m
<br />0
<br />A
<br />2 � 3
<br />VICINITY MAP
<br />a�
<br />Y
<br />Lovroi y ; a
<br />'rr �Funan't
<br />� a
<br />c
<br />G M Sports Salvage � N
<br />Au::a parts store
<br />Fuita"� PROPOSED LOCATION
<br />A
<br />m
<br />° z
<br />m
<br />a
<br />m 7 0
<br />A � gun` Or
<br />q 7 0 £�
<br />ro
<br />Dale Carnegie Training
<br />of the San Joaquin Valley
<br />Z
<br />N.
<br />6t j°
<br />ISE
<br />� � a
<br />µ $Valero v
<br />n <
<br />P e
<br />4 2GL? Zig.gv s Snno.ve Sinop
<br />El Gnullense
<br />C1 � iytr �!fnl f • .:
<br />a
<br />Z,
<br />e Pie
<br />A
<br />• h=
<br />E Alpine Ave
<br />�West Lane P
<br />L -A - q Trans' 4e••rnces
<br />®rrner
<br />1. INSTALL 49' DWA-SD LOCATED ON E STADIUM W/O WEST LN IN STOCKTON PER 0-13.2.
<br />2. UTILIZE EXISTING ELECTRIC SERVICE AND AC DISCONNECT SWITCH. INSTALL SECOND NEUTRAL BUS BAR.
<br />3. UTILIZE EXISTING 40V/5A POLE MOUNTED RECTIFIER.
<br />4. UTILIZE EXISTING WATCHDOG REMOTE MONITORING UNIT.
<br />5. INSTALL (2) NEW GROUND RODS IN G-5. FIRST GROUND ROD TO BE INSTALLED AT THE BASE OF THE POLE AND THE SECOND GROUND ROD
<br />TO BE INSTALLED A MINIMUM OF 6' FROM THE FIRST GROUND ROD.
<br />6. INSTALL (2) #8 CATHODE LEADS TO THE 2" STL GAS MAIN.
<br />7. INSTALL ANODE JUNCTION BOX.
<br />8. INSTALL NEW P -SHOOTER TO TOP OF AC RISER.
<br />9. ANODE WIRES AND NEW CATHODE LEADS TO BE LANDED IN NEW AJB PER GS&S 0-13.2.
<br />10. DEACTIVATE THE EXISTING DEEP WELL ANODE LOCATED ON E STADIUM AND WEST LN IN STOCKTON PER COUNTY REQUIREMENTS.
<br />11. CITY ENCROACHMENT AND COUNTY WELL PERMIT IS REQUIRED.
<br />1. PRIOR TO STARTING WORK, CONTACT LOCAL AREA CORROSION SUPERVISOR REGARDING CATHODIC PROTECTION REQUIREMENTS AND I&R SUPERVISOR REGARDING ANY SHUTDOWN, ABANDONMENT,
<br />OR TIE-IN OF ANY MAINS WHICH MAY AFFECT ANY DISTRICT REGULATOR STATION.
<br />2, ALL STEEL TIE-INS, CUT OFFS AND CAPPING OF CAST IRON AND STEEL MAIN PER A-36 AND C-37.
<br />3. ALL PLASTIC CONNECTIONS TO BE PERFORMED IN ACCORDANCE WITH THE APPROPRIATE PROCEDURES LISTED IN TD -4170S.
<br />4. UNLESS OTHERWISE NOTED, CONSTRUCTION TO REFERENCE TD -4125P-09 TO DETERMINE EXISTING STEEL PIPE SPECS.
<br />5. ALL ARC WELDING IS TO BE PERFORMED IN ACCORDANCE WITH THE GAS WELDING CONTROL MANUAL TD -4160M. REFER TO TD-416OP-20 FOR GENERAL WELDING REQUIREMENTS.
