11"
<br />PLANT LIST
<br />KTX
<br />BOT ISN CAL NAME
<br />COMMON NAME
<br />SIZE
<br />FREES
<br />M.T.
<br />3'-4'
<br />3'-4'
<br />M.T.
<br />LAG MUS
<br />LAGERSTROEMIA
<br />CRAPE MYRTLE
<br />15
<br />GAL
<br />1 1/4"
<br />'MUSKOGEE'
<br />4'-5'
<br />M.T.
<br />7'-8'
<br />LAG NAT
<br />LAGERSTROEMIA
<br />CRAPE MYRTLE
<br />15
<br />GAL
<br />5'-6'
<br />'NATCHEZ'
<br />3/4"
<br />PURPLE -LEAF
<br />F.G. @ 3'-0" O.C./2 EA. HOLE
<br />LAG ZUN
<br />LAGERSTROEMIA
<br />CRAPE MYRTLE
<br />15
<br />GAL
<br />TRACHELOSPERMUM
<br />'ZUNI'
<br />1 GAL & LINERS @ 3'-0" O.C.
<br />PURPLE, RED
<br />JASMINOIDES
<br />PIS CHI
<br />PISTACIA CHINENSIS
<br />CHINESE
<br />15
<br />GAL
<br />(MALE)
<br />PISTACHE
<br />LAYOUT.
<br />QUE AGR
<br />QUERCUS AGRIFOLIA
<br />COAST LIVE OAK
<br />15
<br />GAL
<br />24"
<br />BOX
<br />QUE RUB
<br />QUERCUS RUBRA
<br />RED OAK
<br />15
<br />GAL
<br />SAP SEB
<br />SAPIUM SEBIFERUM
<br />CHINESE TALLOW
<br />15
<br />GAL
<br />TREE
<br />SEQ SEM
<br />SEQUOIA
<br />REDWOOD
<br />5 GAL
<br />SEMPERVIRENS
<br />'SOQUEL'
<br />SHRUBS
<br />RAP CLA RAPHIOLEPIS INDICA INDIA HAWTHORN 1 GAL
<br />HEIGHT SPREAD CALIPER
<br />3'-4'
<br />4'-5'
<br />M.T.
<br />3'-4'
<br />3'-4'
<br />M.T.
<br />3'-4'
<br />3'-4'
<br />M.T.
<br />7'-8'
<br />2'-3'
<br />1 1/4"
<br />7'-8'
<br />2'-3'
<br />1 1/4"
<br />54
<br />4'-5'
<br />M.T.
<br />7'-8'
<br />2'-3'
<br />1 1/4"
<br />7'-8'
<br />2'-3'
<br />1 1/4"
<br />5'-6'
<br />1'-6'
<br />3/4"
<br />n
<br />PLANTING NOTES
<br />1. ALL PLANTING BEDS EXCEPT FOR LAWN, HYDROSEEDED WILDFLOWER AREAS AND ANNUAL FLOWER
<br />AREAS TO RECEIVE 2" DEEP BARK MULCH.
<br />2. PLANT TREES AT MIN. OF 3'-0" FROM EDGE OF WALKS, WALLS, AND LIGHT FIXTURES EXCEPT WHERE
<br />DIMENSIONED OTHERWISE.
<br />3. FINAL LOCATION OF TREES SHALL BE APPROVED PRIOR TO PLANTING.
<br />4. REFER TO ELECTRICAL DWGS. FOR LIGHT FIXTURE TYPES AND SCHEDULE.
<br />5. FIVE CONSTRUCTION SUBPHASES HAVE BEEN IDENTIFIED FOR PHASE IA. (1A.1/1A.2/1A.3/1A.4/1A.5. REFER
<br />TO CIVIL PHASING PLAN C1.02) THE PLANTING AND IRRIGATION FOR PHASE IA SHALL BE PERFORMED IN 2
<br />SUBPHASES, PHASE IA.3 AND A COMBINED SUBPHASE 1A.4/1A.5. THE LANDSCAPE DRAWINGS INDICATE
<br />THESE TWO SUBPHASED AREAS OF CONSTRUCTION. THE MAINTENANCE PERIOD FOR SUBPHASE 1A.3
<br />SHALL BE CONTINUED UNTIL THE COMPLETION OF THE MAINTENANCE PERIOD FOR SUBPHASE 1A.4/1A.5.
<br />6. REFER TO CIVIL DEMOLITION PLANS FOR TREES TO BE REMOVED AND PLANTING AREAS TO BE
<br />PROTECTED.
