Laserfiche WebLink
m <br />CL <br />co <br />In <br />cV <br />N <br />N <br />N <br />N <br />n <br />3 <br />0 <br />z <br />a <br />J <br />O <br />ir <br />H <br />M <br />0 <br />U <br />z <br />0 <br />N <br />O <br />af <br />W <br />0 <br />cc <br />U <br />O <br />i <br />N <br />P_ <br />C14 <br />i <br />N <br />g <br />a <br />z <br />W <br />0 <br />CL <br />V) <br />U <br />2 <br />CL <br />c� <br />LLI <br />0 <br />W <br />W <br />z <br />U <br />N <br />r - <br />C14 <br />U <br />W <br />0 <br />af <br />CLN <br />i <br />1 <br />INSTALL DI PROTECT6N ON m <br />SANGUINETTI LN. <br />NEAREST DOWNSTREAM DI <br />IN GUTTER <br />10 II l <br />J� ------ <br />r <br />co <br />Lu <br />B <br />EROSION CONTROL PLAN <br />SCALE: 1" = 30' <br />EDGE F PAVEMENT EXISTING DRAINAGE <br />12" LAP (MIN.) GRATE <br />FLOW FLOW <br />EXISTING RUNOFF WATER <br />C AC PAVING WITH SEDIMENT <br />SPILLWAY, 1 -BAG HIGH SANDBAGS �- <br />2-BAGS HIGH <br />TYPICAL PROTECTION FOR INLET ON SUMP 12" LAP - �I I— <br />(MIN.) <br />EDGE OF PAVEMENT / �� MAXIMUM BAG <br />INLET/CURB CUT / DEPTH AT TOP OF FILTER <br />F A I\1I <br />DRAIN 1 1 I BAG <br />FLOW FLOW <br />EXISTING <br />DRAINAGE FILTER <br />SANDB <br />SPILLWAY, 1 -BAG HIGH BAG AGS GRATE FILTERED ki <br />2-BAGS HIGH I f= <br />� S RUNOFF <br />TYPICAL PROTECTION FOR INLET ON GRADE <br />EXISTING T _ <br />TTT r <br />NOTES: DRAIN <br />1. INTENDED FOR SHORT-TERM USE. CROSS INLET <br />2. USE TO INHIBIT NON -STORM WATER FLOW. DRAIN <br />3. ALLOW FOR PROPER MAINTENANCE AND CLEANUP. <br />4. BAGS MUST BE REMOVED AFTER ADJACENT OPERATION IS COMPLETED. PLAN VIEW SECTION C -C <br />5. NOT APPLICABLE IN AREAS WITH HIGH SILTS AND CLAYS WITHOUT FILTER FABRIC. <br />DI PROTECTION TYPE 3 — GRAVEL BAG DETAIL <br />(SE -1 0) <br />NOT TO SCALE <br />�10'MIN� <br />STAPLES <br />(2 PER BALE) <br />STAKE <br />(TYP) <br />B NATIVE <br />MATERIAL <br />(OPTIONAL) <br />NOT TO SCALE <br />10 ML <br />PLASTIC LINING <br />WOOD OR <br />METAL STAKES – <br />(2 PER BALE) <br />SECTION B -B <br />BINDING <br />WIRE <br />STRAW <br />BALE <br />DI PROTECTION TYPE 3 — GRAVEL BAG DETAIL <br />(SE- 10) <br />NOT TO SCALE <br />SLOPE % ROLL SPACING <br />0-25 50 FT <br />25-50 15 FT <br />50% OF 10 FT <br />GREATER <br />FIBER ROLL _ <br />8" MIN. <br />SL OPE <br />EROSION CONTROL LEGEND <br />SYMBOL <br />X <br />►/ <br />DESCRIPTION <br />FIBER ROLLED WATTLE, SEE DETAIL THIS SHEET <br />CONSTRUCTION FENCE <br />SILT FENCE, SEE DETAIL THIS SHEET <br />DRAIN INLET PROTECTION, SEE DETAIL THIS SHEET <br />EROSION CONTROL GENERAL NOTES <br />STABILIZED CONSTRUCTION ENTRANCE/EXIT, <br />SEE