Garden Acres Streets Resurfacing 2022-2023
Limits
Bird Avenue: Main Street to 400' of Tallahatchey Drive Flower Street: Main Street to North End Walker Lane: Horner Avenue to Washington Street Washington Street: Walker Lane to Cardinal Avenue
Year
2023
Project Engineer
A. Felix
Roads Worked
Bird Ave., Flower St., Walker Ln., Washington St.
Red Lines
Yes
Project #
222220
Districts
District 1
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7722 - SP7730
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES: <br />1. 0.17' HMA Overlay must be placed in one (1) layer. <br />2. Placement of HMA Overlay must not begin until the HMA used in Pavement Repair has been in place for a minimum of 18 hours. <br />3. Placement of HMA Driveways must not begin until the HMA used for Mainline Paving has been completed. <br />4. Existing highway and utility facilities must remain in place unless otherwise noted. <br />5. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in place unless otherwise noted. <br />6. Existing drainage facilities must remain in place unless otherwise noted. The Contractor must conduct earthwork operations so as not to modify or obstruct the existing drainage. <br />7. All Earthwork, except for final shoulder grading, must be completed prior to placing the final layer of HMA Pavement. No Shoulder Backing material will be deposited or drifted onto <br />the final layer of HMA surfacing. Where the shoulder placement exceeds 0.50' in thickness, the Shoulder Backing must be placed in two (2) or more fully compacted Iayers.Hand <br />grinding of roadway surfacing will be required at locations where existing highway and utility facilities are within the Cold Plane Pavement and Pavement Repair limits. Payment for <br />hand grinding will be considered as included in the contract unit price paid for Cold Plane Pavement. <br />8. Shoulder Backing material at all intersection radii must receive Penetration Treatment at 0.25 gallon/square yard. Limits of the Penetration Treatment work must be confined to <br />intersection radii plus fifty feet (50') in each direction or to the intersection conform. <br />9. The Contractor will be responsible for adequately scheduling inspection and testing of all facilities constructed under this contract with a minimum 24—hour notice to the County. All <br />testing must conform to the Standard Specifications. All re—testing will be paid by the Contractor. <br />10.The Contractor must exercise due to caution and carefully preserve survey bench marks, control points, reference points and all survey stakes, and must bear all expenses for <br />replacement and/or errors caused by their unnecessary loss or disturbance. <br />ll.Prior to commencing any work, it will be the Contractor's responsibility to have each utility company locate in the field their main service lines and laterals. The Contractor must <br />notify members of the Underground Service Agency (USA) 48 hours in advance of performing excavation work by calling the toll free number (1-800-642-2444) or 81 1. <br />12. The Contractor must field verify all existing highway and utility facilities' locations and depths. It will be the Contractor's sole responsibility to locate and protect all existing highway <br />and utility facilities, so that no damage results to them during the performance of this contract. The Contractor will be required to cooperate with other contractors and utility <br />companies installing new structures, utilities and services to the project. Payment for this work will be considered to be included in the various items of work involved. <br />13.Removal of existing HMA Speed Cushion on Bird Avenue to be paid under the Cold Plane Pavement item of work. Placement of HMA Speed Cushion to be paid under the Hot Mix <br />Asphalt (Type A) order of work. <br />.,! <br />RECORD DRAWING <br />JD <br />By ._ <br />Nor <br />Chatkmnges <br />M <br />oats _ <br />Any Person Using This Drawing Should Verity <br />411. Information By Inspeeting. The Site Of Work <br />r <br />M <br />o <br />COUNTY OF SAN JOAQUIN <br />NO SCALE <br />GENERAL NOTES <br />GARDEN ACRES STREETS RESURFACING 2022-2023 <br />( Bird Avenue, Flower Street, Walker Lane, Washington Street) <br />Sheet No. <br />2 of 9 <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED <br />DATE <br />A.FELIX 05/2023 //� I�� 5/11/23 <br />5/11/23 <br />