Laserfiche WebLink
i , <br />I <br />I <br />L <br />3r <br />with slope <br />5' Min 5' Min �1 <br />i , <br />I <br />-------H — A Grout smooth all edges of pipe opening <br />Cost Iron Frame and Cover - refer <br />4" __ W,re rrieS.h <br />-- — <br />6. 6 to ' Top of pavement grade to Standard Drawing No. cW this sheet �----- <br />2 . 8 <br />�_� 1 ' -------- -- - - S Rebars (typical) <br />Mortar �1( I k\ TA <br />--- <br />SECTION A -A <br />Wire mesh , <br />2' '. <br />Precast reinforced concrete c; - - <br />rde adjustment rings <br />3", 4, & 8" sections /\ <br />as required <br />Precast reinforced <br />concrete cone " <br />All joints mortared and 2 -0 -1 <br />bonded with mortar on Diam. <br />Stone <br />both interior and I - <br />exterior surfaces - ir- "�-----^-�"--`---------�- _ —'- • • <br />5" Min <br />Precast reinforced manhole, _ I MRrracclnl <br />1 -0" 3' ASTM C478, adjust to <br />SECTION Q- Q Min. proper elevation. 1 ',2',3', &, - <br />• r-- -----------------= I 3' Opening (See Note No 3) P p - Patterson <br />—� _6• 4' sections as required) o I <br />A > A o I <br />PLAN VIEW Diam. - <br />B A FRONT VIEW 4' Dio. Note: _ Architecture <br />Standard storm drain manhole Eccentric cones shall be r - -=-_ -- <br />..__________J_ ____.___._-_--__.-__-______---- refer to Standard Drawing used where specified on liar n <br />i Pl4n Ing <br />the `ans. _` Interior Architecture <br />i 3' dia. COW*///1o, /G of &i/s s�ztti` 4' Dio. p .:--__-- <br />' � I or s Joints may be either keyed _ <br />q Grout to Foundation or tongue and groove •} Lowest <br />"------- Dio. of PLAN VIE W <br />t, <br />Construct cut-off 'r -_---, �- -- �2,. � 3. P�Pe 4"--� �•-- <br />i One Market Plaza <br />wall around the H <br />entire perimeter <br />3" <br />on for <br />r <br />---- class "a" concrete r Spear Street Tower <br />1 I base. Pre -cost base <br />C Toe of ; ; _used Suite 400 <br />' �channel slope C I - by may <br />eeD Director ofPPublic d Works <br />.�------- -- ----- -�-------------------------- _ ELEVATION <br />San Francisco <br />�= " ..- - — zo --- CA 94105 <br />B TOP VIEW A 6 Class B Concrete --- %� -:f. " NOTE A 1'-6" concrete cone may be used if approved by the Director j" If- 1 1/4" I 3 <br />/ of Public Works 1 f /4 IL 1 �8" <br />--- <br />Miter cut pipe --min-1--- <br />to fit flus <br />I <br />L <br />Tr <br />with slope <br />5' Min 5' Min �1 <br />Std. Frame & Cover » 1 1/4 <br />O <br />k <br />Mortar 1 Clear -1 3�8" 2 <br />, <br />�- 5�8„ <br />I I i <br />-------H — A Grout smooth all edges of pipe opening <br />Cost Iron Frame and Cover - refer <br />4" __ W,re rrieS.h <br />-- — <br />6. 6 to ' Top of pavement grade to Standard Drawing No. cW this sheet �----- <br />2 . 8 <br />�_� 1 ' -------- -- - - S Rebars (typical) <br />Mortar �1( I k\ TA <br />--- <br />SECTION A -A <br />Wire mesh , <br />2' '. <br />Precast reinforced concrete c; - - <br />rde adjustment rings <br />3", 4, & 8" sections /\ <br />as required <br />Precast reinforced <br />concrete cone " <br />All joints mortared and 2 -0 -1 <br />bonded with mortar on Diam. <br />Stone <br />both interior and I - <br />exterior surfaces - ir- "�-----^-�"--`---------�- _ —'- • • <br />5" Min <br />Precast reinforced manhole, _ I MRrracclnl <br />1 -0" 3' ASTM C478, adjust to <br />SECTION Q- Q Min. proper elevation. 1 ',2',3', &, - <br />• r-- -----------------= I 3' Opening (See Note No 3) P p - Patterson <br />—� _6• 4' sections as required) o I <br />A > A o I <br />PLAN VIEW Diam. - <br />B A FRONT VIEW 4' Dio. Note: _ Architecture <br />Standard storm drain manhole Eccentric cones shall be r - -=-_ -- <br />..