Laserfiche WebLink
m <br />CL <br />N <br />N <br />N <br />O <br />N <br />N <br />3 <br />0 <br />0 <br />z <br />W <br />z <br />w <br />c� <br />U <br />0 <br />i <br />N <br />n <br />N <br />i <br />i <br />N <br />g <br />a <br />z <br />W <br />0 <br />CL <br />U <br />CL <br />0 <br />a <br />W <br />0 <br />W <br />z <br />U <br />N <br />N <br />w <br />0 <br />af <br />CLN <br />i <br />GENERAL NOTES: <br />1. ALL IMPROVEMENTS SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE CITY OF STOCKTON, CAL WATER, AND SAN <br />JOAQUIN STANDARD SPECIFICATIONS AND PLANS, LATEST EDITION, AND ALL AMENDMENTS THERE TO TO -DATE. <br />2. BENCHMARK: BRASS DISK MARKING COS TRAVERSE CONTROL MONUMENT STAMPED "2N-12" IN MONUMENT WELL AT THE NW <br />CORNER OF WEST LN. AND ALPINE AVE. *REVISED 3/00. BENCHMARK NO. 46, WITH ELEVATION (FT.) 20.05 (NAVD88) (2008 CITYWIDE <br />BENCHMARK VERTICAL DATUM CONVERSION TO NAVD88). <br />3. PRIOR TO AND DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR BEING FAMILIAR WITH THE CURRENT <br />CITY OF STOCKTON AND SAN JOAQUIN STANDARDS AND ALL UPDATES AND REVISIONS MADE TO ANY OF THE CITY OF STOCKTON <br />OR SAN JOAQUIN COUNTY STANDARD DETAILS SHOWN ON THESE PLANS. THE CONTRACTOR IS ALSO RESPONSIBLE FOR BEING <br />FAMILIAR WITH THE WRITTEN SPECIFICATIONS AND/OR OTHER STANDARD DETAILS NOT SHOWN BUT WHICH ARE INCLUDED IN <br />THE "CITY OF STOCKTON STANDARD SPECIFICATIONS AND PLANS" AND THE "SAN JOAQUIN COUNTY IMPROVEMENT STANDARDS". <br />4. DRAWING NUMBERS SHOWN ON THE PLANS REFERRING TO CITY OF STOCKTON STANDARD PLANS, SHOWN THUS: DRAWING NO. <br />DRAWING NUMBERS SHOWN ON THE PLANS REFERRING TO SAN JOAQUIN COUNTY STANDARD PLANS, SHOWN THUS: STD. DWG. <br />NO. <br />5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING FROM DAMAGE ALL EXISTING IMPROVEMENTS THAT ARE TO <br />REMAIN. SUCH IMPROVEMENTS THAT ARE DAMAGED BY THE CONTRACTOR SHALL BE REPLACED AT HIS EXPENSE. <br />6. ALL PAVING SHALL BE IN ACCORDANCE WITH THE SAN JOAQUIN COUNTY STANDARD SPECIFICATION CHAPTER 2-5.02. <br />7. EXCAVATION OF 5 FEET OR MORE IN DEPTH WILL REQUIRE AN EXCAVATION PERMIT FROM THE STATE OF CALIFORNIA <br />DEPARTMENT OF INDUSTRIAL SAFETY. <br />8. THE CONTRACTOR SHALL DEMOLISH, EXCAVATE, REMOVE AND DISPOSE OF ALL EXISTING CONCRETE CURB, GUTTER OR <br />SIDEWALK, ASPHALT CONCRETE PAVING, AND DELETERIOUS MATERIAL AS REQUIRED TO CONSTRUCT THE CONTRACT WORK. <br />ALL SUCH EXCESS MATERIAL GENERATED SHALL BE DISPOSED OF FROM THE SITE BY THE CONTRACTOR. <br />9. THE CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT FOR ANY WORK DONE WITHIN THE CITY RIGHT-OF-WAY FROM THE <br />CITY OF STOCKTON PUBLIC WORKS DEPARTMENT, AND NOTIFY THE CITY 48 HOURS IN ADVANCE OF STARTING ANY WORK TO BE <br />ACCEPTED FOR OWNERSHIP AND MAINTENANCE BY THE CITY OF STOCKTON. THE CONTRACTOR SHALL OBTAIN AN <br />ENCROACHMENT PERMIT FOR ANY WORK DONE WITHIN THE COUNTY RIGHT-OF-WAY FROM THE SAN JOAQUIN