DETAIL THIS SHEET <br />■ CONCRETE WASHOUT, CONTRACTOR TO <br />DETERMINE LOCATION, SEE DETAIL THIS SHEET <br />FLOW DIRECTION (EXISTING) <br />FLOW DIRECTION (PROPOSED) <br />00= GRAVEL BAGS <br />1. PLANS ARE DIAGRAMMATIC AND ARE NOT INTENDED TO SHOW ALL OFFSETS. THE SITE IS DYNAMIC AND CHANGES ON A DAILY BASIS, CHANGES SHOULD BE MADE <br />ACCORDING TO EXISTING CONDITIONS. BECAUSE IT IS IMPOSSIBLE TO PREDICT ALL POSSIBLE SITUATIONS, CONTRACTOR SHALL USE BEST MANAGEMENT <br />PRACTICES TO ENSURE QUALITY CONTROL. <br />2. THE CONTRACTOR SHALL REVIEW THE CURRENT STORM WATER POLLUTION PREVENTION PLAN (SWPPP). IT IS THE CONTRACTORS SOLE RESPONSIBILITY FOR <br />CONDUCTING HIS/HER OPERATIONS IN ADHERENCE TO THE SWPPP. THE CONTRACTOR IS RESPONSIBLE FOR ANY FINES, DELAYS, AND/OR DAMAGES RESULTING <br />FROM ANY STATE WATER QUALITY CONTROL BOARD SANCTIONS CAUSED BY THE OPERATION OF THE CONTRACTOR OF HIS/HER SUBCONTRACTORS. <br />3. THE FOLLOWING PLANS ARE ACCURATE FOR EROSION CONTROL PURPOSES ONLY. THE CONTRACTOR SHALL FOLLOW THESE PLANS UNLESS FIELD CONDITIONS <br />DICTATE MODIFICATION. IF MODIFICATION IS NECESSARY, A SWPPP AMENDMENT MUST BE DONE. THIS MAY REQUIRE MODIFICATION TO THESE DRAWINGS AND <br />ENGINEER CONCURRENCE. <br />4. INSPECT AND REPAIR FILTERS AFTER EACH STORM EVENT. REMOVE SEDIMENT WHEN 1/2 OF THE FILTER DEPTH HAS BEEN FILLED. REMOVED SEDIMENT SHALL BE <br />DEPOSITED IN AN AREA TRIBUTARY TO A SEDIMENT BASIN OR OTHER FILTERING MEASURE. SEDIMENT AND GRAVEL SHALL BE IMMEDIATELY REMOVED FROM <br />PAVEMENT OF ROAD. <br />5. UNFINISHED AND DISTURBED AREAS ARE TO BE PROTECTED WITH AN APPLICATION OF BLOWN STRAW AND ORGANIC BINDER. <br />ITEM LB/ACRE <br />STRAW 4,000 <br />ORGANIC BINDER 200 <br />6. ALTERNATE INLET PROTECTION SHALL BE USED ON ROADS OPEN TO THE PUBLIC IF ANY HAZARDOUS MATERIALS OR WASTES WHICH HAVE BEEN TREATED, <br />STORED, DISPOSED, SPILLED, OR LEAKED IN SIGNIFICANT QUANTITIES ONTO THE CONSTRUCTION SITE, THE CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE <br />THEM FROM THE SITE AND DISPOSE OF PROPERLY. <br />7. CHLORINATED OR DECHLORINATED WATER SHALL NOT BE DISCHARGED INTO THE STORM DRAIN SYSTEM. THE CONTRACTOR MAY DISPOSE THIS WATER INTO THE <br />SANITARY SEWER SYSTEM UPON APPROVAL BY THE GOVERNING AGENCY. <br />8. THE CONTRACTOR SHALL KEEP MAINTENANCE, INSPECTION, AND REPAIR PROCEDURES TO ENSURE THAT ALL GRADED SURFACES, WALLS, BERMS, DRAINAGE <br />STRUCTURES, VEGETATION, EROSION AND SEDIMENT CONTROL MEASURES, AND OTHER CONTROLS ARE MAINTAINED IN GOOD AND EFFECTIVE CONDITION AND <br />ARE PROMPTLY REPAIRED OR RESTORED WHEN NECESSARY. ANY DEWATERING WATER SHALL NOT BE DISCHARGED