<br />6. PURGE MAINS 10" IN DIAMETER & LESS PER GS&S A-38, ATTACHMENT A, PROCEDURE 2. PURGE MAINS GREATER THAN 10" IN DIAMETER PER GS&S A-38, ATTACHMENT A, PROCEDURE 3.
<br />7. ABANDON ALL UNDERGROUND GAS FACILITIES PER UTILITY PROCEDURE TD-950OP-16 & GS&S A-93.2.
<br />8. PLACE ELECTRONIC MARKING SYSTEM (EMS) DEVICES ON ALL CUT OFF ENDS AND SECTIONALIZING POINTS OF DEACTIVATED PIPE PER TD-950OP-16.
<br />9. FOLLOW ALL MINIMUM INSTALLATION DEPTHS FOR TRANSMISSION, DISTRIBUTION AND SERVICE PIPE BY CLASS LOCATION AND SOIL TYPES OUTLINED IN GS&S A-04.
<br />10. ALL GAS RISERS ARE TO BE INSTALLED IN ACCORDANCE WITH GS&S J-15 & J-15.1.
<br />11. INSTALL METER PROTECTION PER GS&S J-95.
<br />12. VENT REGULATORS PER GS&S H-93.
<br />13. LOCATION OF EXISTING UTILITIES ARE APPROXIMATE. CALL UNDERGROUND SERVICES ALERT (USA) TO CONFIRM. GAS PIPELINES MUST BE INSTALLED WITH AT LEAST 3' OF SEPARATION (5'
<br />PREFERRED) ON ANY PARALLELED INSTALLATION FROM ANY WET UTILITY AND 12" MINIMUM FROM ANY PERPENDICULAR CROSSING PER U.O. STANDARD S5453.
<br />14. CONSTRUCTION SHALL NOTIFY MAPPING WITHIN 24 HOURS OF ALL OPERATIONAL CHANGES TO MAINS, INCLUDING EVERY TIE-IN, CUT OFF, UPRATE, ETC. PER U.O. STANDARD S4412.
<br />15. ALL STEEL RISERS ARE TO BE REPLACED WITH NON CORRODIBLE RISERS OR REPLACED BY USING THE RISER INSERT RENEWAL INSTALLATION PER GS&S A-90.
<br />16. ALL SERVICES AND MAINS TO BE TESTED PRIOR TO TIE-IN PER GS&S A-34.
<br />17. INSTALL PLASTIC MAIN, SERVICES, & LOCATING WIRE PER GS&S A-34, A-90, A-90.2, A-90.3, A-91, A-93, A-93.1, A-93.3, UTILITY STANDARD TD -4170S, D-34 & CORROSION CONTROL
<br />STANDARD TD -4181 S.
<br />18. INSTALL ANODES PER CORROSION CONTROL MANUAL 0-13.1.
<br />19. INSTALL ELECTROLYSIS TEST STATIONS PER CORROSION CONTROL MANUAL 0-10 AND 0-10.1. IF PRACTICAL, INSTALL ETS STATION OUT OF THE ROADWAY.
<br />20. ALL EXCAVATION TO BE PERFORMED PER TD -5811M, TD -5811P-301, TD -5811P-105, TD -4412P-05, AND TD -4621S. STANDBY REQUIRED IF EXCAVATING WITHIN 5' OF A CRITICAL FACILITY,
<br />BORING ACTIVITY THAT CROSSES OR THAT PARALLELS WITHIN 10' OF A CRITICAL FACILITY. CONTACT THE CONSTRUCTION SUPERVISOR.
<br />21. NOTIFY SCHOOLS AND HOSPITALS WITHIN 500' OF PROPOSED EXCAVATION FOR GAS FACILITIES A MINIMUM OF 3 DAYS PRIOR TO DIGGING PER AB 1937.
<br />22. ANY PIPE REPLACEMENT VIA SPLITTING TO BE DONE PER TD -4634P-01 & TD -4634P-02.
