My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2024_PS-2400501 thru PS-2401000_ - PS-2400559
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2024
>
PS-2400501 thru PS-2401000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2024_PS-2400501 thru PS-2401000_ - PS-2400559
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 11:23:58 AM
Creation date
2/28/2024 11:20:48 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2400559
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2024
Notes2
Lower Sacramento Rd.
Type - Permit Process
Bore (up to 12 inch Dia)
Address
1445 Van Ness Ave., Fresno,CA 93721
Application
AT&T-Fresno (Valley Permit Desk)
Supplemental fields
Cross Ref
PWP730079
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
24024 N LOWER SACRAMENTO RD. <br />N LOWER SACRAMENTO RD. & E JAHANT RD. <br />-BORING, TRENCHING, DIG PIT & MH PL, <br />WORK AREA 2 OF 2 <br />PHASE 7 OF 2 <br />UNDERGROUND <br />SPEED5 <br />N LOWERE] <br />SACRAMENTO RD. <br />KEEP <br />END <br />I <br />WORK RIGHT <br />—2 R4 -7a <br />O.P. <br />BOG LINE <br />y <br />BOG LI <br />O.P. <br />3! <br />ROAD <br />WORK <br />AHEAD <br />W2D-1 <br />24024 N LOWER SACRAMENTO RD. VLANE (CA) <br />YPE III <br />ICADE <br />KEEP EXIST. MH #690 <br />i � TR242 <br />� EXIST. POLE #2426 <br />RIGHT TRENCH <br />RECEIVE PIT <br />IV/// <br />34R4 -7a <br />7E.O.P. <br />OG LINE <br />N <br />5 <br />LOCATION MAP <br />„o <br />EJohantRd - ..i.. <br />WORK AREA <br />€ Jand'f: Rd <br />cn <br />N <br />350' <br />} ISSUE DATE <br />a `& } ` 1 08-08-23 <br />.O.P. <br />y 22' MAX. <br />- - - - OG LINE BIKE LANE FOG L <br />--E.O.P. <br />Q.O.P. <br />75' OPENING <br />It <br />0 <br />M <br />1 1. � COA (C" <br />a a <br />Lo <br />m ROAD <br />WORK <br />END t AHEAD <br />ROAD WORK <br />G20-2 W20-1 <br />E JAHANT RD. <br />NO SPEED LIMIT FOUND ON E JAHANT RD., <br />E JAHANT RD. TRAFFIC CONTROL PLAN IS <br />SETUP AT 45 MPH. <br />go <br />SPEED <br />N LOWER 45 <br />SACRAMENTO RD. <br />LEGEND <br />CONTACT PROPERTY OWNER(S) 72 <br />LONE <br />HOURS PRIOR TO START OF WORK. <br />CLOSE <br />= TYPE II BARRICADE W/SIGN (3'H x 2'W) <br />C30 (CA) <br />= 28" (11cm) TRAFFIC CONES W/ 13" (5cm) REFLECTIVE SLEEVE <br />ON TYPE III <br />FLAGGERS SHALL REMAIN IN <br />BARRICADE <br />COMMUNICATION VIA RADIO AT <br />Z <br />ALL TIMES. <br />.O.P. <br />y 22' MAX. <br />- - - - OG LINE BIKE LANE FOG L <br />--E.O.P. <br />Q.O.P. <br />75' OPENING <br />It <br />0 <br />M <br />1 1. � COA (C" <br />a a <br />Lo <br />m ROAD <br />WORK <br />END t AHEAD <br />ROAD WORK <br />G20-2 W20-1 <br />E JAHANT RD. <br />NO SPEED LIMIT FOUND ON E JAHANT RD., <br />E JAHANT RD. TRAFFIC CONTROL PLAN IS <br />SETUP AT 45 MPH. <br />go <br />SPEED <br />N LOWER 45 <br />SACRAMENTO RD. <br />LEGEND <br />= PORTABLE FLASHING BEACON (P.F.B.) <br />H <br />= TYPE III BARRICADE W/SIGN (5'H x 4'W) <br />} <br />= TYPE II BARRICADE W/SIGN (3'H x 2'W) <br />• <br />= 28" (11cm) TRAFFIC CONES W/ 13" (5cm) REFLECTIVE SLEEVE <br />FOR DAY/NIGHT USE OR DELINEATORS IF DAY USE ONLY <br />T <br />= TRAFFIC CONE WITH CLIP ON SIGN <br />Z <br />= TYPE I W/ SIGN <br />= EXISTING SIGN <br />O= <br />SIGNALIZED INTERSECTION <br />pQa <br />= FLASHING ARROWBOARD <br />y <br />= HIGH LEVEL WARNING DEVICE (FLAGTREE) <br />n <br />= FLAGGER <br />TAN11SAT <br />= TOW AWAY NO STOPPING ANY TIME <br />® <br />= EXISTING DRIVEWAY <br />® <br />= WORK ZONE (ACTIVITY AREA) LIMITS <br />y <br />= DIRECTION OF TRAFFIC <br />Z <br />MAINTAIN DRIVEWAY ACCESS <br />AT ALL TIMES <br />PHASE 1 OF 2 <br />TYPE OF CONSTRUCTION: <br />BORING, TRENCHING, DIG PIT & MH PL. <br />JOB NUMBER: AO 2 n XWA <br />SCALE: <br />PAGE: TC -8 OF TC -10 1 1:60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.