INDIVIDUAL UNIT WITH THE DEVELOPER, <br />OTHE MSE BY INSPECTOR. REFER TO THE PG&E 'GREEN BOOK" STANDARD DRAWING <br />UTILITY COMPANIES & AL INVOLVED AGENCIES. THE COST OF THESE MOVE -INS SHALL BE <br />051122 FOR ADDITIONAL CLEARANCE PROTECTION REQUIREMENTS. <br />INCLUDED IN THE CONTRACTORS UNIT BID PRICE FOR TRENCHING. <br />PAD SIZE: <br />48'x48" FIXED BOLLARDS AS REQUIRED <br />SWITCH CABINET DIMENSIONS: (SEE PG&E ELECTRIC SERVICE <br />DOCUMENT #051122) <br />40"w x41"d x55"h <br />PG&E PAD MOUNT INTERRUPTER DETAIL <br />(1-4) <br />N.T.S. <br />42EXISTING IMPROVEMENTS <br />SAW CUT <br />42 <br />13' <br />s� <br />SWK °' 4.5' <br />25' <br />i <br />209 <br />III <br />VERTICAL CURB- <br />& GUTTER <br />MAIN STREET <br />NTS <br />2 <br />S. L. <br />6" MIN. COMPACTED ROCKBASE <br />FOR PRIMARY BOXES AND <br />TRANSFORMERS (TYR) <br />JOINT <br />0 <br />Q <br />TRENCH <br />O <br />IL <br />� <br />AND <br />O <br />UTILITY <br />I.L. <br />ad <br />J <br />BOX <br />a <br />LOCATION <br />U <br />*UNLESS OTHERWISE SHOWN OR <br />NOTED <br />Z <br />**NOTE: <br />SEE J.T. COMPOSITE PLANS <br />FOR CONFIGURATIONS AND <br />ARRANGEMENTS. <br />DESIGN CHANGE COMPONENT <br />ANY CHANGES TO THIS DESIGN MUST <br />BE APPROVED BY <br />DAVID ORONOS 510-871-0228 <br />PG&E Gas ADE <br />DEVELOPER <br />PLEASE NOTE AND SIGN <br />ALL PG&E ENCLOSURES AND BOXES HAVE BEEN SET TO GRADE <br />ACCORDING TO GRADE STAKES PROVIDED BY DEVELOPERS <br />ENGINEER. ALL COSTS TO RELOCATE OR RE -ADJUST BOXES AT <br />A LATER DATE WILL BE BILLED TO THE DEVELOPER. PLEASE <br />HAVE YOUR SUPERINTENDENT VERIFY THE CORRECT GRADE OF <br />ALL ENCLOSURES AND BOXES AND SIGN AND DATE DRAWING. <br />THANK YOU <br />slarED: <br />DATE - <br />[ <br />ATE <br />[ CALL BEFORE YOU DIG <br />W z <br />Z <br />OLL <br />W <br />U_ <br />i <br />TIC <br />-a{i <br />93 W 911 <br />®L w$ <br />Fr 1 <br />N <br />J <br />Q <br />H <br />W <br />0 <br />Cid <br />N <br />W <br />O <br />Z <br />J <br />Q <br />W <br />W <br />CD <br />z <br />L. <br />w <br />:. <br />00 <br />0 <br />Q <br />Z <br />O <br />IL <br />� <br />O <br />I.L. <br />ad <br />J <br />a <br />V! <br />U <br />Z <br />O <br />.� <br />Q <br />O <br />Zo <br />O <br />all- <br />W <br />m <br />gg <br />O <br />d' <br />_ ~ <br />0- <br />I <br />H <br />J <br />Z <br />LLI <br />:3 <br />gmL) <br />�3Z <br />> <br />W z <br />Z <br />OLL <br />W <br />U_ <br />i <br />TIC <br />-a{i <br />93 W 911 <br />®L w$ <br />Fr 1 <br />N <br />J <br />Q <br />H <br />W <br />0 <br />Cid <br />N <br />W <br />O <br />Z <br />J <br />Q <br />W <br />W <br />CD <br />z <br />L. <br />w <br />:. <br />00 <br />Q <br />Z <br />O <br />� <br />� <br />O <br />I.L. <br />ad <br />J <br />a <br />I4% <br />U <br />Z <br />O <br />.� <br />Q <br />Zo <br />O <br />all- <br />W <br />m <br />_ ~ <br />0- <br />I <br />H <br />J <br />Z <br />LLI <br />:3 <br />gmL) <br />�3Z <br />> <br />z <br />OR <br />a <br />a <br />O <br />z <br />J <br />N <br />PROJECT MANAGER" <br />LARRY CASKEY <br />DRAMA BY: <br />MB2 <br />CHECKED BY: <br />LARRY CASKEY <br />SCALE: <br />N.T.S. <br />JOB NUMBER: <br />21-070 <br />DATE LAST MODIFIED: <br />12-05-23 <br />SHEET <br />JT2 <br />OF 8 SHEETS <br />