Laserfiche WebLink
Special Conditions for -3- <br />ENCROACHMENT PERMIT <br />23. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum -assisted street sweeper. <br />24. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />25. ABANDON IN PLACE: Within forty-five (45) days after the service of a 45 -day notice from San <br />Joaquin County Public Works to relocate, change grade, construct, use, maintain, change or <br />modify any street improvement of any County -owned utility facilities, Pacific Gas & Electric shall <br />at its cost and expense, begin the necessary work to remove abandoned facilities in conflict. <br />