Laserfiche WebLink
=81 <br />250' <br />Tredway Rd <br />Tredway Rd 40 <br />Q <br />U <br />rn <br />U <br />kM <br />O <br />4. <br />O <br />250' <br />P&M <br />►� <br />6 <br />o W20-1 <br />1 <br />s3� <br />C9A(CA) <br />1I <br />W3-4 <br />Froid <br />100' <br />1 <br />LO <br />N <br />m <br />m <br />m <br />Z <br />NO PARKING SIGNS <br />Barricade mounted, placed <br />on both sides of the street. <br />TOW -AWAY 72hrs prior to the start <br />ZONE of work. <br />DATE: <br />TIME: <br />10, , I <br />- 50 <br />JOB#/PM# AGENCY <br />35292262 San Joaquin County <br />........................................................................................... ............................ <br />SHEET# PROJECT LOCATION <br />TC -4 TredwayRd & N Neeley Rd <br />250' C�=F <br />TCP QUESTIONS CALL: <br />�F <br />209-/� 00-7075 <br />• TRAFFIC CONTROL PER LATEST CA <br />MUTCU. <br />ALL FLAGGERS TO COMMUNICATE <br />THROUGH HAND SIGNALS AND <br />RADIO DEVICES. <br />BICYCLE, AND <br />DRIVEWAYS REMAIN OPEN <br />UNLESS NOTED ON TRAFFIC PLAN. <br />WORK AREA <br />O <br />c ITY <br />♦ . RISE <br />1 S <br />V <br />T APER <br />=81 <br />250' <br />Tredway Rd <br />Tredway Rd 40 <br />Q <br />U <br />rn <br />U <br />kM <br />O <br />4. <br />O <br />250' <br />P&M <br />►� <br />6 <br />o W20-1 <br />1 <br />s3� <br />C9A(CA) <br />1I <br />W3-4 <br />Froid <br />100' <br />1 <br />LO <br />N <br />m <br />m <br />m <br />Z <br />NO PARKING SIGNS <br />Barricade mounted, placed <br />on both sides of the street. <br />TOW -AWAY 72hrs prior to the start <br />ZONE of work. <br />DATE: <br />TIME: <br />10, , I <br />- 50 <br />JOB#/PM# AGENCY <br />35292262 San Joaquin County <br />........................................................................................... ............................ <br />SHEET# PROJECT LOCATION <br />TC -4 TredwayRd & N Neeley Rd <br />PRIME CONTRACTOR <br />PGE <br />TCP QUESTIONS CALL: <br />�F <br />209-/� 00-7075 <br />• TRAFFIC CONTROL PER LATEST CA <br />MUTCU. <br />ALL FLAGGERS TO COMMUNICATE <br />THROUGH HAND SIGNALS AND <br />RADIO DEVICES. <br />BICYCLE, AND <br />DRIVEWAYS REMAIN OPEN <br />UNLESS NOTED ON TRAFFIC PLAN. <br />WORK AREA <br />CONE SPACING <br />c ITY <br />♦ . RISE <br />1 S <br />V <br />T APER <br />TANGENT <br />T NT <br />PREPARED BY INITIALS <br />ZL <br />40' <br />80' <br />SCALE <br />NOT TO SCALE <br />DTE PREPRISE, REDLLC <br />DATE PREPARED <br />01/06/2024 <br />HOURS OF WORKTO BE DETERMINED BYAGENCY <br />