Laserfiche WebLink
m <br />0 <br />A <br />2 � 3 <br />VICINITY MAP <br />a� <br />Y <br />Lovroi y ; a <br />'rr �Funan't <br />� a <br />c <br />G M Sports Salvage � N <br />Au::a parts store <br />Fuita"� PROPOSED LOCATION <br />A <br />m <br />° z <br />m <br />a <br />m 7 0 <br />A � gun` Or <br />q 7 0 £� <br />ro <br />Dale Carnegie Training <br />of the San Joaquin Valley <br />Z <br />N. <br />6t j° <br />ISE <br />� � a <br />µ $Valero v <br />n < <br />P e <br />4 2GL? Zig.gv s Snno.ve Sinop <br />El Gnullense <br />C1 � iytr �!fnl f • .: <br />a <br />Z, <br />e Pie <br />A <br />• h= <br />E Alpine Ave <br />�West Lane P <br />L -A - q Trans' 4e••rnces <br />®rrner <br />1. INSTALL 49' DWA-SD LOCATED ON E STADIUM W/O WEST LN IN STOCKTON PER 0-13.2. <br />2. UTILIZE EXISTING ELECTRIC SERVICE AND AC DISCONNECT SWITCH. INSTALL SECOND NEUTRAL BUS BAR. <br />3. UTILIZE EXISTING 40V/5A POLE MOUNTED RECTIFIER. <br />4. UTILIZE EXISTING WATCHDOG REMOTE MONITORING UNIT. <br />5. INSTALL (2) NEW GROUND RODS IN G-5. FIRST GROUND ROD TO BE INSTALLED AT THE BASE OF THE POLE AND THE SECOND GROUND ROD <br />TO BE INSTALLED A MINIMUM OF 6' FROM THE FIRST GROUND ROD. <br />6. INSTALL (2) #8 CATHODE LEADS TO THE 2" STL GAS MAIN. <br />7. INSTALL ANODE JUNCTION BOX. <br />8. INSTALL NEW P -SHOOTER TO TOP OF AC RISER. <br />9. ANODE WIRES AND NEW CATHODE LEADS TO BE LANDED IN NEW AJB PER GS&S 0-13.2. <br />10. DEACTIVATE THE EXISTING DEEP WELL ANODE LOCATED ON E STADIUM AND WEST LN IN STOCKTON PER COUNTY REQUIREMENTS. <br />11. CITY ENCROACHMENT AND COUNTY WELL PERMIT IS REQUIRED. <br />1. PRIOR TO STARTING WORK, CONTACT LOCAL AREA CORROSION SUPERVISOR REGARDING CATHODIC PROTECTION REQUIREMENTS AND I&R SUPERVISOR REGARDING ANY SHUTDOWN, ABANDONMENT, <br />OR TIE-IN OF ANY MAINS WHICH MAY AFFECT ANY DISTRICT REGULATOR STATION. <br />2, ALL STEEL TIE-INS, CUT OFFS AND CAPPING OF CAST IRON AND STEEL MAIN PER A-36 AND C-37. <br />3. ALL PLASTIC CONNECTIONS TO BE PERFORMED IN ACCORDANCE WITH THE APPROPRIATE PROCEDURES LISTED IN TD -4170S. <br />4. UNLESS OTHERWISE NOTED, CONSTRUCTION TO REFERENCE TD -4125P-09 TO DETERMINE EXISTING STEEL PIPE SPECS. <br />5. ALL ARC WELDING IS TO BE PERFORMED IN ACCORDANCE WITH THE GAS WELDING CONTROL MANUAL TD -4160M. REFER TO TD-416OP-20 FOR GENERAL WELDING REQUIREMENTS. <br />6. PURGE MAINS 10" IN DIAMETER & LESS PER GS&S A-38, ATTACHMENT A, PROCEDURE 2. PURGE MAINS GREATER THAN 10" IN DIAMETER PER GS&S A-38, ATTACHMENT A, PROCEDURE 3. <br />7. ABANDON ALL UNDERGROUND GAS FACILITIES PER UTILITY PROCEDURE TD-950OP-16 & GS&S A-93.2. <br />8. PLACE ELECTRONIC MARKING SYSTEM (EMS) DEVICES ON ALL CUT OFF ENDS AND SECTIONALIZING POINTS OF DEACTIVATED PIPE PER TD-950OP-16. <br />9. FOLLOW ALL MINIMUM INSTALLATION DEPTHS FOR TRANSMISSION, DISTRIBUTION AND SERVICE PIPE BY CLASS LOCATION AND SOIL TYPES OUTLINED IN GS&S A-04. <br />10. ALL GAS RISERS ARE TO BE INSTALLED IN ACCORDANCE WITH GS&S J-15 & J-15.1. <br />11. INSTALL METER PROTECTION PER GS&S J-95. <br />12. VENT REGULATORS PER GS&S H-93. <br />13. LOCATION OF EXISTING UTILITIES ARE APPROXIMATE. CALL UNDERGROUND SERVICES ALERT (USA) TO CONFIRM. GAS PIPELINES MUST BE INSTALLED WITH AT LEAST 3' OF SEPARATION (5' <br />PREFERRED) ON ANY PARALLELED INSTALLATION FROM ANY WET UTILITY AND 12" MINIMUM FROM ANY PERPENDICULAR CROSSING PER U.O. STANDARD S5453. <br />14. CONSTRUCTION SHALL NOTIFY MAPPING WITHIN 24 HOURS OF ALL OPERATIONAL CHANGES TO MAINS, INCLUDING EVERY TIE-IN, CUT OFF, UPRATE, ETC. PER U.O. STANDARD S4412. <br />15. ALL STEEL RISERS ARE TO BE REPLACED WITH NON CORRODIBLE RISERS OR REPLACED BY USING THE RISER INSERT RENEWAL INSTALLATION PER GS&S A-90. <br />16. ALL SERVICES AND MAINS TO BE TESTED PRIOR TO TIE-IN PER GS&S A-34. <br />17. INSTALL PLASTIC MAIN, SERVICES, & LOCATING WIRE PER GS&S A-34, A-90, A-90.2, A-90.3, A-91, A-93, A-93.1, A-93.3, UTILITY STANDARD TD -4170S, D-34 & CORROSION CONTROL <br />STANDARD TD -4181 S. <br />18. INSTALL ANODES PER CORROSION CONTROL MANUAL 0-13.1. <br />19. INSTALL ELECTROLYSIS TEST STATIONS PER CORROSION CONTROL MANUAL 0-10 AND 0-10.1. IF PRACTICAL, INSTALL ETS STATION OUT OF THE ROADWAY. <br />20. ALL EXCAVATION TO BE PERFORMED PER TD -5811M, TD -5811P-301, TD -5811P-105, TD -4412P-05, AND TD -4621S. STANDBY REQUIRED IF EXCAVATING WITHIN 5' OF A CRITICAL FACILITY, <br />BORING ACTIVITY THAT CROSSES OR THAT PARALLELS WITHIN 10' OF A CRITICAL FACILITY. CONTACT THE CONSTRUCTION SUPERVISOR. <br />21. NOTIFY SCHOOLS AND HOSPITALS WITHIN 500' OF PROPOSED EXCAVATION FOR GAS FACILITIES A MINIMUM OF 3 DAYS PRIOR TO DIGGING PER AB 1937. <br />22. ANY PIPE REPLACEMENT VIA SPLITTING TO BE DONE PER TD -4634P-01 & TD -4634P-02. <br />23. CAMERA INSPECTION (PRE/POST) FOR TRENCHLESS METHODS TO BE PERFORMED PER TD -4632P-01. <br />24. WARNING TAPE IS TO BE INSTALLED IN OPEN TRENCH INSTALLATION OVER GAS PIPELINES IN BOTH TRANSMISSION AND DISTRIBUTION FACILITIES. THIS INCLUDES BELL HOLES, EXCAVATIONS FOR <br />REPAIR PURPOSES AND RISER REPLACEMENTS PER GS&S L-16. <br />25. DEVIATIONS FROM THIS APPROVED DESIGN SHALL BE PROCESSED IN ACCORDANCE WITH TD -4014P-05 "FIELD DESIGN CHANGE PROCESS FOR DISTRIBUTION LINES AND DUAL -ASSET FACILITIES." <br />26. ALL TRENCH SPOILS AND BACKFILL MUST BE USED OR DISPOSED WITH AS REQUIRED BY PG&E SPECIFICATIONS AND ANY LOCAL CITY, COUNTY OR STATE REQUIREMENTS. <br />27. PG&E TO INSTALL/RESTORE TEMPORARY AND/OR PERMANENT PAVING IN ACCORDANCE WITH PG&E SPECIFICATIONS AND ANY LOCAL CITY, COUNTY OR STATE REQUIREMENTS. <br />28. STAND-BY REQUIREMENTS MUST BE IN ACCORDANCE WITH TD -5811P-301, TD -5811P-105 & TD -5811B-005 WITH WORKING NEAR ANY CRITICAL FACILITIES. <br />29. MONUMENT PRESERVATION AS REQUIRED BY THE PROFESSIONAL LAND SURVEYORS' ACT (BUSINESS AND PROFESSION CODE SUB -SECTION 8700-8805) SECTION 8771; PRIOR TO THE START OF <br />CONSTRUCTION, ALL SURVEY MONUMENTS, WITHIN THE PROJECT LIMITS THAT HAVE THE POSSIBILITY OF BEING DAMAGED OR DESTROYED DURING CONSTRUCTION, MUST BE LOCATED, AND <br />REFERENCED BY A LICENSED LAND SURVEYOR, AND A CORNER OF RECORD OR RECORD OF SURVEY SHALL BE FILED WITH THE COUNTY SURVEYOR. IF ANY OF THESE SURVEY MONUMENTS ARE <br />DESTROYED, DAMAGED OR COVERED OVER DURING CONSTRUCTION, A NEW MONUMENT AND MONUMENT BOX MUST THEN BE SET IN ITS PLACE, AT THE ORIGINAL LOCATION, BY A LICENSED <br />LAND SURVEYOR, AND ANOTHER CORNER OF RECORD OR RECORD OF SURVEY FILED WITH THE COUNTY SURVEYOR. <br />30. CONSTRUCTION MEANS AND METHODS MAY DEVIATE PER FIELD VERIFIED CONDITIONS IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS. IF THERE ARE ANY QUESTIONS, CONTACT <br />RESPONSIBLE ENGINEER. <br />49 D111111111111VA SID INSTALLATION <br />E STADIUM DR & WEST LN <br />STOCKTON, CA <br />PLAN VIEW <br />v j <br />\ \ 6 y <br />v <br />crt <br />r � <br />161g� \\ � \\ sl`" FIG/OR X60'1 <br />S� PQ�UM / Np STIED <br />�12\\ slW <br />FIG <br />P f <br />/ FIG Ne BI`N <br />NAP / <br />FIG <br />DIF <br />/ RP MPORE / NQ �1p <br />�S\�R NP1a'19'�9 r/ Fcar� <br />_ Z . <br />�\EO <br />e I`N <br />Flc 11' <br />Ns \ <br />D� cD <br />• t� <br />t J \ A \vl ,QBE 12�1� <br />A <br />g <br />�^ SCALE:1 ":20' <br />8 � 9 <br />FIP EXISTING GAS MAIN (SIZE NOTED) <br />- - - - - - - GROUND WIRES (INSTALL) <br />- - - - - ANODE WIRES (INSTALL) <br />- - - CATHODE WIRES (INSTALL) <br />GAS SERVICE (EXISTING) <br />PROPERTY LINE (EXISTING) <br />a/w BACK OF WALK (EXISTING) <br />F/C FACE OF CURB (EXISTING) <br />- - RIGHT OF WAY (EXISTING) <br />i DEEP WELL ANODE (INSTALL) <br />GROUND ROD (INSTALL) <br />0 DEEP WELL ANODE (EXISTING) <br />T RECTIFIER (EXISTING) <br />PG&E POLE (EXISTING) <br />® VALVE (EXISTING) <br />PHONELOCAL CONTACT INFO: <br />CELL <br />MICHAEL GUAJARDO CORROSION MECHANIC (209) 985-8329 <br />iCORROSION O• (925) 383-6468 <br />CORROSION i <br />SENIOR i(650) 773-9234 <br />DISTRIBLITION a 658-0845 <br />i.PLANNING ENGINEER 0. 942-1626 <br />�• 0579-6389 <br />(707) 296-4343WORKINGO• <br />GC FIELD ENGINEER <br />NOTIFIED U.S.A. <br />DATE: <br />TICKET # <br />BY: <br />CATHODIC PROTECTION IN WORK AREA <br />ATTENTION FOREMAN: <br />NOTIFY THE CORROSION DEPT. AT <br />(925) 383-6468, 48 HOURS PRIOR TO <br />START OF WORK. <br />ATTENTION FOREMAN <br />PRIOR TO STARTING JOB, CONSULT AREA <br />CORROSION MECHANIC FOR LOCATING WIRE <br />INSTALLATION AND CATHODIC PROTECTION <br />REQUIREMENTS <br />Installation Tested or Inspected <br />and Noted on Drawing. <br />All Corrosion Levels Satisfactory per <br />PG&E Gas Utility Standard TD -4181S. <br />/ 0 6 <br />.ss. <br />w <br />J 0 B DATA <br />CITY: STOCKTON <br />COUNTY: SAN JOAUIN <br />PLAT: 3005-A1-27 <br />CPA: 3005-15 <br />TBA: X-02 <br />MAOP: 60 PSIG <br />NOP: 54 PSIG <br />APD: <br />EZ: 16 -ST -07-B <br />CO M Ln CD C0 <br />00 to to O N <br />N m Cn u") <br />M N N M M CD <br />r- I I I I p No <br />O^ n m N _N O <br />cm <br />ej M <br />J <br />Q W <br />� O N <br />o <br />Lu � _ O7 <br />Z <br />o wm L <br />> N W L o <br />Z O Y O D N <br />¢ >62 LI: <br />D = W Z O <br />W Q (n Z <br />z � <br />< <br />w <br />� p <br />O <br />U U Q O� <br />z CD . <br />Z 0' O = <br />wowQ �� <br />o Q C-) <br />Q CD A <br />LI <br />cr z Ln Q LW <br />�N <br />CO <br />CD L_LJ Chi <br />ED (n <br />C -D z_ <br />Li CD <br />CLW <br />U z <br />W� <br />z cn <br />C/") o <br />0 <br />U z M o <br />� o � <br />Cn U <br />C � Q V) o <br />z o LO <br />LiJ <br />C) o <br />0 <br />NC/') <br />< U <br />C -D <br />U <br />Z <br />0 <br />2 1 INCH 0 <br />