<br />7. THE CONTRACTOR SHALL EXERCISE EXTREME CARE WHEN WORKING IN AREAS ADJACENT TO EXISTING
<br />PLANTING AND IRRIGATION TO REMAIN. EXISTING TREES, SHRUBS, LAWNS AND OTHER PLANT MATERIALS
<br />TO REMAIN SHALL BE PROTECTED AT ALL TIMES. IRRIGATION LINES SERVICING EXISTING PLANTING
<br />AREAS TO REMAIN SHALL BE CUT AND TEMPORARILY CAPPED DURING DEMOLITION AND RESTORED TO
<br />FULL OPERATION UNDER THIS CONTRACT, UNLESS SPECIFICALLY NOTED ON THE PLANS AS BEING
<br />OTHERWISE.
<br />8. CONTRACTOR SHALL PROVIDE TEMPORARY IRRIGATION IN THESE AREAS UNTIL IRRIGATION CAN BE
<br />FULLY RESTORED. EXISTING PLANT MATERIAL SHALL BE MAINTAINED IN A HEALTHY CONDITION, UNLESS
<br />OTHERWISE NOTED ON THE PLANS AS BEING REPLACED.
<br />ANNUAL FLOWER SCHEDULE
<br />ALL ANNUALS SHALL BE 4" POTS @ 8" O.C.
<br />BOTANICAL NAME
<br />'CLARA'
<br />BLOOM PERIOD
<br />LANDSCAPE LEGENDS, NOTES AND SCHEDULES
<br />PIT VAR
<br />PITTOSPORUM TOBIRA
<br />TOBIRA
<br />1 GAL
<br />X
<br />' VARIEGATA'
<br />PURPLE, WHITE
<br />X
<br />GROUNDCOVERS
<br />YELLOW, RUST,
<br />X
<br />'CUSHION MUMS'
<br />PURPLE
<br />COT DAM
<br />COTONEASTER
<br />BEARBERRY
<br />LINERS @ 4'-0" O.C.
<br />'CHAMPAGNE BUBBLES'
<br />DAMMERI
<br />COTONEASTER
<br />PHLOX DRUMMONDH 'TWINKLE'
<br />EUO COL
<br />EUONYMOUS
<br />PURPLE -LEAF
<br />F.G. @ 3'-0" O.C./2 EA. HOLE
<br />X
<br />FORTUNEI 'COLORATA'
<br />WINTER CREEPER
<br />L4.2
<br />TRA JAS
<br />TRACHELOSPERMUM
<br />STAR JASMINE
<br />1 GAL & LINERS @ 3'-0" O.C.
<br />PURPLE, RED
<br />JASMINOIDES
<br />ZINNIA 'PETER PAN'
<br />RED, WHITE,
<br />n
<br />PLANTING NOTES
<br />1. ALL PLANTING BEDS EXCEPT FOR LAWN, HYDROSEEDED WILDFLOWER AREAS AND ANNUAL FLOWER
<br />AREAS TO RECEIVE 2" DEEP BARK MULCH.
<br />2. PLANT TREES AT MIN. OF 3'-0" FROM EDGE OF WALKS, WALLS, AND LIGHT FIXTURES EXCEPT WHERE
<br />DIMENSIONED OTHERWISE.
<br />3. FINAL LOCATION OF TREES SHALL BE APPROVED PRIOR TO PLANTING.
<br />4. REFER TO ELECTRICAL DWGS. FOR LIGHT FIXTURE TYPES AND SCHEDULE.
<br />5. FIVE CONSTRUCTION SUBPHASES HAVE BEEN IDENTIFIED FOR PHASE IA. (1A.1/1A.2/1A.3/1A.4/1A.5. REFER
<br />TO CIVIL PHASING PLAN C1.02) THE PLANTING AND IRRIGATION FOR PHASE IA SHALL BE PERFORMED IN 2
<br />SUBPHASES, PHASE IA.3 AND A COMBINED SUBPHASE 1A.4/1A.5. THE LANDSCAPE DRAWINGS INDICATE
<br />THESE TWO SUBPHASED AREAS OF CONSTRUCTION. THE MAINTENANCE PERIOD FOR SUBPHASE 1A.3
<br />SHALL BE CONTINUED UNTIL THE COMPLETION OF THE MAINTENANCE PERIOD FOR SUBPHASE 1A.4/1A.5.
<br />6. REFER TO CIVIL DEMOLITION PLANS FOR TREES TO BE REMOVED AND PLANTING AREAS TO BE
<br />PROTECTED.
<br />7. THE CONTRACTOR SHALL EXERCISE EXTREME CARE WHEN WORKING IN AREAS ADJACENT TO EXISTING
<br />PLANTING AND IRRIGATION TO REMAIN. EXISTING TREES, SHRUBS, LAWNS AND OTHER PLANT MATERIALS
<br />TO REMAIN SHALL BE PROTECTED AT ALL TIMES. IRRIGATION LINES SERVICING EXISTING PLANTING
<br />AREAS TO REMAIN SHALL BE CUT AND TEMPORARILY CAPPED DURING DEMOLITION AND RESTORED TO
<br />FULL OPERATION UNDER THIS CONTRACT, UNLESS SPECIFICALLY NOTED ON THE PLANS AS BEING
<br />OTHERWISE.
<br />8. CONTRACTOR SHALL PROVIDE TEMPORARY IRRIGATION IN THESE AREAS UNTIL IRRIGATION CAN BE
<br />FULLY RESTORED. EXISTING PLANT MATERIAL SHALL BE MAINTAINED IN A HEALTHY CONDITION, UNLESS
<br />OTHERWISE NOTED ON THE PLANS AS BEING REPLACED.
<br />ANNUAL FLOWER SCHEDULE
<br />ALL ANNUALS SHALL BE 4" POTS @ 8" O.C.
<br />BOTANICAL NAME
<br />FLOWER COLOR
<br />BLOOM PERIOD
<br />LANDSCAPE LEGENDS, NOTES AND SCHEDULES
<br />Ll.l
<br />WIN SPR SUM FALL
<br />AGERATUM HOUSTONIANUM
<br />BLUE, WHITE
<br />X
<br />ANTIRRHINUM MAJUS 'CARIOCA'
<br />PURPLE, WHITE
<br />X
<br />CHRYSANTHEMUM MORIFOLIUM
<br />YELLOW, RUST,
<br />X
<br />'CUSHION MUMS'
<br />PURPLE
<br />IRRIGATION PLAN AREA 5
<br />PAPAVER NUDICAULE
<br />WHITE, ORANGE,
<br />X
<br />'CHAMPAGNE BUBBLES'
<br />YELLOW
<br />PLANTING PLAN AREA 2
<br />PHLOX DRUMMONDH 'TWINKLE'
<br />RED, WHITE, PINK
<br />X
<br />PRIMULA MALACOIDES
<br />PINK, WHITE,
<br />X
<br />L4.1
<br />LAVENDER
<br />L4.2
<br />VIOLA WITTROCKIANA
<br />WHITE, APRICOT,
<br />X
<br />PURPLE, RED
<br />ZINNIA 'PETER PAN'
<br />RED, WHITE,
<br />X
<br />YELLOW
<br />NOTE: CONTRACTOR SHALL VERIFY ANNUAL CHOICE WITH ARCHITECT PRIOR TO
<br />PLANTING. REFER TO DETAIL FOR
<br />LAYOUT.
<br />PLANTING . LEGEND
<br />o EXISTING TREE
<br />• TREE
<br />[•; R� TREE WITH ROOT BARRIER
<br />L4.2
<br />�• MULTI TRUNK TREE
<br />VINE
<br />OCP SHRUBS
<br />COTONEASTER DAMMERI
<br />EUONYMOUS FORTUNEI 'COLORATA'
<br />TRACHELOSPERMUM JASMINOIDES
<br />HYDRO SEEDED WILDFLOWERS - SEE SCHEDULE
<br />w �
<br />+- +- -Ft 4-+ ANNUAL FLOWERS -SEE ANNUAL FLOWER SCHEDULE
<br />+ -I-- +
<br />41
<br />C.:. SEEDED LAWN - SEE TURF SCHEDULE
<br />CRUSHED GRAVEL PAVING to II
<br />L /AU LITTER UNIT/ASH URN - SEE SPECS.
<br />PLANTING HOLE SCHEDULE
<br />ONTAINER SIZE
<br />SHRUBS:
<br />1 GALLON
<br />5 GALLON
<br />TREES:
<br />5 GALLON
<br />15 GALLON
<br />24" BOX
<br />WIDTH
<br />l'-6" ROUND
<br />2'-0" ROUND
<br />2'-0" ROUND
<br />3'-0" SQUARE
<br />4'-0" SQUARE
<br />1110191W19161
<br />AS DETAILED
<br />AS DETAILED
<br />AS DETAILED
<br />AS DETAILED
<br />AS DETAILED
<br />TURF SCHEDULE
<br />SOD: BLEND: 95% MINI MUSTANG
<br />5% ALPINE BLUEGRASS
<br />SEED: BLEND: 90% MINI MUSTANG
<br />5% ALPINE BLUEGRASS
<br />RATE OF APPLICATION: 8 POUNDS PER 1000 S.F.