COUNTY PUBLIC <br />WORKS DEPARTMENT, AND NOTIFY THE COUNTY 48 HOURS IN ADVANCE OF STARTING ANY WORK TO BE ACCEPTED FOR <br />OWNERSHIP AND MAINTENANCE BY THE SAN JOAQUIN COUNTY. <br />10. EXISTING UTILITIES ARE SHOWN AS THEY ARE BELIEVED TO EXIST. THE OWNER AND THE ENGINEER DO NOT ACCEPT <br />RESPONSIBILITY FOR THEIR ACCURACY. PRIOR TO COMMENCING ANY WORK, THE CONTRACTOR SHALL HAVE EACH UTILITY <br />COMPANY ACCURATELY LOCATE IN THE FIELD THEIR MAINS AND SERVICE LINES. IT SHALL BE THE CONTRACTOR'S <br />RESPONSIBILITY TO PROTECT ALL EXISTING UTILITIES. <br />11. ATTENTION IS CALLED TO: SECTION 1540 (A) (1) OF THE CONSTRUCTION SAFETY ORDERS (TITLE 8 CALIFORNIA ADMINISTRATION <br />CODE SECTION 1540), ISSUED BY THE OCCUPATIONAL SAFETY AND HEALTH STANDARDS BOARD PURSUANT TO THE CALIFORNIA <br />OCCUPATIONAL SAFETY AND HEALTH ACT OF 1973, AS AMENDED, WHICH STATES: <br />"PRIOR TO OPENING AN EXCAVATION, EFFORT SHALL BE MADE TO DETERMINE WHETHER UNDERGROUND INSTALLATION I.E., <br />SEWER, WATER, FUEL, ELECTRIC LINES, ETC., WILL BE ENCOUNTERED AND, IF SO, WHERE SUCH UNDERGROUND <br />INSTALLATIONS ARE LOCATED. WHEN THE EXCAVATION APPROACHES THE APPROXIMATE LOCATION OF SUCH AN <br />INSTALLATION, THE EXACT LOCATION SHALL BE DETERMINED BY CAREFUL PROBING OR HAND DIGGING AND WHEN IT IS <br />UNCOVERED, ADEQUATE PROTECTION SHALL BE PROVIDED FOR THE EXISTING INSTALLATION. ALL KNOWN OWNERS OF <br />UNDERGROUND FACILITIES IN THE AREA CONCERNED SHALL BE ADVISED OF PROPOSED WORK AT LEAST 48 HOURS PRIOR TO <br />THE START OF ACTUAL EXCAVATION." <br />12. THE CONTRACTOR SHALL CONTACT CALIFORNIA WATER SERVICE COMPANY AT LEAST 72 HOURS IN ADVANCE OF THE <br />CONTRACTOR'S INTENT TO CONNECT TO PUBLIC UTILITIES TO COORDINATE THE CONNECTION TO PUBLIC WATER. THE <br />CONTRACTOR SHALL CONTACT SAN JOAQUIN COUNTY AT LEAST 72 HOURS IN ADVANCE OF THE CONTRACTOR'S INTENT TO <br />CONNECT TO PUBLIC UTILITIES TO COORDINATE THE CONNECTION SEWER AND STORM DRAINAGE SYSTEMS. <br />13. PRIOR TO PERFORMING ANY WORK WITHIN THE ROAD RIGHT-OF-WAY OF SANGUINETTI LANE, THE CONTRACTOR SHALL OBTAIN <br />AN ENCROACHMENT PERMIT FROM THE SAN JOAQUIN COUNTY PUBLIC WORKS DEPARTMENT. <br />14. A TRAFFIC CONTROL PLAN (TCP) SHALL BE SUBMITTED TO AND DEEMED ACCEPTABLE BY THE SAN JOAQUIN COUNTY PUBLIC <br />WORKS DEPARTMENT PRIOR TO START OF WORK. THIS SHALL ADDRESS ALL PHASES OF WORK, WHICH WILL IMPACT PUBLIC <br />TRAFFIC. CONFORMANCE WITH THE TCP SHALL BE MAINTAINED AT ALL TIMES. <br />15. ALL TRAFFIC SIGNS AND MARKINGS SHALL CONFORM TO THE LATEST EDITION OF THE MANUAL ON UNIFORM TRAFFIC CONTROL <br />DEVICES (MUTCD), MUTCD CALIFORNIA SUPPLEMENT, AND SAN JOAQUIN COUNTY STANDARDS. <br />16. ANY CHANGES TO THE APPROVED IMPROVEMENT PLANS AND SPECIFICATIONS MUST BE PREPARED AND CERTIFIED BY THE CIVIL <br />ENGINEER, AND SHALL BE SUBMITTED TO THE SAN JOAQUIN COUNTY PUBLIC WORKS DEPARTMENT FOR APPROVAL PRIOR TO <br />IMPLEMENTATION. <br />17. ALL TRAFFIC