DIRECTLY INTO THE STORM WATER SYSTEM, <br />AND SHALL NOT BE DISCHARGED INTO THE SEWER SYSTEM. <br />9. ALL DEWATERING WATER MUST BE CHANNELED THROUGH AN APPROVED SEDIMENT BARRIER PRIOR TO THE WATER ENTERING THE STORM SYSTEM. <br />10. PAVEMENT CLEANING- FLUSHING OF STREETS/ PARKING LOTS TO REMOVE DIRT AND CONSTRUCTION DEBRIS IS PROHIBITED UNLESS PROPER SEDIMENT <br />CONTROLS ARE USED. PREFERABLY, AREAS REQUIRING CLEANING SHOULD BE SWEPT. <br />11. ALL STOCKPILES OF MATERIALS THAT ARE NOT GOING TO BE USED FOR 14 DAYS SHALL BE COVERED. <br />12. CONTRACTOR TO USE BEST MANAGEMENT PRACTICES (BMPs) THROUGHOUT CONSTRUCTION. USE ALL BMPs THAT APPLY TO THE PROJECT, INCLUDING BUT NOT <br />LIMITED TO THE FOLLOWING BMPs: <br />A. DRAIN INLET PROTECTION - CALIFORNIA STORMWATER BMP HANDBOOK SECTION SE -10 <br />B. SOLID WASTE MANAGEMENT - CALIFORNIA STORMWATER BMP HANDBOOK SECTION WM-5 <br />C. MATERIAL STORAGE - CALIFORNIA STORMWATER BMP HANDBOOK SECTION WM-1 <br />D. PAVING - CALIFORNIA STORMWATER BMP HANDBOOK SECTION NS -3 <br />E. DUST CONTROL, SEDIMENT CONTROL, EROSION CONTROL AND CONCRETE WASHOUT AREAS - SHOWN ON THIS SHEET WITH DETAILS <br />CRUSHED AGGREGATE GREATER <br />DITCH TO CARRY RUNOFF TO A THAN 3" BUT SMALLER THAN 6" <br />SEDIMENT TRAPPING DEVICE <br />NOTE: 12" <br />INSTALL FIBER ROLL MIN. 2" MIN. CORRUGATED STEEL PANELS <br />ALONG A LEVEL CONTOUR. 4" MAX. 20'R <br />MIN. ORIGINAL <br />3/4"x3/4" c� <br />=cam GRADE <br />MyAX r/ y WOOD STAKES �5� �A <br />'Il y MAX. 4' SPACING <br />'` ---- -- <br />�P 12"MIN., UNLESS OTHERWISE FILTER <br />y ` <br />y ySPECIFIED BY A SOILS FABRIC <br />FIBER y ENTRENCHMENT DETAIL 0'R MIN. q ENGINEER <br />y <br />-V y <br />y y <br />y <br />ROLLS y y 4 y <br />y y y y y AX <br />PLYWOOD y y <br />y y <br />48"x48" y y y MAX. ,//% <br />y / //// <br />y /j/// ///// yljl <br />PAINTED WHITE y /'' ''' y <br />yi'�i '' y y <br />y <br />y <br />BLACK LETTERS y <br />, y <br />6" HEIGHT y y y <br />y <br />y y <br />0.5" LAG y <br />SCREWS <br />WOOD POST TYPICAL FIBER ROLL INSTALLATION <br />3111 <br />FIBER ROLLS (SE -5) <br />NOT TO SCALE <br />a <br />10 MIL PLAN <br />(TYP) <br />PLASTIC <br />LINING <br />NOTES: <br />INSTALL A FIBER ROLL <br />1. ACTUAL LAYOUT <br />2" <br />DETERMINED IN FIELD. <br />1/8" 0 <br />50' OR 4X THE CIRCUM. <br />STEEL WIRE 4 <br />2. THE CONCRETE WASHOUT <br />TRANSITIONS INTO A <br />SIGN SHALL BE INSTALLED <br />WITHIN 30 FT. OF THE <br />STAPLE DETAIL <br />TEMPORARY CONCRETE <br />WASHOUT FACILITY. <br />CONCRETE WASH OUT (WM-8 ) <br />,� <br />NOT TO SCALE <br />10 ML <br />PLASTIC LINING <br />WOOD OR <br />METAL STAKES – <br />(2 PER