My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2024_PS-2401001 thru PS-2401500_ - PS-2401102
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2024
>
PS-2401001 thru PS-2401500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2024_PS-2401001 thru PS-2401500_ - PS-2401102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2024 9:41:34 AM
Creation date
4/11/2024 9:40:58 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2401102
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1810 East Hazelton Avenue | Stockton, California 95205 | T 209 468 3000 | F 209 468 2999 <br />Follow us on Facebook @ PublicWorksSJC Visit our website: www.sjgov.org/pubworks <br />Department of Public Works <br />Fritz Buchman, Director <br />Alex Chetley, Deputy Director – Development <br />Kristi Rhea, Deputy Director - Administration <br />David Tolliver,Deputy Director - Operations <br /> Najee Zarif, Deputy Director - Engineering <br />Acknowledg ment of Monument Preservation <br />I, _________________________, a duly Licensed Land Surveyor or a Professional Engineer <br /> (Please print) <br />authorized to perform Land Surveying in the State of California, Registration No.____________, <br />hereby acknowledge and accept all responsibility for the monument preservation as required <br />per Section 8771(a-f) of the Business and Professions Code within the bounds of the <br />construction activity permitted by San Joaquin County Permit No._____________. <br />I further acknowledge that I am hereby responsible for the Acknowledgement of Monument <br />Preservation prior to final acceptance of the construction activity. <br />Seal <br />Survey Monuments Found – Post Acknowledg ment/ <br />Corner Record to follow. <br />Date <br />PS-MONUMENT PRESERVATION <br />No Survey Monument Found.
The URL can be used to link to this page
Your browser does not support the video tag.