DELINEATIONS (SIGNS, STRIPING, RAISED PAVEMENT MARKERS) SHALL BE RESTORED TO THEIR ORIGINAL <br />CONDITION UPON COMPLETION OF WORK. <br />18. PRIOR TO COMMENCING ANY WORK, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO HAVE EACH UTILITY COMPANY LOCATE <br />IN THE FIELD THEIR MAIN SERVICE LINES. THE CONTRACTOR SHALL NOTIFY MEMBERS OF THE UNDERGROUND SERVICE ALERT <br />(U.S.A.) 48 HOURS IN ADVANCE OF PERFORMING EXCAVATION WORK BY CALLING THE TOLL-FREE NUMBER (800-227-2600). <br />19. THE CONTRACTOR SHALL CHECK WITH THE UTILITY COMPANIES AND VERIFY ALL UTILITY LOCATIONS. IT SHALL BE <br />CONTRACTOR'S SOLE RESPONSIBILITY TO PROTECT ALL EXISTING UTILITIES SO THAT NO DAMAGE RESULTS TO THEM DURING <br />THE PERFORMANCE OF HIS CONTRACT. THE CONTRACTOR SHALL BE REQUIRED TO COOPERATE WITH OTHER CONTRACTORS <br />AND UTILITY COMPANIES INSTALLING NEW STRUCTURES, UTILITIES AND SERVICES TO THE DEVELOPMENT. <br />20. WHENEVER EXISTING PAVEMENT IS BROKEN OR CUT DURING THE INSTALLATION OF THE WORK COVERED BY THESE PLANS AND <br />SPECIFICATIONS, THE PAVEMENT SHALL BE REPLACED WITH PAVEMENT MATERIALS EQUAL TO OR BETTER THAN THE MATERIALS <br />USED IN THE ORIGINAL PAVING. THE FINISHED PAVEMENT SHALL BE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER IF <br />LOCATED WITHIN CITY RIGHT-OF-WAY OR THE COUNTY ENGINEER WITHIN THE COUNTY RIGHT-OF-WAY. <br />21. PAYMENT FOR PAVEMENT WILL BE MADE FOR THE AREAS SHOWN ON THE PLANS. REPLACEMENT OF PAVEMENT WHICH IS <br />BROKEN OR CUT IN THE INSTALLATION OF THE IMPROVEMENTS COVERED BY THESE PLANS AND SPECIFICATIONS, AND WHICH <br />LIES OUTSIDE OF SAID AREAS, SHALL BE INCLUDED IN THE STREET CONTRACTOR'S UNIT PRICE FOR PAVEMENT, AND NO <br />ADDITIONAL PAYMENT SHALL BE MADE FOR SUCH WORK. <br />22. THE CONTRACTOR SHALL EXPOSE EXISTING STORM DRAINS, WATER MAINS, AND SANITARY SEWERS WHERE CONNECTIONS AND <br />CROSSINGS ARE TO BE MADE SO EXISTING FLOWLINES AND LOCATIONS CAN BE VERIFIED BEFORE THE START OF <br />CONSTRUCTION. <br />23. THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING <br />THE COURSE OF CONSTRUCTION OF THIS PROJECT INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS <br />REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND THAT THE CONTRACTOR <br />SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR <br />ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE <br />SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. <br />24. CONSTRUCTION STAKING: CONSTRUCTION STAKING IS NORMALLY PERFORMED BY THE ENGINEER WHO PREPARED THE PLAN. <br />THIS PERMITS APPROPRIATE ON-SITE INTERPRETATION AND ADJUSTMENT OF THE PLANS, IF NECESSARY. CONTRACTOR SHALL <br />NOTIFY THE ENGINEER FORTY-EIGHT (48) HOURS PRIOR TO THE ACTUAL NEED FOR STAKING. ANY STAKING REQUESTED BY THE <br />CONTRACTOR OR HIS SUBCONTRACTORS WHICH EXTENDS BEYOND THE ORIGINAL SCOPE OF WORK DEFINED IN THESE PLANS <br />SHALL BE SUBJECT TO AN EXTRA WORK CHARGE TO THE CONTRACTOR. THIS