Laserfiche WebLink
PS -2400403 <br />SPECIAL CONDITIONS FOR <br />CITY OF LODI — HARNEY LANE - SIGN <br />ENCROACHMENT PERMIT <br />February 8, 2024 <br />Maintain traffic controls for all roads. Traffic control delays shall not exceed 10 minutes. <br />Two-way traffic shall be maintained during non -working hours with excavated areas backfilled or <br />plated. During working hours, two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers. <br />Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br />School Buses shall be passed through the work zone with minimal delays. <br />Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br />March 31 without prior authorization from the San Joaquin County Department of Public Works <br />Field Engineering Division, contact them at 209-953-7421. <br />All destroyed or obliterated pavement markings must be replaced in kind by the permittee. Typical <br />pavement markings include but not limited to lane lines, centerlines, stop and stop ahead <br />legends, limit lines, raised pavement markers and miscellaneous delineators. <br />The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted. Prior to the start of construction, survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor, and a Corner Record <br />filed with the County Surveyor. Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor. (Land Surveyors' Act Section 8771) <br />City of Lodi shall be responsible for the maintenance of the sign and post. <br />All future maintenance of the pipeline and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit. <br />County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />10. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />