Laserfiche WebLink
A <br />0-4 <br />2— <br />3 - <br />i <br />A5 <br />VICINITY MAP AND PIPELINE ALIGNMENT <br />SCALE: I" APPROX. 10001 <br />may. DESCRIPTION I SUB. I APPR. I DATE <br />p REFER TO TRACING FOR LATEST REVISION <br />ITLui11. inc. B <br />A <br />..i.i.is• _. -i -f[+HNin oa[os <br />REFERENCE INFORMATION AND NOTES: <br />C <br />A <br />LIST OF DRAWINGS <br />E <br />F <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />INTERCEPTOR - SEWER PROJECT C-06-0946 <br />SAN JOAQUIN COUNTY GENERAL HOSPITAL <br />G-1 PIPELINE ALIGNMENT - VICINITY MAP - LIST OF DRAWINGS <br />G-2 NOTES - LEGENDS - ABBREVIATION <br />G-3 PUMP STATION SITE PLAN <br />G-4 DEMOLITION PLAN - EXISTING PLANT <br />A-1 FLOOR PLANS <br />A-2 ROOF PLAN & REFLECTED CEILING PLAN <br />A-3 EXTERIOR ELEVATIONS <br />A-4 BUILDING SECTIONS & DETAILS <br />A-5 DOOR SCHEDULE'& MISCELLANEOUS DETAILS <br />S-1 FLOOR PLANS <br />S-2 ROOF FRAMING PLAN & DETAILS <br />5-3 SECTION & DETAILS - <br />S -4 SECTIONS & DETAILS <br />S--5 STAIR SECTIONS &.DETAILS <br />5-6 SLAB & BEAM SCH`LDULES & TYPICAL DETAILS <br />S-7 GENERAL NOTES & TYPICAL DETAILS <br />S-8 TYPICA! [7FTAILS <br />5-9 SECTIONS AND DETAILS <br />5-10 BRIDGE TRANSITION STRUCTURE <br />',1ECHANICAL AiaD PIPING - PLANS <br />M-2 MECHANICAL AND PIPING - SECTIONS <br />M-3 MECHANICAL AND PIPING - SCHEMATICS <br />M--4 MECHANICAL AND PIPING — DETAILS <br />M--5 HYDROGEN PEROXIDE AND CARBON ADSORPTION SYSTEMS - PLAN <br />M-6 HYDROGEN PEROXIDE AND CARBON ADSORPTION SYSTEM - DETAILS <br />JM -7 HYDROGEN PERO:%IDE AND CARBON ADSORPTION SYSTEM - DETAILS <br />M_8 VENTILATION - PL5,N <br />M-9 VENTILATION - SECTIONS AND DETAILS <br />M-10 BRIDGE TRANSITION STRUCTURE <br />M-11 BRIDGE TRANSITION STRUCTURE <br />M-12 BRIDGE CROSSING <br />E-1 LEGEND] -- ABBREVIATIONS - NOTES <br />E-2 SITx• PLAID! <br />E-3 LIGHTING PLANS <br />E-4 PO1,-1ER PLANS <br />E-5 SINGLE LINE DIArRAMS AND SCHEDULES <br />E-6 DIAGRAMS <br />E-7 DIAGRAMS <br />E-8 EQUIPMENT ELEVATIONS <br />P -i. FORCE MAIN - NORTH END TO STA. 9+00 <br />P-2 FORCE MAIN - STA. 9+00 TO STA. 20+00 <br />P_3 FORCE MAIN - STA. 20+00 TO STA. 31+00 <br />P-4 FORCE !MAIN - STA. 31+00 TO STA. 41+00 <br />P-5. FORCE MAIN - STA. 41+00 TO STA. 51+00 <br />P-6 FORCE 'MAIN - STA. 51+00 TO STA. 60+00 <br />P-7 FORCE MAIN - STA. 60+00 TO STA. 70+00 <br />P-8 FORCE MAIN - STA. 70+00 TO STA, 80+00 <br />P-9 FORCE MAIN - STA. 80+00 TO STA_ 39+70 <br />P-io FORCE MAIN - STA. 89+70 TO STA. 101+00 <br />P-11 FORCE MAIN - STA. 101+00 TO STA. 109+04 <br />P-12 FORCE .MAIN - STA. 109+04 TO STA. 119+40 <br />P-13 FORCE MAIN - STA. 119+40 TO STA. 127+00 <br />P-14 FORCE MAIN - STA. 127+00 TO STA. 139+00 <br />P-15 FORCE MAIN STA. 139+00 TO STA. 150+50 <br />P-16 FORCE MAIN - STA. 150+50 TO PUMP STATION <br />HOSPITAL COMPLEX GRAVITY SEWER <br />STA. 1+00 TO PUMP STATION <br />P-17 PIPELINE DETAILS <br />P-19 PIPELINE DETAILS <br />P-19 PIPELINE DETAILS <br />JF -1 JAIL FARM INTERCEPTO^ - GRAVITY SEDER <br />STA. 1+00 TO STA. 12+21 <br />0 <br />DESIGNED <br />1 (-1 <br />DRAWN <br />PC4IC5 <br />CHECKED <br />DATE <br />8- I,�-77 <br />L <br />Pipe Type Summary: Listed is a pipe type summary. Refer to the <br />detailed Specifications <br />for pipe application and detailed material and <br />installation requirements. <br />T.D.P. - <br />Vitrified Clay, bell and spigot plastic joints. <br />T.F.P. - <br />Helical galvanized corrugated steel pipe. <br />Bituminous lined and coated. <br />T.T-l.P. - <br />Asbestos cement sewer pipe, neo?rene gasket. <br />T.N-4.P. - <br />Cast iron soil pipe, no -hub and bell and spi;ot <br />depending on application. <br />T.N_7,p, - <br />Cast ductile iron, flanged or grooved end. <br />Pressure pipe. <br />T.T-1.P. - <br />Copner, type I„ K, or DWTV depending on alp, kation. <br />T.U.P. - <br />PolyethelPne tubing, single and multi -tube bundles. <br />T.V-1.P. - <br />Schedule 40 PVC, solvent weld. <br />T.V-4.P. -- <br />PVC gravity sewer, rubber gasket, bell and spigot. <br />T. v-5. P. - <br />PVC pressure pipe, Class 150 with be 11 and spi;ot <br />Joints. AIA4A C-900. <br />.,•1 <br />T.W-l.p. - <br />Stainless steel pipe. Schedule 10. <br />T.X.P. - <br />Seamless Schedule 40 black steel. <br />T.Y_I.P. - <br />Galvanized steel, Schedule 40, w/malleable iron <br />fittings. <br />T.Y-2,P, - <br />Galvanized steel, Schedule 40, w/galvanized cast <br />iron drainage fi.ttin,rs. <br />T.Z9_1,p, - <br />Aluminum tubing, butt welded. <br />` T.ZB-?.P. - <br />Aluminum tubing, single and multi -tube bundles. <br />Diameter <br />Pipe 5 stem (Abbreviations) Buried Service _ -T _ Exposed Service - <br />Submerged Service <br />Air (A) <br />T.T-l.P. T.T-1.n. (T.U.P.) <br />T.V-1.P. <br />Sewage - Gravity (S) <br />T.D.1'., T.1 -1.P. or T.V-4.P. ---- <br />---- <br />Sewage - Force Iain <br />(FM) T.V-5.P. <br />Sewage - Pump Suction & <br />Discharge <br />(S) T.N-7.P. T.N-7.:'. <br />i.N-7.P. <br />Domestic Sewage (S) <br />T.N-4.:'. T.N-4.P. <br />T.N-7. P. <br />Drains (D) <br />T.N-4.P. T.N-4.P. <br />T.N-7.P. <br />Vents (V) <br />---- T.Y-2.P. T.N-4.P. <br />---- <br />Hydrogen Peroxide (H2O2) T.ZB-2.P. T.ZB-1.P. <br />Domestic Cold Water <br />(DW) T.T-l.P. or T.V-l.P. T.T-1.P. or T.Y-l.P. <br />-`�- <br />Domestic Hot Water <br />01114 T.T-1.P. T.T-l.P. <br />Air Gap Water (AGW) <br />T.T-1.P. or T.V-1.P. T.T-1.P. or T_V-1.P. <br />---" <br />Bubbler (BA) <br />---- T.U.P. & T.V-1.''. <br />T.V-1.P. <br />F11E"l Oil (FO) <br />T.X.P. If. X. P. <br />---- <br />SAN JOAQUIN COUNTY, CALIFORNIA <br />KENNEDY ENGINEERS, INC. <br />SUBMITTED-. <br />If Ci.L°-c Y <br />E <br />APPROVED - <br />SAN FRANCISCO <br />F <br />SAN JOAQUIN COUNTY GENERAL HOSPITAL <br />INTERCEPTOR PROJECT <br />PIPELINE ALIGNMENT <br />VICINITY MAP <br />LIST OF DRAWINGS <br />SCALE <br />JOR NO. <br />7344 <br />SHEET�.� <br />4s <br />L <br />