NOTE GIVES FORMAL NOTICE THAT THE FIRM OF <br />SIEGFRIED ENGINEERING, INC. CANNOT, AND WILL NOT, TAKE RESPONSIBILITY FOR ERRORS OR OMISSIONS, IF ANY, WHICH <br />MIGHT OCCUR AND WHICH COULD HAVE BEEN AVOIDED OR DETECTED AND/OR CORRECTED OR MITIGATED HAD SIEGFRIED <br />ENGINEERING, INC. PERFORMED THE CONTRACT STAKING WORK. <br />25. THE CONTRACTOR SHALL OBTAIN A PERMIT FROM THE CALIFORNIA WATER SERVICE COMPANY FOR USE OF WATER FROM FIRE <br />HYDRANTS FOR CONSTRUCTION PURPOSES. THE PERMIT SHALL BE APPROVED BY THE CITY OF STOCKTON AND SAN JOAQUIN <br />COUNTY FIRE DEPARTMENTS. <br />26. THE PROPERTY OWNERS, DEVELOPERS, AND/OR SUCCESSORS IN INTEREST SHALL COMPLY WITH THE PROVISIONS OF THE <br />CALIFORNIA GENERAL CONSTRUCTION ACTIVITY STORM WATER PERMIT AND STATE WATER RESOURCES CONTROL BOARD <br />ORDER NUMBER 99-08-DWQ COMPLIANCE IS MANDATORY PER THE CITY OF STOCKTON'S GRADING AND EROSION CONTROL <br />STANDARDS AND SAN JOAQUIN COUNTY'S GRADING AND EROSION CONTROL STANDARDS. <br />27. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITS AND LICENSES REQUIRED FOR THE CONSTRUCTION AND <br />COMPLETION OF THE PROJECT. THE CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT AND A GRADING AND EROSION <br />CONTROL PERMIT PRIOR TO STARTING ANY WORK, UNLESS OTHERWISE APPROVED BY THE CITY OR COUNTY. <br />28. DUST CONTROL SHALL BE PERFORMED AT ALL TIMES, AT THE CONTRACTORS' EXPENSE, TO MINIMIZE ANY DUST NUISANCE AND <br />SHALL BE IN ACCORDANCE WITH SECTION 10 OF CALTRANS STANDARD SPECIFICATIONS, THE REQUIREMENTS OF THE CITY OF <br />STOCKTON, AND THE REQUIREMENTS OF SAN JOAQUIN COUNTY. <br />29. THE CONTRACTOR SHALL FURNISH, INSTALL OPERATE AND MAINTAIN ALL MACHINERY, APPLIANCES AND EQUIPMENT TO <br />MAINTAIN ALL EXCAVATIONS FREE FROM WATER DURING CONSTRUCTION, AND SHALL DEWATER AND DISPOSE OF THE WATER <br />SO AS TO NOT CAUSE INJURY TO PUBLIC OR PRIVATE PROPERTY, OR TO CAUSE A NUISANCE OR MENACE TO THE PUBLIC. THE <br />DEWATERING SYSTEM SHALL BE INSTALLED AND OPERATED SO THE GROUNDWATER LEVEL OUTSIDE THE EXCAVATION IS NOT <br />REDUCED TO THE EXTENT WHICH WOULD CAUSE DAMAGE OR ENDANGER ADJACENT STRUCTURES OR PROPERTY. ALL COSTS <br />FOR DEWATERING SHALL BE INCLUDED IN THE UNIT PRICE BID FOR ALL PIPE CONSTRUCTION. THE STATIC WATER LEVEL SHALL <br />BE DRAWN DOWN A MINIMUM OF 1 FOOT BELOW THE BOTTOM OF EXCAVATION OF ANY FILL TO THE SPECIFIED DENSITY. <br />DISPOSAL OF WATER SHALL BE IN ACCORDANCE WITH THE APPROVED SWPPP AND SHALL NOT DAMAGE PROPERTY, CREATE A <br />PUBLIC NUISANCE OR VIOLATE THE LAW. THE CONTRACTOR SHALL HAVE ON HAND, PUMPING EQUIPMENT AND MACHINERY IN <br />GOOD WORKING CONDITION FOR EMERGENCIES AND SHALL HAVE WORKMEN AVAILABLE FOR ITS OPERATION. THE DEWATERING <br />SYSTEM SHALL OPERATE CONTINUOUSLY UNTIL BACK -FILL HAS BEEN COMPLETED TO 1 FOOT ABOVE THE NORMAL STATIC <br />GROUNDWATER LEVEL. <br />30. SITE PREPARATION SHALL INCLUDE STRIPPING AND REMOVAL OF ALL VEGETATION AND ANY