SC RLE.'
<br />TEMPORARY FIRE TURNAROUND
<br />SEPTIC PITS AND LEACH FIELDS (TYPICAL)
<br />\ 1
<br />(90-7
<br />9'D0VBZE SR76
<br />IN; T,911 694t Lf - 6'CRAIN
<br />IIN/f ffNCf W1 ulg5r/C SL97S
<br />� /B' DOUBLE- GA7E.
<br />I
<br />Pf1T/fR RDRp
<br />u�
<br />W
<br />1, P
<br />LCW PO!N7
<br />T I.
<br />TRAFFIC INDEX
<br />t1 P
<br />W
<br />NISN P01/V7
<br />�
<br />RADIUS
<br />e
<br />W
<br />9CRMP0
<br />RDR1
<br />A
<br />`k
<br />O
<br />LENGTH
<br />"e
<br />s�rE
<br />DR 9/N,OSE 51010E
<br />A
<br />o
<br />�i
<br />6URV15V A10NOMEN7 BOX
<br />E.P
<br />3
<br />Q
<br />f7RFE7 1/GN7 (,1prrvr
<br />WOoDBR1DGE RDRD
<br />FINISH GRADE
<br />V ICINITY MAP
<br />Na 4 CAL E
<br />R/W
<br />ZS D'
<br />. .f.
<br />DRRINRGF Z5'
<br />fasI-MFNr
<br />5 4 /d
<br />7 S'
<br />101' 3
<br />0
<br />l e' ,N Z D. F.
<br />10'PUE dD.E,
<br />BENCHMARK DATUM:
<br />SAN JOAQUIN COUNTY BENCH MARK
<br />TU -08.2 E634i ELEV.�46.30
<br />LOCATED: 2 MILES SOUTH OF PELTIER
<br />ROAD AND 35'EASTOFRAIL
<br />ROAD ON CONC POST.
<br />CONST. BENCH MARK
<br />TOP OF FIRE HYDRANT 9 SYCAMORE
<br />4 CENTER STREET. ELEV.' 53.08
<br />16' . 41 . 5'
<br />R/W
<br />/0'
<br />r ,
<br />7777
<br />2Yo 8/,
<br />y- -_ �-+-DIICy SECTION
<br />1 L �1 lYD. BOTH $IDE$
<br />For Pr1me Coat e Coat
<br />See Section 36$99 /l0. 2,C-7y�oe`4 1/2"IVOX. qqy.
<br />of project 5pecifi'cation A.B.- -CI-Y 3/411 Agg
<br />�i 5ection 93 of State -0.67'957. R.C. CompactedOr/gynq/Grouna,
<br />Stgndard 5peciflcation.5,s �, r U R A L S E C T/ O N
<br />9 YCRAt? ORf 6tR1El
<br />KEY MAP
<br />Note: Sewage pits and leach systems shall be
<br />constructed under a separate permit and
<br />inspection by the Environmental Health
<br />Division.
<br />1 L=6&IVD
<br />1, P
<br />LCW PO!N7
<br />T I.
<br />TRAFFIC INDEX
<br />t1 P
<br />NISN P01/V7
<br />R
<br />RADIUS
<br />57REE7 SIGN
<br />A
<br />DELTA
<br />LENGTH
<br />--
<br />�
<br />DR 9/N,OSE 51010E
<br />PR.C.
<br />R
<br />POINT OF REVERSE CURVE
<br />�i
<br />6URV15V A10NOMEN7 BOX
<br />E.P
<br />EDGE OF PAVEMENT
<br />f7RFE7 1/GN7 (,1prrvr
<br />F.(,
<br />FINISH GRADE
<br />9C
<br />BEGIN CURVE
<br />J P.
<br />JOINT POLE
<br />E C
<br />END CURVE
<br />M P
<br />MID POINT
<br />G.B
<br />GRADE BREAK
<br />D. b.
<br />DRP/N46,r EASENIFNr
<br />L.F
<br />LINEAL FEET
<br />P U.E.