<br />BOTH AVAILABLE FROM:
<br />DELTA BLUEGRASS CO. BUNYARD SOD FARM
<br />P.O. BOX 307 or P.O. BOX 591
<br />STOCKTON, CA 95201 SLOUGHHOUSE, CA 95683
<br />(800) 637-8873 (916) 354-0746
<br />EROSION CONTROL HYDROSEED SCHEDULE
<br />ENVIRONMENTAL SEED PRODUCERS, INC.
<br />P.O. BOX 2709
<br />LOMPOC, CA 93438
<br />(805) 735-8888
<br />SEED RATE OF APPLICATION
<br />CENTRAL VALLEY
<br />WILDFLOWER MIX 15 LB/ACRE
<br />ATRIPLEX GLAUCA 8 LB/ACRE
<br />LOTUS SCOPARIUS 4 LB/ACRE
<br />MIMULUS AURANTIACUS 4 LB/ACRE
<br />LANDSCAPE LIGHTING LEGEND
<br />SYMBOL FIXTURE TYPE*
<br />0-0-0 35' TALL LIGHT STANDARD (UNLESS HEIGHT OTHERWISE NOTED)
<br />O 15' TALL DECORATIVE LIGHT STANDARD
<br />12' TALL CUT-OFF LIGHT STANDARD
<br />• TREE UPLIGHT
<br />(b) BOLLARD LIGHT W/ CONCRETE PAD, SEE ELEC. DWG. FOR
<br />DETAIL
<br />_62L POLE W/CONCRETE PAD, SEE ELEC. DWG. FOR DETAIL
<br />*REFER TO ELECTRICAL DRAWINGS FOR FIXTURE SPECIFICATIONS AND
<br />FOOTING DETAILS. REFER TO CIVIL DRAWINGS FOR LOCATION OF
<br />LIGHT FIXTURES WITHIN PARKING LOTS.
<br />IRRIGATION LEGEND AND NOTES
<br />SEE SHEET 1-2.1 FOR IRRIGATION LEGEND
<br />SEE SHEET L4.0 FOR IRRIGATION NOTES
<br />0
<br />PHASING NOTES
<br />FIVE CONSTRUCTION SUBPHASES HAVE BEEN IDENTIFIED FOR PHASE IA.
<br />(1A.l/1A.2/1A.3/1A.4/1A.5. REFER TO CIVIL PHASING PLAN C1.02)
<br />THE PLANTING AND IRRIGATION FOR PHASE IA SHALL BE PERFORMED IN
<br />2 SUBPHASES, PHASE IA.3 AND A COMBINED SUBPHASE 1A.4/1A.5. THE
<br />LANDSCAPE DRAWINGS INDICATE THESE TWO SUBPHASED AREAS OF
<br />CONSTRUCTION. THE MAINTENANCE PERIOD FOR SUBPHASE 1A.3 SHALL
<br />BE CONTINUED UNTIL THE COMPLETION OF THE MAINTENANCE PERIOD
<br />FOR SUBPHASE 1A.4/1A.5.
<br />LAYOUT LEGEND
<br />SM SCORE MARK (REFER TO CIVIL DWGS FOR LOCATION)
<br />EJ EXPANSION JOINT (REFER TO CIVIL DWGS FOR LOCATION)
<br />TYP TYPICAL
<br />EQ EQUAL
<br />R RADIUS
<br />FOB FACE OF BUILDING
<br />CENTERLINE
<br />ALIGN
<br />o PRECAST CONCRETE BOLLARD
<br />HANDICAPPED RAMP
<br />CONCRETE PAVING - BROOM FINISH. SEE CIVIL DWGS.
<br />RWD HDR REDWOOD HEADER
<br />(E) EXISTING CONCRETE PAVING TO REMAIN.
<br />MB Mm METAL BENCH - SEE SPECS.
<br />BIKE RACK - SEE SPECS
<br />LAYOUT NOTES
<br />1. REFER TO CIVIL DRAWINGS FOR EXPANSION JOINTS, CONSTRUCTION
<br />JOINTS AND SCOREMARK LOCATIONS IN CONCRETE PAVING.
<br />2. REFER TO CIVIL DRAWINGS FOR CONCRETE PAVING DETAILS.
