My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2024_PS-2400000 thru PS-2400500_ - PS-2400403
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2024
>
PS-2400000 thru PS-2400500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2024_PS-2400000 thru PS-2400500_ - PS-2400403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 10:25:04 AM
Creation date
2/14/2024 10:22:08 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2400403
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2024
Notes2
S/S of Harney Ln. 40' E/O Lower Sacramento Rd.
Type - Permit Process
Sign Install
Address
221 W. Pine St., Lodi,CA 95240
Application
City of Lodi
Supplemental fields
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
California MUTCD 2014 Edition <br />(FHWA's MUTCD 2009 Edition, including Revisions 1 & 2, as amended for use in California) <br />Table 6H-4(CA). Taper Length Criteria for Temporary Traffic Control Zones <br />(for 12 feet Offset Width) <br />Harney <br />Lane <br />Lower <br />Sacramento <br />Road (within <br />City of Lodi <br />limits) <br />Lower <br />Sacramento <br />Road (SJC <br />limits) <br />Minimum Taper Length** <br />Speed* for Width of Offset 12 feet (111 <br />S Merging Shifting Shoulder I Down <br />(mph) L U2 I U3 I Stream <br />.25 <br />125 <br />63 <br />42 <br />50 <br />30 <br />180 <br />90 <br />60 <br />50 <br />35 <br />245 <br />123 <br />82 <br />50 <br />40 <br />320 <br />160 <br />107 <br />inn <br />50 <br />[rt <br />Page 1140 <br />60 720 360 240 50 <br />65 780 390 260 50 <br />70 840 420 280 50 <br />75 900 450 300 50 <br />* - Posted speed limit, off-peak 851h -percentile speed prior to work starting, or the anticipated operating <br />speed in mph. <br />** For other offsets use the following merging taper length formula for L: <br />For speeds of 40 mph or less, L=WS2l60 <br />For speeds of 45 mph or more, L=WS <br />Where: L = taper length in feet <br />W = width of offset in feet <br />S = posted speed limit, off-peak 851h -percentile speed prior to work <br />starting, or the anticipated operating speed in mph <br />*** - Maximum downstream taper length is 100 feet. See Section 6C,08. <br />Chapter 6H — Typical Applications November 7, 2014 <br />Part 6 — Temporary Traffic Control <br />50 <br />600 <br />300 <br />200 <br />50 <br />55 <br />660 <br />330 <br />220 <br />50 <br />60 720 360 240 50 <br />65 780 390 260 50 <br />70 840 420 280 50 <br />75 900 450 300 50 <br />* - Posted speed limit, off-peak 851h -percentile speed prior to work starting, or the anticipated operating <br />speed in mph. <br />** For other offsets use the following merging taper length formula for L: <br />For speeds of 40 mph or less, L=WS2l60 <br />For speeds of 45 mph or more, L=WS <br />Where: L = taper length in feet <br />W = width of offset in feet <br />S = posted speed limit, off-peak 851h -percentile speed prior to work <br />starting, or the anticipated operating speed in mph <br />*** - Maximum downstream taper length is 100 feet. See Section 6C,08. <br />Chapter 6H — Typical Applications November 7, 2014 <br />Part 6 — Temporary Traffic Control <br />
The URL can be used to link to this page
Your browser does not support the video tag.