<br />PUBLIC UTILITY EASEMENT
<br />R/yv
<br />RIGHT OF WAY
<br />�>
<br />CENTERLINE
<br />(�
<br />FLOWLINE
<br />Inv.
<br />INVERT
<br />Ex.OrExlst
<br />EXISTING
<br />{�
<br />PROPERTY LINE
<br />C.
<br />ASPHALT CONCRETE
<br />d B.
<br />AGGREGATE BASE
<br />R
<br />RELATIVE COMPACTION
<br />LOCATION OF R -VALUE TEST
<br />RV -1 -1
<br />ApPRovE40
<br />8y
<br />I �.� �.0 �' A•� 4 n 1 to% t 71
<br />5RN JOAODIN COUNTY FIRE WARPrN DATE
<br />!0)9\00TH COUNTY LAff HEALTH Pet DATE
<br />(E. I- TJ,y.) T'oblia Seg cer
<br />0 /y
<br />i' Iff Z�POBRIbG4/%f1RE P1$TRIC1-
<br />RTE
<br />sRZ:467 /NDFx
<br />IQ-XFY 5PEF7" -- DfVf10,011?,rNr ALAN
<br />2�--
<br />PLON e AR Of / L b
<br />(D - DF r,4I Z SIIEF i'
<br />(4 -- ORAD/N6 PLAN_- DE1/FZ0PMFNr PIAN
<br />s£RV/CLrs
<br />57RffT L/GNIS rollWr SUv10E ARfR
<br />SEWAGE PR/VATE SEPTIC
<br />NATURAL 649 f fLfCTR/C P.6.� E
<br />lfLfV/$/ON [ABLE LOb/ CABLE TV
<br />IELEAAONf PRC/fle BELL
<br />WATER fCRMPO MAINTENANCE 015TR/C7
<br />$IORM ORA/NAGE C011N71 SERVICE RRER
<br />CONSTRUCTION STAKING LIABILITY WAIVER
<br />These improvement plans have been prepared with the
<br />intent that the firm of Baumbach & Piazza, Inc. will be
<br />performing the construction staking for the complete
<br />project. If, however, another engineering and/or
<br />surveying firm should be employed to use these plans for
<br />the purpose of construction staking, notice is hereby
<br />given that the firm of Baumbach & Piazza, Inc. will not
<br />assume any responsibility for errors or omissions, if
<br />any, which might occur and which could have been avoided,
<br />corrected or mitigated if Baumbach & Piazza, Inc. had
<br />performed the staking work.
<br />G f NfRRL NOTZ9
<br />1. All work shall conform to these plays and any special provisions for
<br />this project.
<br />2. Refer to the final map of this subdivision for all center line and
<br />property line data.
<br />3. The street light system shall be installed by Pacific Gas & Electric
<br />Company.
<br />4. Contractor shall receive an approved set of plans and specifications
<br />prior to beginning construction.
<br />5. Baumbach & Piazza (Engineer) shall set all survey controls and
<br />construction stakes necessary for completion of work. The Contractor
<br />shall be responsible for the preservation of all survey and
<br />construction stakes. Survey and construction stakes that are lost or
<br />destroyed due to Contractor's negligence will be set by the Engineer
<br />at the Contractor's expense.
<br />6. The existing underground utilities were plotted from available
<br />records. The Contractor sahll be responsible for contacting all
<br />utility agencies to mark their facilities in the field before any
<br />excavation. The Contractor shall notify and co-ordinate all work
<br />with any agency requiring removal or relocation of their utilities.
<br />Pacific Bell, P. G. & E., Lodi Cable T. V., and Acampo Maintenance
<br />District.
<br />7. All underground utilities within the street area, including gas,
<br />telephone,and electrical lines shall be installed prior to paving.
<br />8. All water lines shall have a minimum cover of 30" below the
<br />structural section.
<br />9. Water used in any phase of construction, such as backfill compaction,
<br />dust control, testing or other work herein required, shall be
<br />included in the unit price or lump sum bid for the respective item of
<br />construction.
<br />10. Contractor shall give Engineer a minimum of 4e hours notification
<br />prior to staking any utilities.