<br />3. REFER TO CIVIL DRAWINGS C1.13 THRU C1.19 FOR STATION POINT
<br />BASE LOCATIONS.
<br />4. UNLESS OTHERWISE NOTED ON THE LAYOUT PLAN, LIGHT FIXTURES
<br />SHALL BE 2'-6" BEHIND FACE OF CURB OR FROM EDGE OF WALK.
<br />5. DIMENSIONS ARE TO FACE AT WALL, FACE OF CURB, COLUMN LINE,
<br />OR PROPERTY LINE, UNLESS OTHERWISE NOTED.
<br />6. ALL LIGHT FIXTURE LOCATIONS TO BE APPROVED BY ARCHITECT
<br />PRIOR TO INSTALLATION.
<br />7. REFER TO CIVIL DRAWINGS FOR LOCATION OF LIGHT FIXTURES
<br />WITHIN THE PARKING LOT.
<br />8. FOR DETAILS AND LOCATION OF STREET CURBS AND GUTTERS, REFER
<br />TO CIVIL DRAWINGS.
<br />9. REFER TO CIVIL DRAWINGS FOR UTILITIES, FINISH GRADING PLANS,
<br />PARKING LOT STRIPING, AND ADDITIONAL SIGNAGE LOCATIONS.
<br />10. REFER TO ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR LIGHT
<br />FIXTURE TYPE, MODEL NUMBER AND DETAILS.
<br />11. REFER TO CIVIL DEMOLITION PLANS FOR DEMOLITION
<br />REQUIREMENTS.
<br />12. REFER TO CIVIL DRAWINGS AND SPECIFICATIONS FOR FINISH GRADES
<br />OF ALL CONCRETE PAVING.
<br />LIST OF DRAWINGS: PHASE 1A
<br />SHEET
<br />DRAWING TITLE
<br />L0.
<br />LANDSCAPE LEGENDS, NOTES AND SCHEDULES
<br />Ll.l
<br />LANDSCAPE LAYOUT PLAN AREA 1
<br />L1.2
<br />LANDSCAPE LAYOUT PLAN AREA 2
<br />L1.3
<br />LANDSCAPE LAYOUT PLAN AREA 5
<br />LIA
<br />LANDSCAPE LAYOUT PLAN AREA 7
<br />L2.1
<br />IRRIGATION PLAN AREA 1& LEGEND
<br />L2.2
<br />IRRIGATION PLAN AREA 2
<br />L2.3
<br />IRRIGATION PLAN AREA 5
<br />L2.4
<br />IRRIGATION PLAN AREA 7
<br />L3.1
<br />PLANTING PLAN AREA 1
<br />L3.2
<br />PLANTING PLAN AREA 2
<br />L3.3
<br />PLANTING PLAN AREA 5
<br />L3.4
<br />PLANTING PLAN AREA 7
<br />L4.0
<br />IRRIGATION DETAILS & NOTES
<br />L4.1
<br />IRRIGATION DETAILS
<br />L4.2
<br />PLANTING & CONSTRUCTION DETAILS
<br />L4.3
<br />CONSTRUCTION DETAILS
<br />Stone
<br />Marracc ini
<br />Patterson
<br />Architecture
<br />Planning
<br />Interior Architecture
<br />One Market Plaza
<br />Spear Street Tower
<br />Suite 400
<br />San Francisco
<br />CA 94105
<br />415 227-0100
<br />Architect,AIA
<br />Tech. Checked Tech.
<br />Coord. Arch.
<br />RUTHERFORD & CHEKENE
<br />303 Second St. Suite 800 N.
<br />San Francisco, CA 94107
<br />Structural Engineer
<br />GUTMANN & MacRITCHIE
<br />1300 Sutter Street
<br />San Francisco, CA 94109
<br />Mechanical Engineer
<br />THE ENGINEERING ENTERPRISE
<br />1305 Marina Village Parkway
<br />Alameda, CA 94501
<br />Electrical Engineer
<br />MPA DESIGN
<br />562 Mission Street
<br />San Francisco, CA 94105
<br />Landscape Architect
<br />Approvals
<br />Revisions
<br />Date
<br />90`/c RF,VII''M 23 MAR 92
<br />SAN JOAQUIN
<br />GENERAL HOSPITAL
<br />REPLACEMENT PROJECT
<br />PHASE 1A
<br />LANDSCAPE LEGENDS, NOTES
<br />AND SCHEDULES
<br />Scale:
<br />Project No. Drawing No.
<br />53000.09
<br />Date LOS
<br />
|