BALE) <br />SECTION B -B <br />BINDING <br />WIRE <br />STRAW <br />BALE <br />DI PROTECTION TYPE 3 — GRAVEL BAG DETAIL <br />(SE- 10) <br />NOT TO SCALE <br />SLOPE % ROLL SPACING <br />0-25 50 FT <br />25-50 15 FT <br />50% OF 10 FT <br />GREATER <br />FIBER ROLL _ <br />8" MIN. <br />SL OPE <br />EROSION CONTROL LEGEND <br />SYMBOL <br />X <br />►/ <br />DESCRIPTION <br />FIBER ROLLED WATTLE, SEE DETAIL THIS SHEET <br />CONSTRUCTION FENCE <br />SILT FENCE, SEE DETAIL THIS SHEET <br />DRAIN INLET PROTECTION, SEE DETAIL THIS SHEET <br />EROSION CONTROL GENERAL NOTES <br />STABILIZED CONSTRUCTION ENTRANCE/EXIT, <br />SEE DETAIL THIS SHEET <br />■ CONCRETE WASHOUT, CONTRACTOR TO <br />DETERMINE LOCATION, SEE DETAIL THIS SHEET <br />FLOW DIRECTION (EXISTING) <br />FLOW DIRECTION (PROPOSED) <br />00= GRAVEL BAGS <br />1. PLANS ARE DIAGRAMMATIC AND ARE NOT INTENDED TO SHOW ALL OFFSETS. THE SITE IS DYNAMIC AND CHANGES ON A DAILY BASIS, CHANGES SHOULD BE MADE <br />ACCORDING TO EXISTING CONDITIONS. BECAUSE IT IS IMPOSSIBLE TO PREDICT ALL POSSIBLE SITUATIONS, CONTRACTOR SHALL USE BEST MANAGEMENT <br />PRACTICES TO ENSURE QUALITY CONTROL. <br />2. THE CONTRACTOR SHALL REVIEW THE CURRENT STORM WATER POLLUTION PREVENTION PLAN (SWPPP). IT IS THE CONTRACTORS SOLE RESPONSIBILITY FOR <br />CONDUCTING HIS/HER OPERATIONS IN ADHERENCE TO THE SWPPP. THE CONTRACTOR IS RESPONSIBLE FOR ANY FINES, DELAYS, AND/OR DAMAGES RESULTING <br />FROM ANY STATE WATER QUALITY CONTROL BOARD SANCTIONS CAUSED BY THE OPERATION OF THE CONTRACTOR OF HIS/HER SUBCONTRACTORS. <br />3. THE FOLLOWING PLANS ARE ACCURATE FOR EROSION CONTROL PURPOSES ONLY. THE CONTRACTOR SHALL FOLLOW THESE PLANS UNLESS FIELD CONDITIONS <br />DICTATE MODIFICATION. IF MODIFICATION IS NECESSARY, A SWPPP AMENDMENT MUST BE DONE. THIS MAY REQUIRE MODIFICATION TO THESE DRAWINGS AND <br />ENGINEER CONCURRENCE. <br />4. INSPECT AND REPAIR FILTERS AFTER EACH STORM EVENT. REMOVE SEDIMENT WHEN 1/2 OF THE FILTER DEPTH HAS BEEN FILLED. REMOVED SEDIMENT SHALL BE <br />DEPOSITED IN AN AREA TRIBUTARY TO A SEDIMENT BASIN OR OTHER FILTERING MEASURE. SEDIMENT AND GRAVEL SHALL BE IMMEDIATELY REMOVED FROM <br />PAVEMENT OF ROAD. <br />5. UNFINISHED AND DISTURBED AREAS ARE TO BE PROTECTED WITH AN APPLICATION OF BLOWN STRAW AND ORGANIC BINDER. <br />ITEM LB/ACRE <br />STRAW 4,000 <br />ORGANIC BINDER 200 <br />6. ALTERNATE INLET PROTECTION SHALL BE USED ON ROADS OPEN TO THE PUBLIC IF ANY HAZARDOUS MATERIALS OR WASTES WHICH HAVE BEEN TREATED, <br />STORED, DISPOSED, SPILLED, OR LEAKED IN SIGNIFICANT QUANTITIES ONTO THE CONSTRUCTION SITE, THE CONTRACTOR SHALL BE RESPONSIBLE TO REMOVE <br />THEM FROM THE SITE AND DISPOSE OF PROPERLY. <br />7. CHLORINATED OR DECHLORINATED WATER SHALL NOT BE DISCHARGED INTO THE STORM DRAIN SYSTEM. THE CONTRACTOR MAY DISPOSE THIS WATER INTO THE <br />SANITARY SEWER SYSTEM UPON APPROVAL BY THE GOVERNING AGENCY. <br />8. THE CONTRACTOR SHALL KEEP MAINTENANCE, INSPECTION, AND REPAIR PROCEDURES TO ENSURE THAT ALL GRADED SURFACES, WALLS, BERMS, DRAINAGE <br />STRUCTURES, VEGETATION, EROSION AND SEDIMENT CONTROL MEASURES, AND OTHER CONTROLS ARE MAINTAINED IN GOOD AND EFFECTIVE CONDITION AND <br />ARE PROMPTLY REPAIRED OR RESTORED WHEN NECESSARY. ANY DEWATERING WATER SHALL NOT BE DISCHARGED DIRECTLY INTO THE STORM WATER SYSTEM, <br />AND SHALL NOT BE DISCHARGED INTO THE SEWER SYSTEM. <br />9. ALL DEWATERING WATER MUST BE CHANNELED THROUGH AN APPROVED SEDIMENT BARRIER PRIOR TO THE WATER ENTERING THE STORM SYSTEM. <br />10. PAVEMENT CLEANING- FLUSHING OF STREETS/ PARKING LOTS TO REMOVE DIRT AND CONSTRUCTION DEBRIS IS PROHIBITED UNLESS PROPER SEDIMENT <br />CONTROLS ARE USED. PREFERABLY, AREAS REQUIRING CLEANING SHOULD BE SWEPT. <br />11. ALL STOCKPILES OF MATERIALS THAT ARE NOT GOING TO BE USED FOR 14 DAYS SHALL BE COVERED. <br />12. CONTRACTOR TO USE BEST MANAGEMENT PRACTICES (BMPs) THROUGHOUT CONSTRUCTION. USE ALL BMPs THAT APPLY TO THE PROJECT, INCLUDING BUT NOT <br />LIMITED TO THE FOLLOWING BMPs: <br />A. DRAIN INLET PROTECTION - CALIFORNIA STORMWATER BMP HANDBOOK SECTION SE -10 <br />B. SOLID WASTE MANAGEMENT - CALIFORNIA STORMWATER BMP HANDBOOK SECTION WM-5 <br />C. MATERIAL STORAGE - CALIFORNIA STORMWATER BMP HANDBOOK SECTION WM-1 <br />D. PAVING - CALIFORNIA STORMWATER BMP HANDBOOK SECTION NS -3 <br />E. DUST CONTROL, SEDIMENT CONTROL, EROSION CONTROL AND CONCRETE WASHOUT AREAS - SHOWN ON THIS SHEET WITH DETAILS <br />CRUSHED AGGREGATE GREATER <br />DITCH TO CARRY RUNOFF TO A THAN 3" BUT SMALLER THAN 6" <br />SEDIMENT TRAPPING DEVICE <br />NOTE: 12" <br />INSTALL FIBER ROLL MIN. 2" MIN. CORRUGATED STEEL PANELS <br />ALONG A LEVEL CONTOUR. 4" MAX. 20'R <br />MIN. ORIGINAL <br />3/4"x3/4" c� <br />=cam GRADE <br />MyAX r/ y WOOD STAKES �5� �A <br />'Il y MAX. 4' SPACING <br />'` ---- -- <br />�P 12"MIN., UNLESS OTHERWISE FILTER <br />y ` <br />y ySPECIFIED BY A SOILS FABRIC <br />FIBER y ENTRENCHMENT DETAIL 0'R MIN. q ENGINEER <br />y <br />-V y <br />y y <br />y <br />ROLLS y y 4 y <br />y y y y y AX <br />PLYWOOD y y <br />y y <br />48"x48" y y y MAX. ,//% <br />y / //// <br />y /j/// ///// yljl <br />PAINTED WHITE y /'' ''' y <br />yi'�i '' y y <br />y <br />y <br />BLACK LETTERS y <br />, y <br />6" HEIGHT y y y <br />y <br />y y <br />0.5" LAG y <br />SCREWS <br />WOOD POST TYPICAL FIBER ROLL