<br />11. Lot grading shall be completed before starting any underground
<br />construction. Refer to attached grading plan.
<br />12. Contractor shall be responsible for notifying and co-ordinating all
<br />work with any agency requiring removal or relocation of utilities,
<br />such as Pacific Bell, P. G. & E., etc.
<br />13. All off-site water lines shall be pressure tested, disinfected,
<br />flushed and tested for bacteria in conformance with the San Joaquin
<br />county Helath Code Requirements prior to connecting to existing water
<br />line.
<br />14. Contractor shall visit site prior to bidding. Specifications are a
<br />separate document.
<br />15. New traffic striping and the restoration of any damaged existing
<br />painted legends or signs is the responsibility of the Contractor and
<br />shall be included in his bid price.
<br />16. All work will be required to be inspected by the Department of Public
<br />Works. They shall be notified not less than 24 hours in advance of
<br />commencement of work.
<br />17. It is agreed that field conditions may require changes to these
<br />plans. It is further agreed that the Director of Public Works may
<br />require changes, alterations or additions to these plans, when the
<br />Director deems them to be necessary or desirable for the proper
<br />completion of the work, provided that such changes, alterations or
<br />additions shall not exceed 10% of the original estimate of the cost
<br />for the improvements without prior approval of the surety.
<br />18. Fire hydrant bid shall include the following: Tee, b" Lateral, 6"
<br />Valve and complete fire hydrant assembly.
<br />19. Prior to performing any work in existing Sycamore Street, the
<br />Contractor shall obtain an Encroachment Permit from the San Joaquin
<br />County Department of Public Works.
<br />20. Contractor shall notify the Acampo Maintenance District for approval
<br />prior to connecting water line to existing water main.
<br />21. Contractor shall obtain a grading permit from the San Joaquin County
<br />Building Division to be reimbursed by the Owner.
<br />22. Pipe type and strengths allowed for underground utilities, unless
<br />otherwise specified on plans, are as follows: Water (W) - PVC, Cl.
<br />150 or greater per AWWA Std. C-900 or ACP., Cl. 150 or greater per
<br />ASTM C296, Type II.
<br />23. All traffic signs and markings shall conform to San Joaquin County
<br />Standards and to the "Manual of Uniform Traffic Control Devices".
<br />24. Any changes to the approved Improvement Plans and Specifications must
<br />be prepared and certified by the "Civil Engineer" and shall be
<br />approved by the "Director" prior to implementation.
<br />25. Install a reflective, blue marker near center line of street to
<br />denote the fire hydrant location.
<br />26. Contractor agrees that he shall assume sole and complete
<br />responsibility for job site conditions during the course of
<br />construction of this project, including safety of all persons and
<br />property; that this requirement shall apply continuously and not be
<br />limited to normal working hours; and that the contractor shall
<br />defend, indemnify and hold harmless, the County of San Joaquin, its
<br />elected officials, officers, employees, and agents from any and all
<br />claims, costs of litigation, damages, and attorney's fees, for
<br />personal injury or property damage of whatever nature which are
<br />claimed to have occurred during the term of this project.
<br />27. The owner shall have compactions tests taken for street subgrade,
<br />utility trenches and lot fill. Any required retests will be at the
<br />contractor's expense. Contractor shall call for the tests and submit
<br />the results to the engineer and County as soon as possible.
<br />N0. I DATE REVISIONS BY I DESIGN ✓`EP DRAWN BY APPROVED BY: Henry M. Hirata RCI: NO. 21258 B A U M B A C H & P 1 A Z Z ASHEET O OF 4
<br />Lpui f er,
<br />I�EY MAP ANS A CAMPO VILLAGE
<br />/Z 199 CIVIL ENGINEERS JOB NO. 89107-2
<br />SURVEYORS D f VELDpM ENT �L.AIy
<br />APPROVED BY 9323 W. 5240 EL PH . LODI B BLIT. SUBDIVISION IMPROVEMENTS FILE G- 954
<br />R.C.E. �Z76'f DATE /O ' RT'� SAN OAQUIN IRF.0 OR OF PUBLIC IYORKS NO.
<br />
|