DEBRIS FROM THE CONSTRUCTION <br />AREAS. THE DEPTH OF STRIPPING ONSITE SHALL BE EVALUATED BY THE OWNER'S SOILS ENGINEER. EXISTING PAVING SHALL BE <br />INCORPORATED INTO THE STRUCTURAL FILL AND ALL OTHER STRIPPED VEGETATION AND DEBRIS SHALL NOT BE INCORPORATED <br />IN ANY OF THE STRUCTURAL FILLS. <br />31. ANY VOIDS LEFT BY THE REMOVAL OF UNDERGROUND UTILITIES OR OTHER BURIED OBJECTS SHALL BE CLEANED OF ALL LOOSE <br />SOILS AND SHALL BE PROPERLY BACKFILLED WITH ENGINEERED FILL THAT THE OWNER'S SOIL ENGINEER APPROVES, MONITORS, <br />TESTS, AND APPROVES. <br />32. THE SUBGRADE SOILS BENEATH ALL PAVING AREAS SHOULD BE COMPACTED TO A MINIMUM OF 95% OF THE DRY DENSITY WHICH <br />THE OWNER'S SOIL ENGINEER SPECIFIES. <br />33. ANY SOFT OR LOOSE SOIL POCKETS FOUND ONSITE DURING THE STRIPPING OR RECOMPACTION PROCESS SHALL BE OVER <br />EXCAVATED AND RECOMPACTED. <br />34. ENGINEERED FILL SHALL BE PLACED IN HORIZONTAL LAYERS A MAXIMUM OF 8 INCHES IN LOOSE THICKNESS AND BE COMPACTED <br />TO A MINIMUM OF 90 PERCENT OF MAXIMUM DRY DENSITY AS DETERMINED BY THE OWNER'S SOIL ENGINEER. <br />35. SUBGRADE SOILS UNDER EXTERIOR CONCRETE SHALL BE MOISTURE CONDITIONED AS APPROVED, TESTED AND INSPECTED BY <br />THE OWNER'S SOIL ENGINEER. <br />36. CONTRACTOR SHALL MAINTAIN MOISTURE CONDITION RIGHT UP TO POURING OF CONCRETE. <br />STORM DRAIN: <br />GRADING NOTES: <br />1. GRADING AND LAND STABILIZATION SHALL INCLUDE EXCAVATION AND FILL OF STREETS IN ACCORDANCE WITH THE <br />SPECIFICATIONS OF THE SOILS ENGINEER AND UNDER THE DIRECTION, SUPERVISION, MONITORING, TESTING AND APPROVAL <br />OF THE OWNER AND OWNER'S SOILS ENGINEER. <br />2. GRADING AND LAND STABILIZATION SHALL INCLUDE COST OF DEWATERING; REMOVING FROM THE SITE ALL STRIPPED <br />VEGETATION, DEBRIS, STRUCTURES, POWER POLES, EXISTING PAVEMENT, BUILDINGS, TREES, AND OTHER DELETERIOUS <br />MATERIALS. <br />3. STOCKPILES OF EXISTING DELETERIOUS MATERIAL SHALL BE DISPOSED OF UNDER THE DIRECTION AND SUPERVISION OF THE <br />OWNER AND OWNER'S SOILS ENGINEER. <br />4. ALL IMPORTED FILL SHALL BE APPROVED BY THE SOILS ENGINEER. <br />5. TOPOGRAPHICAL INFORMATION SHOWN REFLECTS A TOPOGRAPHY SURVEY PERFORMED BY SIEGFRIED ENGINEERING. <br />6. ANY AND ALL SEDIMENT AND/OR EROSION CONTROL DETAILS CONTAINED WITHIN THESE PLANS ARE TO BE CONSIDERED AS <br />"REFERENCE DETAILS" ONLY AND THE COUNTY'S APPROVAL OF THESE PLANS AND "REFERENCE DETAILS" DOES NOT RELIEVE <br />THE OWNER/DEVELOPER FROM COMPLIANCE WITH THE STORM WATER POLLUTION PREVENTION PLAN AS APPROVED BY THE <br />STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD. <br />7. ALL GRADING SHALL COMPLY WITH 2001 C.B.C. CHAPTER 18 AND APPENDIX CHAPTER 33. <br />1. THE CONTRACTOR SHALL MAINTAIN ALL EXISTING DRAINAGE FACILITIES WITHIN THE CONSTRUCTION AREA UNTIL <br />NEW DRAINAGE IMPROVEMENTS ARE IN PLACE AND FUNCTIONING, EXCEPT WHERE OTHERWISE APPROVED. LEGEND <br />ABBREVIATIONS <br />SIEGFRIED <br />3428 Brookside Road <br />Stockton, California 95219 <br />209-943-2021 <br />Fax: 209-942-0214 <br />www.siegfriedeng.com <br />CIVIL <br />STRUCTURAL <br />■ LANDSCAPE <br />ARCHITECTURE <br />■ SURVEYING <br />■ PLANNING <br />■ ATHLETIC <br />FACILITY DESIGN <br />REVISIONS <br />No. Date Description <br />SEWER: <br />EXISTING <br />PROPOSED(ONSITE) <br />ABBREVIATION <br />DESCRIPTION <br />1. <br />ALL WORK PERTAINING TO SANITARY SEWER SHALL BE IN CONFORMANCE WITH SAN JOAQUIN COUNTY STANDARD <br />,---- 3.0 ----' <br />GROUND CONTOUR <br />3.0 <br />@ <br />AT <br />SPECIFICATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL INFORMATION, DRAWINGS AND <br />AB <br />AGGREGATE BASE <br />REQUIREMENTS FROM SAN JOAQUIN COUNTY NECESSARY TO BID AND COMPLETE THE WORK SHOWN ON THESE PLANS. <br />AC <br />ASPHALT CONCRETE <br />11.93EC <br />CONCRETE ELEVATION <br />11.93C <br />ADA <br />AMERICANS WITH DISABILITIES ACT <br />2. <br />THE CONTRACTOR SHALL NOTIFY SAN JOAQUIN COUNTY 48 HOURS PRIOR TO BEGINNING ANY CONSTRUCTION. <br />BC <br />BEGINNING OF CURVE <br />15.50EP <br />PAVEMENT ELEVATION <br />15.50P <br />BLDG. <br />BUILDING <br />3. <br />THE CONTRACTOR SHALL EXPOSE EXISTING SEWER LINES TO VERIFY LOCATION AND ELEVATION PRIOR TO PLACEMENT OF PIPE. <br />15.50FL <br />BOC <br />BACK OF CURB <br />15.50EFL <br />FLOWLINE ELEVATION <br />BW <br />BACK OF WALK <br />4. <br />PIPE MATERIAL FOR SEWER PIPE 8"-15" WITH DEPTHS LESS THAN 18 FEET SHALL CONFORM TO ASTM 3034 SDR 26. PIPE <br />COL <br />COLUMN <br />MATERIAL FOR PIPES 18" AND LARGER SHALL BE AWWA C905 PRESSURE PIPE. <br />15.50EG <br />GROUND ELEVATION <br />15.50G <br />C <br />CONCRETE <br />C,G, & SW <br />CURB, GUTTER, AND SIDEWALK <br />5. <br />PRIOR TO THE START OF ANY GRADING OR CONSTRUCTION, THE CONTRACTOR SHALL PERFORM AN ACCEPTANCE TEST FOR <br />15.50ETC <br />15.00EFL <br />TOP OF CURB/ <br />FLOWLINE ELEVATION <br />15.50TC <br />15.00FL <br />CL <br />CENTERLINE <br />LEAKAGE ON (AND MAY BE REQUIRED TO T.V.) THE EXISTING SEWER WITHIN THIS PROJECT. UPON COMPLETION OF <br />CB <br />CATCH BASIN <br />CONSTRUCTION, THE CONTRACTOR SHALL RETEST AND WILL BE REQUIRED TO T.V. THE SAME EXISTING SEWER. ANY INDICATED <br />EASEMENT LINE <br />- - - - - - - - <br />CO <br />CLEANOUT <br />DAMAGE AND/OR LEAKAGE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. AND REPAIRED AT HIS EXPENSE. ALL WORK <br />COS <br />CITY OF STOCKTON <br />AND TESTING IS THE RESPONSIBILITY OF THE CONTRACTOR, AND SHALL BE PERFORMED IN THE PRESENCE OF A SAN JOAQUIN <br />PROPERTY & R/W LINE <br />DIA <br />DIAMETER <br />COUNTY ENGINEER. <br />DIP <br />DUCTILE IRON PIPE <br />PROJECT <br />- <br />CENTERLINE <br />DWG <br />DRAWING <br />6. <br />MARK ALL SEWER STUBS WITH 4" X4" XB' REDWOOD POSTS PAINTED GREEN AND BURIED HALFWAY. ADJUST ALL EXISTING <br />TOP <br />EC <br />END OF CURVE <br />SEWER MARKERS TO MINIMUM I' ABOVE FINISH GROUND. <br />EL <br />ELEVATION <br />- <br />TOE <br />- - <br />EP <br />EXISTING PAVEMENT <br />7. <br />ALL CLEANOUTS WITHIN FUTURE DRIVEWAYS SHALL HAVE TRAFFIC RATED BOXES AND COVERS. <br />ESMT <br />EASEMENT <br />- - - - - - - - <br />EDGE OF PAVEMENT <br />EX. <br />EXISTING <br />8. <br />THE CONTRACTOR SHALL MAINTAIN ALL EXISTING SEWER FACILITIES WITHIN THE CONSTRUCTION AREA UNTIL NEW SEWER <br />FL <br />FLOWLINE <br />IMPROVEMENTS ARE IN PLACE AND FUNCTIONING, EXCEPT WHERE OTHERWISE APPROVED. <br />0_� <br />LIGHT POLE <br />0_� <br />FF <br />FINISHED FLOOR <br />FOC <br />FACE OF CURB <br />WATER FACILITIES: <br />UTILITY POLE <br />FH <br />FIRE HYDRANT <br />FTG <br />FOOTING <br />C_ <br />ANCHOR GUY <br />a <br />G <br />GROUND <br />SANGUINETTI <br />1. <br />THE CONTRACTOR SHALL CONTACT CAL WATER INSPECTOR 48 HOURS PRIOR TO COMMENCEMENT OF INITIAL WATER LINE <br />GB <br />GRADE BREAK <br />CONSTRUCTION, AND BY 7:30 A.M. EACH DAY WORK ON WATER INSTALLATION OCCURS. <br />CHAIN LINK FENCE <br />HP <br />HIGH POINT <br />LANE FRONTAGE <br />2. <br />ALL FIRE HYDRANTS TO BE CLOW 860, LONG BEACH 430 OR APPROVED EQUAL. <br />SIGN <br />INV <br />NVERONTAL <br />IMPROVEMENTS <br />STORM DRAIN LINE <br />p <br />LF <br />LINEAL FEET <br />3. <br />THE LOCATIONS OF BLOWOFF HOUSINGS, ARV BOXES, AIR RELEASE VALVE ASSEMBLIES, AND STANDPIPES FOR AIR VALVES, <br />L <br />LEFT <br />ARE APPROXIMATE AS SHOWN ON THE DRAWINGS. THESE FACILITIES SHALL BE INSTALLED IN ACCORDANCE WITH CAL WATER <br />SS <br />SANITARY SEWER LIONE <br />MAX <br />MAXIMUM <br />STANDARD DETAILS. THE EXACT LOCATION OF THESE FACILITIES SHALL BE FIELD DETERMINED BY THE ENGINEER. <br />MH <br />MAINTENANCE HOLE <br />W <br />WATER LINE <br />W <br />MIN <br />MINIMUM <br />4. <br />THE CONTRACTOR SHALL PROVIDE ACCESS TO UTILITY COMPANIES FOR MAINTENANCE AND WORK ON THEIR UTILITIES <br />NO. <br />NUMBER <br />DURING THE COURSE OF THE WORK. <br />FS <br />FIRE SERVICE LINE <br />FS <br />NTS <br />NOT TO SCALE <br />P <br />PAVEMENT <br />5. <br />HORIZONTAL AND VERTICAL BEND ANGLES ARE SHOWN FOR REFERENCE ONLY. BENDS MAY BE MADE USING COMBINATIONS <br />�w� <br />RAIN WATER LEADER LINE <br />� <br />PC <br />POINT OF CURVATURE <br />OF STANDARD FITTINGS AND JOINT DEFLECTION. MAXIMUM JOINT DEFLECTION SHALL NOT EXCEED 80% OF MANUFACTURERS <br />❑ <br />FIRE HYDRANT <br />® <br />POC <br />POINT OF CONNECTION <br />1717 SANGUINETTI LN. <br />RECOMMENDATIONS. FOR FLEXIBLE PIPE, HORIZONTAL AND VERTICAL CURVES TO BE GREATER THAN MANUFACTURERS <br />pp <br />POWER POLE <br />STOCKTON, CA 95205 <br />SUGGESTED MINIMUM RADIUS: <br />© <br />BOLLARD <br />© <br />PT <br />POINT <br />8" = 200' R <br />PUE <br />PUBLIC UTILITY EASEMENT <br />10" = 250' R <br />O <br />MAINTENANCE HOLE <br />PVC <br />POLYVINYL CHLORIDE <br />12" = 300'R <br />PL <br />PROPERTY LINE <br />❑ <br />STORM DRAIN JUNCTION BOX <br />R <br />RADIAL OR RADIUS <br />WHERE APPLICABLE, THE ELEVATIONS