INSTALLATION <br />3111 <br />FIBER ROLLS (SE -5) <br />NOT TO SCALE <br />NOT TO SCALE <br />SEDIMENT CONTROL <br />FABRIC <br />RUNOFF WATER <br />W/ SEDIMENT <br />GRAVEL <br />ATTACH TO <br />EXISTING FENCE IF <br />ONE EXISTS <br />POST <br />7.5' O.C. <br />ro <br />N <br />d <br />SECTION <br />n"vn" <br />PLAN VIEW <br />n A <br />JOINING <br />SILT FENCE SEDIMENT BARRIER (SE -1) <br />NOT TO SCALE <br />■ <br />SIEGFRIED <br />3428 Brookside Road <br />Stockton, California 95219 <br />209-943-2021 <br />Fax: 209-942-0214 <br />www.siegfriedeng.com <br />CIVIL <br />■ STRUCTURAL <br />■ LANDSCAPE <br />ARCHITECTURE <br />■ SURVEYING <br />■ PLANNING <br />■ ATHLETIC <br />FACILITY DESIGN <br />REVISIONS <br />No. Date Description <br />PROJECT <br />SANGUINETTI <br />LANE FRONTAGE <br />IMPROVEMENTS <br />1717 SANGUINETTI LN. I <br />STOCKTON, CA 95205 <br />DATE SIGNED: 07/22/22 <br />SHEET TITLE <br />EROSION <br />CONTROL PLAN <br />Pro] Mgr AKM <br />Drawn by ARM <br />Date 07/22/2022 <br />Job No. 21172 <br />SHEET: <br />OC6mO <br />7 OF: 9 <br />SECTION A -A <br />INSTALL A FIBER ROLL <br />i <br />QQ' WASH RACK ` <br />CRUSHED AGGREGATE GREATER THAN <br />NEAR SLOPE WHERE IT <br />50' OR 4X THE CIRCUM. <br />B �'�`L <br />3" BUT SMALLER THAN 6" <br />TRANSITIONS INTO A <br />OF THE LARGEST VEHICLE TIRE, <br />FILTER FABRIC ORIGINAL <br />STEEPER SLOPE <br />WHICHEVER IS GREATER <br />GRADE <br />NOTE: <br />MANY DESIGNS CAN BE FIELD <br />FABRICATED, OR FABRICATED UNITS <br />12" MIN., UNLESS OTHERWISE SPECIFIED <br />MAY BE USED. <br />BY A SOILS ENGINEER <br />STABILIZED CONSTRUCTION ENTRANCE/EXIT TIRE <br />WASH (TC -1) <br />NOT TO SCALE <br />SEDIMENT CONTROL <br />FABRIC <br />RUNOFF WATER <br />W/ SEDIMENT <br />GRAVEL <br />ATTACH TO <br />EXISTING FENCE IF <br />ONE EXISTS <br />POST <br />7.5' O.C. <br />ro <br />N <br />d <br />SECTION <br />n"vn" <br />PLAN VIEW <br />n A <br />JOINING <br />SILT FENCE SEDIMENT BARRIER (SE -1) <br />NOT TO SCALE <br />■ <br />SIEGFRIED <br />3428 Brookside Road <br />Stockton, California 95219 <br />209-943-2021 <br />Fax: 209-942-0214 <br />www.siegfriedeng.com <br />CIVIL <br />■ STRUCTURAL <br />■ LANDSCAPE <br />ARCHITECTURE <br />■ SURVEYING <br />■ PLANNING <br />■ ATHLETIC <br />FACILITY DESIGN <br />REVISIONS <br />No. Date Description <br />PROJECT <br />SANGUINETTI <br />LANE FRONTAGE <br />IMPROVEMENTS <br />1717 SANGUINETTI LN. I <br />STOCKTON, CA 95205 <br />DATE SIGNED: 07/22/22 <br />SHEET TITLE <br />EROSION <br />CONTROL PLAN <br />Pro] Mgr AKM <br />Drawn by ARM <br />Date 07/22/2022 <br />Job No. 21172 <br />SHEET: <br />OC6mO <br />7 OF: 9 <br />