My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2303501 thru PS-2304000_ - PS-2303816
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2023
>
PS-2303501 thru PS-2304000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2303501 thru PS-2304000_ - PS-2303816
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2024 11:45:26 AM
Creation date
1/5/2024 11:29:20 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2303816
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 <br />Special Conditions for <br />Encroachment Permit <br />22. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum -assisted street sweeper. <br />23. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.