Laserfiche WebLink
Cry 3 o. -ch i a 1V? TCD 2 014dill- i-oi <br />C-�_► <<WA's 1J -U ► CD 2009 Edit-lon, hicludin g ?e -visions 1 °, 2, as alneinded for use iii California) <br />1 .: <br />Table 6F-101(CA). Maximum S 'acing of Channelizing Devices <br />Seed <br />(m,h) <br />24 <br />25 <br />30 <br />35 <br />40 <br />45 <br />50 <br />55 <br />60 <br />65 <br />70 <br />75 <br />Maximum Channelizing Devices spacing <br />Taper' <br />(feet) <br />Tangent <br />(feet) <br />Conflict <br />(feet <br />20 <br />40 <br />10 <br />25 <br />50 <br />12 <br />30 <br />60 <br />15 <br />35 <br />70 <br />17 <br />40 <br />80 <br />20 <br />45 <br />90 <br />22 <br />50 <br />100 <br />25 <br />50 <br />100 <br />25 <br />50 <br />100 <br />25 <br />50 <br />100 <br />25 <br />50' <br />100 <br />25 <br />It 50 <br />100 <br />25 <br />Maximum channeliirng device spacing for A speeds on one-lardmo-way tapers is <br />20 feet. <br />Maximum channefzing device spacing for all speeds on downstream tapes is 20 <br />feet. <br />/ill other tapers are as shown. <br />.�. _ Use on intermediate and short-term projects fOrtaper and tangent sect where <br />there are no pavement markings or where there is a conMct beWw.,m ends ng <br />pavement markings and channelizing devices. <br />�abL117 <br />Chapter 6F — Temporary Traffic Control Zme Devices November 7. 2014 <br />