__________J_ ____.___._-_--__.-__-______---- refer to Standard Drawing used where specified on liar n <br />i Pl4n Ing <br />the `ans. _` Interior Architecture <br />i 3' dia. COW*///1o, /G of &i/s s�ztti` 4' Dio. p .:--__-- <br />' � I or s Joints may be either keyed _ <br />q Grout to Foundation or tongue and groove •} Lowest <br />"------- Dio. of PLAN VIE W <br />t, <br />Construct cut-off 'r -_---, �- -- �2,. � 3. P�Pe 4"--� �•-- <br />i One Market Plaza <br />wall around the H <br />entire perimeter <br />3" <br />on for <br />r <br />---- class "a" concrete r Spear Street Tower <br />1 I base. Pre -cost base <br />C Toe of ; ; _used Suite 400 <br />' �channel slope C I - by may <br />eeD Director ofPPublic d Works <br />.�------- -- ----- -�-------------------------- _ ELEVATION <br />San Francisco <br />�= " ..- - — zo --- CA 94105 <br />B TOP VIEW A 6 Class B Concrete --- %� -:f. " NOTE A 1'-6" concrete cone may be used if approved by the Director j" If- 1 1/4" I 3 <br />/ of Public Works 1 f /4 IL 1 �8" <br />--- <br />Miter cut pipe --min-1--- <br />to fit flus <br />I <br />L <br />Tr <br />with slope <br />5' Min 5' Min �1 <br />Std. Frame & Cover » 1 1/4 <br />O <br />Mortar 1 Clear -1 3�8" 2 <br />, <br />�- 5�8„ <br />I I i <br />Match channel side slope `--- -� J t 1. I I V IV H - H (, I I N A - A , ._6»_ \ Flat slob shall be used when Architect,AlA <br />' • • depth does not permit use of I <br />2'—� PIPES LARGER THAN PIPES 24" TO 36" DIA. Max. taper unit 22 1/4" <br />Wire mesh 24" - Use precast H-20 load rated <br />Tech. Checked Tech. <br />' 6 DIA. �� � as manufactured by Tiechert Coord. Arch. <br />6'-0" � q <br />6" Min. or equal- SECTION A — A <br />NOTES: "�„ A- Frame shall be secured to riser or <br />Toe of chor.nel �,' H = 6'-0'� minimum Plot slob top With cement mortar <br />Slope H = 2 x pipe 'dia. (3' to 6') t The foundation shall be a minimum of 5' for 44" O.D. pipe and smaller <br />T_ NOTE: 1. Use CIaSS "B•' concrete Or 2. For pipe larger than 44' 0.0., the foundation shall extend o minimum <br />RUTHERFORD & CHEKENE <br />2' min. grouted cobbles as specified. of 8" beyond each side of the pipe NOTE: <br />FLAT SLAB TDP 303 Second St. suite 800 N. <br />8" 2. throughout <br />0. wire mesh Opening g ( Pipe) p pp Grate shall be fastened to frame San Francisco, CA 94107 <br />9 3 0 en,n to be 3' Ion x L0. ofwide, u to 36•' I.O. pipe with 18•• Of 1/4" hent -treated Chain <br />SECTION C - C throughout concrete For pipes larder than 35" L0 , opening to be 36" diameter or 3qucre. <br />36" EROSION CONTROL PIPE DISCHARGE'.26, SADDLE TYPE MANHOLE 16: STANDARD STORM DRAIN MANHOLE, ,6 FRAME & GRATE 0811 STORM DRAIN INLET! Structural Engineer <br />NOTES: GUTTMANN & MocRIT+CHIE <br />1. Frame and Grote shall conform to 631 Howard Street, Suite 500 --� San Francisco, CA 94105 <br />Standard Drawing No. C cf fh�s ✓rte` y 30` rain I <br />- _--�I.IfE1'E" AYE'/r3r7X <br />2 Two feet minimum below finished <br />T c i o of—i­5 a� i0 T.,CiG Gr7v6fS <br />grade in new development. In <br />Mechanical Engineer <br />F lowlinc: of <br />existing streets, may be less than __�� _. Ex '• ;= tj'' <br />2' with the approval of the engineer. gutter Joint on o ! <br />PP 9 Expansion _ <br />THE ENGINEERING ENTERPRISE <br />B-�----•t Point 5Gu/ru{ - Gf/EG/s U,qC✓6 ' . <br />Alameda, CA 94501 <br />�^14r111Es� O wEi�'T — _ --- Marina Village Parkway <br />A A Alam <br />--_- -_-- `Lj• I <br />Lip of gutter <br />Cotchbosin assembly to be set <br />tt Electrical Engineer <br />1' below flow tine of gutter _ - <br />` PLAN --- - —� - ---- <br />KJELDSEN-SINNOCK do ASSOCIATES, INC. <br />1113 West Fremont Street <br />4" throat N Stockton CA 95203 <br />opening �2 Min . 