AND SURVEY STAKEOUT INFORMATION SHALL CONTROL. <br />CLEANOUT <br />OO <br />R/W <br />RIGHT-OF-WAY <br />QRQFESS/0 <br />MF,Q�� <br />RC <br />ROLL -CURB <br />��C� �K• <br />6. <br />THRUST BLOCKS SHALL BE PLACED IN ACCORDANCE WITH THE CAL WATER STANDARD SPECIFICATIONS AND ONLY UPONRCP <br />WM <br />WATER METER <br />WM <br />REINFORCED CONCRETE PIPE <br />APPROVAL OF CAL WATER. <br />RWL <br />RAIN WATER LEADER <br />r <br />rriz <br />FB IFP <br />BACKFLOW PREVENTER <br />BFP <br />SD <br />STORM DRAIN <br />o. 7 <br />7. <br />CONTRACTOR SHALL MAINTAIN A MINIMUM OF 36" COVER OVER ALL WATER LINES. CONTRACTOR TO NOTIFY DESIGN <br />SF <br />STORM FILTER <br />Exp. 12/31/22 <br />ENGINEER IF THE EXISTING WATER LINE ELEVATIONS SHOWN ON THE PLANS DO NOT REFLECT ACTUAL FIELD CONDITIONS. <br />® <br />CURB INLET <br />® <br />SANITARY SEWERSAN <br />��9�F civ <br />SS <br />JOAQUIN COUNTY <br />D��P <br />OF <br />8. <br />THE CONTRACTOR SHALL INSTALL MECHANICAL JOINT RESTRAINTS IN THE PLACE OF CONCRETE BLOCKS. IF CONCRETE <br />® <br />STORM DRAIN INLET <br />® <br />SL <br />STREET LIGHT <br />BLOCKS ARE TO BE USED, MODIFICATION OF THE PLANS TO DEPICT LOCATIONS SHALL BE SUBMITTED WITH SUPPORTING <br />GATE VALVE <br />D4 <br />SW <br />SIDEWALK <br />07/22/22 <br />CALCULATIONS TO CITY ENGINEER FOR APPROVAL. FIRE HYDRANTS SHALL BE INSTALLED USING RESTRAINED JOINTS AND <br />SDJB <br />STORM DRAIN JUNCTION BOX <br />DATE SIGNED: <br />SHALL NOT USE THRUST BLOCKS. <br />❑E ❑E SLB <br />ELECTRICAL PULL BOX <br />SLB <br />SDMH <br />STORM DRAIN MAINTENANCE HOLE <br />SSMH <br />SANITARY SEWER MAINTENANCE HOLE <br />SHEET TITLE <br />9. <br />MARK ALL WATER STUBS WITH 4" X4'X8' REDWOOD POSTS PAINTED BLUE AND BURIED HALFWAY. ADJUST ALL EXISTING WATER <br />MARKERS TO MINIMUM I' ABOVE FINISH GROUND. <br />❑ <br />ELECTRICAL TRANSFORMER <br />❑ <br />STA <br />STD <br />STATION <br />STANDARD <br />ST <br />STREET <br />10. <br />WATER SERVICES SHALL BE AS SHOWN ON THE PLANS. <br />TC <br />TOP OF CURB <br />TI <br />TRAFFIC INDEX <br />11. <br />CONNECTION TO EXISTING CAL WATER SERVICE WATER SYSTEM AND ANY PLANNED SHUTDOWN SHALL HAVE PRIOR <br />0 <br />0 <br />TREE <br />TW <br />TOP OF WALL <br />GENERAL NOTES <br />APPROVAL OF THE CUSTOMER, THE CITY, AND THE COUNTY. CONTRACTOR TO PROVIDE A DETAILED PLAN WITH PLANNED <br />TYP <br />TYPICAL <br />SERVICE OUTAGES FOR FINAL APPROVAL PRIOR TO COMMENCEMENT OF WORK. <br />U.O.N. <br />UNLESS OTHERWISE NOTED <br />UV <br />UNDERGROUND VAULT <br />VAR <br />VAR <br />VC <br />VERTICAL CURVE <br />VERT <br />VERTICAL <br />W <br />WATER <br />WS <br />WATER SERVICE <br />Pro] Mgr AKM <br />(W) <br />WEST <br />(E) <br />EAST <br />Drawn by ARM <br />(S) <br />SOUTH <br />Date 07/22/2022 <br />(N) <br />NORTH <br />± <br />PLUS OR MINUS <br />Job No. 21172 <br />(L) <br />LEFT SIDE OF ROAD <br />(R) <br />RIGHT SIDE OF ROAD <br />SHEET: <br />oci A <br />2 OF: 9 <br />