<br />23. CAMERA INSPECTION (PRE/POST) FOR TRENCHLESS METHODS TO BE PERFORMED PER TD -4632P-01.
<br />24. WARNING TAPE IS TO BE INSTALLED IN OPEN TRENCH INSTALLATION OVER GAS PIPELINES IN BOTH TRANSMISSION AND DISTRIBUTION FACILITIES. THIS INCLUDES BELL HOLES, EXCAVATIONS FOR
<br />REPAIR PURPOSES AND RISER REPLACEMENTS PER GS&S L-16.
<br />25. DEVIATIONS FROM THIS APPROVED DESIGN SHALL BE PROCESSED IN ACCORDANCE WITH TD -4014P-05 "FIELD DESIGN CHANGE PROCESS FOR DISTRIBUTION LINES AND DUAL -ASSET FACILITIES."
<br />26. ALL TRENCH SPOILS AND BACKFILL MUST BE USED OR DISPOSED WITH AS REQUIRED BY PG&E SPECIFICATIONS AND ANY LOCAL CITY, COUNTY OR STATE REQUIREMENTS.
<br />27. PG&E TO INSTALL/RESTORE TEMPORARY AND/OR PERMANENT PAVING IN ACCORDANCE WITH PG&E SPECIFICATIONS AND ANY LOCAL CITY, COUNTY OR STATE REQUIREMENTS.
<br />28. STAND-BY REQUIREMENTS MUST BE IN ACCORDANCE WITH TD -5811P-301, TD -5811P-105 & TD -5811B-005 WITH WORKING NEAR ANY CRITICAL FACILITIES.
<br />29. MONUMENT PRESERVATION AS REQUIRED BY THE PROFESSIONAL LAND SURVEYORS' ACT (BUSINESS AND PROFESSION CODE SUB -SECTION 8700-8805) SECTION 8771; PRIOR TO THE START OF
<br />CONSTRUCTION, ALL SURVEY MONUMENTS, WITHIN THE PROJECT LIMITS THAT HAVE THE POSSIBILITY OF BEING DAMAGED OR DESTROYED DURING CONSTRUCTION, MUST BE LOCATED, AND
<br />REFERENCED BY A LICENSED LAND SURVEYOR, AND A CORNER OF RECORD OR RECORD OF SURVEY SHALL BE FILED WITH THE COUNTY SURVEYOR. IF ANY OF THESE SURVEY MONUMENTS ARE
<br />DESTROYED, DAMAGED OR COVERED OVER DURING CONSTRUCTION, A NEW MONUMENT AND MONUMENT BOX MUST THEN BE SET IN ITS PLACE, AT THE ORIGINAL LOCATION, BY A LICENSED
<br />LAND SURVEYOR, AND ANOTHER CORNER OF RECORD OR RECORD OF SURVEY FILED WITH THE COUNTY SURVEYOR.
<br />30. CONSTRUCTION MEANS AND METHODS MAY DEVIATE PER FIELD VERIFIED CONDITIONS IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS. IF THERE ARE ANY QUESTIONS, CONTACT
<br />RESPONSIBLE ENGINEER.
<br />49 D111111111111VA SID INSTALLATION
<br />E STADIUM DR & WEST LN
<br />STOCKTON, CA
<br />PLAN VIEW
<br />v j
<br />\ \ 6 y
<br />v
<br />crt
<br />r �
<br />161g� \\ � \\ sl`" FIG/OR X60'1
<br />S� PQ�UM / Np STIED
<br />�12\\ slW
<br />FIG
<br />P f
<br />/ FIG Ne BI`N
<br />NAP /
<br />FIG
<br />DIF
<br />/ RP MPORE / NQ �1p
<br />�S\�R NP1a'19'�9 r/ Fcar�
<br />_ Z .