2 4" co �.�+/GPS ' <br />B � <br />Civil Engineer <br />PLAN VIEW 1in <br />bolt — <br />�_ — _ � /1.. Approvals <br />Boss to hold _-� ' • x �� <br />See note 1 grate in place GRATEXZ <br />" dia. cont. o" CA -.4- <br />, <br />1 �. dia. -_.._ <br />Mortar 24 <br />-•- / "" ` pipe (see note min. — - - <br />Grade Rings <br />d O 7 Z Mortar <br />C\4 <br />18 R.C.P., Cl_ III — <br />Nc: _ <br />na. 5) S= .01 -min. 25 1 <br />1 / 2" <br />2" <br />Boss? 4 O/ R <br />Q <br />TY <br />SECTION <br />NOTES: <br />1. All exposed steel shall be dipped with PLAN OF FRAME <br />2 coots of coal tar pitch heated to a <br />minimum of 180' or galvanized. <br />�- 2. Grate, frame and side inlet shall conform to _ Revisions <br />Mortar (typ.) I _ PINKERTON A-645 frame with either A-390 <br />p rivited or A -390-M fabricated steel grate. N C2 7- �' : No Date <br />;D Class "B" concrete S E C T I Q N B B 3. Gro#e shall be chained to frame. <br />4. Gra e shall be depressed 1" below gutter10 W11!2776Y <br />�J"f =¢ profile grade. /o�5- �•, �¢/9✓6SECTI0N A -A 5. 24" pipe barrel shall be class II R.C.P., or e <br />90% REVIEW 23--MAR--92 <br />class 2 or 3 reinforced concrete pipe. <br />38 18" STORM DRAIN INLET 2 CURB INLET CATCH BASIi�*$ 18 POINT OF CONNECTION (ROOF DRAIN) 8 VALVE BOX <br />-e?-0V/ <br />i <br />tr� ; -3�'� GflG'S5 - Cr7rUNEGT' <br />v� r� <br />4171-�WIIA�2GE sir_ nl; ' <br />fiw (Io T© .moo "- <br />1 ,7 <br />''�_ ls'hiUHoc:6 <br />19 TYP. MANHOLE BASE & CONE CONFIGURATION 9 SINGLE MANHOLE DETAIL <br />r• - �dArVi�'�G6 <br />-__------------._--- -- - -- - __.^__ __ SAN J O A Q U I N <br />GENERAL HOSPITAL <br />REPLACEMENT PROJECT, <br />a PHASE 1A <br />STORM DRAINAGE <br />I --- DETAILS <br />I <br />- .—. + -- - - -- -_- -- --- - Scale: <br />Project No. Drawing No. <br />53000.09 • <br />�v>s Cl -66 <br />Date <br />40 <br />30 20 10 DOUBLE MANHOLE DETAIL <br />. r✓ � .. �„ . ( �.`mac. �'. - T <br />_ <br />� 7 <br />t <br />na. 5) S= .01 -min. 25 1 <br />1 / 2" <br />2" <br />Boss? 4 O/ R <br />Q <br />TY <br />SECTION <br />NOTES: <br />1. All exposed steel shall be dipped with PLAN OF FRAME <br />2 coots of coal tar pitch heated to a <br />minimum of 180' or galvanized. <br />�- 2. Grate, frame and side inlet shall conform to _ Revisions <br />Mortar (typ.) I _ PINKERTON A-645 frame with either A-390 <br />p rivited or A -390-M fabricated steel grate. N C2 7- �' : No Date <br />;D Class "B" concrete S E C T I Q N B B 3. Gro#e shall be chained to frame. <br />4. Gra e shall be depressed 1" below gutter10 W11!2776Y <br />�J"f =¢ profile grade. /o�5- �•, �¢/9✓6SECTI0N A -A 5. 24" pipe barrel shall be class II R.C.P., or e <br />90% REVIEW 23--MAR--92 <br />class 2 or 3 reinforced concrete pipe. <br />38 18" STORM DRAIN INLET 2 CURB INLET CATCH BASIi�*$ 18 POINT OF CONNECTION (ROOF DRAIN) 8 VALVE BOX <br />-e?-0V/ <br />i <br />tr� ; -3�'� GflG'S5 - Cr7rUNEGT' <br />v� r� <br />4171-�WIIA�2GE sir_ nl; ' <br />fiw (Io T© .moo "- <br />1 ,7 <br />''�_ ls'hiUHoc:6 <br />19 TYP. MANHOLE BASE & CONE CONFIGURATION 9 SINGLE MANHOLE DETAIL <br />r• - �dArVi�'�G6 <br />-__------------._--- -- - -- - __.^__ __ SAN J O A Q U I N <br />GENERAL HOSPITAL <br />REPLACEMENT PROJECT, <br />a PHASE 1A <br />STORM DRAINAGE <br />I --- DETAILS <br />I <br />- .—. + -- - - -- -_- -- --- - Scale: <br />Project No. Drawing No. <br />53000.09 • <br />�v>s Cl -66 <br />Date <br />40 <br />30 20 10 DOUBLE MANHOLE DETAIL <br />. r✓ � .. �„ . ( �.`mac. �'. - T <br />_ <br />� 7 <br />