<br />�\EO
<br />e I`N
<br />Flc 11'
<br />Ns \
<br />D� cD
<br />• t�
<br />t J \ A \vl ,QBE 12�1�
<br />A
<br />g
<br />�^ SCALE:1 ":20'
<br />8 � 9
<br />FIP EXISTING GAS MAIN (SIZE NOTED)
<br />- - - - - - - GROUND WIRES (INSTALL)
<br />- - - - - ANODE WIRES (INSTALL)
<br />- - - CATHODE WIRES (INSTALL)
<br />GAS SERVICE (EXISTING)
<br />PROPERTY LINE (EXISTING)
<br />a/w BACK OF WALK (EXISTING)
<br />F/C FACE OF CURB (EXISTING)
<br />- - RIGHT OF WAY (EXISTING)
<br />i DEEP WELL ANODE (INSTALL)
<br />GROUND ROD (INSTALL)
<br />0 DEEP WELL ANODE (EXISTING)
<br />T RECTIFIER (EXISTING)
<br />PG&E POLE (EXISTING)
<br />® VALVE (EXISTING)
<br />PHONELOCAL CONTACT INFO:
<br />CELL
<br />MICHAEL GUAJARDO CORROSION MECHANIC (209) 985-8329
<br />iCORROSION O• (925) 383-6468
<br />CORROSION i
<br />SENIOR i(650) 773-9234
<br />DISTRIBLITION a 658-0845
<br />i.PLANNING ENGINEER 0. 942-1626
<br />�• 0579-6389
<br />(707) 296-4343WORKINGO•
<br />GC FIELD ENGINEER
<br />NOTIFIED U.S.A.
<br />DATE:
<br />TICKET #
<br />BY:
<br />CATHODIC PROTECTION IN WORK AREA
<br />ATTENTION FOREMAN:
<br />NOTIFY THE CORROSION DEPT. AT
<br />(925) 383-6468, 48 HOURS PRIOR TO
<br />START OF WORK.
<br />ATTENTION FOREMAN
<br />PRIOR TO STARTING JOB, CONSULT AREA
<br />CORROSION MECHANIC FOR LOCATING WIRE
<br />INSTALLATION AND CATHODIC PROTECTION
<br />REQUIREMENTS
<br />Installation Tested or Inspected
<br />and Noted on Drawing.
<br />All Corrosion Levels Satisfactory per
<br />PG&E Gas Utility Standard TD -4181S.
<br />/ 0 6
<br />.ss.
<br />w
<br />J 0 B DATA
<br />CITY: STOCKTON
<br />COUNTY: SAN JOAUIN
<br />PLAT: 3005-A1-27
<br />CPA: 3005-15
<br />TBA: X-02
<br />MAOP: 60 PSIG
<br />NOP: 54 PSIG
<br />APD:
<br />EZ: 16 -ST -07-B
<br />CO M Ln CD C0
<br />00 to to O N
<br />N m Cn u")
<br />M N N M M CD
<br />r- I I I I p No
<br />O^ n m N _N O
<br />cm
<br />ej M
<br />J
<br />Q W
<br />� O N
<br />o
<br />Lu � _ O7
<br />Z
<br />o wm L
<br />> N W L o
<br />Z O Y O D N
<br />¢ >62 LI:
<br />D = W Z O
<br />W Q (n Z
<br />z �
<br /><
<br />w
<br />� p
<br />O
<br />U U Q O�
<br />z CD .
<br />Z 0' O =
<br />wowQ ��
<br />o Q C-)
<br />Q CD A
<br />LI
<br />cr z Ln Q LW
<br />�N
<br />CO
<br />CD L_LJ Chi
<br />ED (n
<br />C -D z_
<br />Li CD
<br />CLW
<br />U z
<br />W�
<br />z cn
<br />C/") o
<br />0
<br />U z M o
<br />� o �
<br />Cn U
<br />C � Q V) o
<br />z o LO
<br />LiJ
<br />C) o
<br />0
<br />NC/')
<br />< U
<br />C -D
<br />U
<br />Z
<br />0
<br />2 1 INCH 0
<br />
|