My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7731 - SP7741
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP7508 -
>
SP7731 - SP7741
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 10:16:38 AM
Creation date
4/24/2024 1:09:24 PM
Metadata
Fields
Template:
Small Plans - SP
Project
West Country Club Reconstruction, Phase 8
Limits
Princeton Avenue: Wisconsin Avenue to Kirk Avenue
Year
2017
Roads Worked
Princeton Ave.
Red Lines
Yes
Project #
221615
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7731 - SP7741
Description
JOC - 05
Type
Reconstruction
Document Relationships
Country Club Northwest
(Message)
Path:
\VAULT MAPS\*CARD CATALOG*\CO - CQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ADJUST FRAME AND COVER <br />(STORM DRAIN MAINTENANCE HOLE) <br />Location Quantity (EA) <br />Sta 14+43 (18' Rt) 1 <br />Sto 19+62 (18' Rt) 1 <br />Total 2 <br />ADJUST FRAME AND GRATE (STORM DRAIN INLET) <br />I Location Quantity (EA) <br />ROADWAY EXCAVATION <br />Location <br />Sta 10+14 to Sta 19+71 <br />Sto 19+92 to Sta 28+54 <br />CLASS 2 AGGREGATE BASE <br />Location Quantity (TON) <br />Sto 10+14 to Sta 19+71 1,319 <br />Sta 19+92 to Sta 28+54 1,207 <br />Total 2,526 <br />COUNTY OF SAN JOAQUIN <br />7777 <br />DRAWN BY DATE PROJECT ENGINEER <br />Jonathan Curry1 05/17 <br />REMOVING CONCRETE <br />Location Quantity (SQYD) <br />Sta 10+18 to Sta 10+56 (Rt) CG&S 27 <br />Sta 10+55 to Sto 11+01 (Lt) CG&S 31 <br />Sta 10+56 to Sto 19+49 (Rt) CG&S 595 <br />Sta 10+64 to Sto 10+67 (Rt) Walkway 3 <br />Sta 11+37 to Sta 11+49 (Rt) Driveway 9 <br />Sta 12+04 to Sta 12+34 (Lt) CG&S 20 <br />Sta 12+17 to Sta 12+39 (Rt) Driveway 24 <br />Sta 12+85 to Sta 12+94 (Rt) Driveway 10 <br />Sta 13+45 to Sta 13+57 (Lt) CG&S 8 <br />Sto 13+56 to Sta 13+66 (Rt) Driveway 2 <br />Sta 14+25 to Sta 14+43 (Rt) Driveway n r, -� _ 6 <br />Sta 14+56 to Sta 14+59 (Lt) CG&S o <br />' 2 <br />�. r <br />Sta 14+82 to Sta 14+85 (Rt) Walkway, -pM 2 <br />Sta 15+19 to Sta 15+31 (Rt) Driveway — ^ 8 <br />Sta 15+30 to Sta 15+36 (Lt) CG&S qt ; m 4 4 <br />Sta 15+73 to Sta 16+52 (Lt) CG&S Q 53 <br />Sta 15+83 to Sto 15+86 (Lt) Walkway m 3 3 <br />Sta 15+86 to Sta 16+03 (Lt) Driveway m 17 <br />Sta 15+92 to Sta 16+06 (Rt) Driveway 16 <br />Sta 16+14 to Sto 16+26 (Rt) Driveway 12 2 <br />Sta 16+38 to Sta 16+52 (Lt) Driveway _, <br />Sta 16+38 to Sta 16+41 (Rt) Walkway m k 3 <br />Sta 16+54 to Sto 16+80 (Rt) Driveway z to> 12 <br />Sta 16+76 to Sto 17+08 (Lt) CG&S v� 21 <br />Sta 16+88 to Sto 17+08 (Lt) Driveway :: 9 <br />Sta 17+28 to Sta 17+48 (Rt) Driveway ��^ 22 <br />Sta 17+50 to Sto 17+63 (Rt) Driveway .. Z 14 <br />Sta 18+04 to Sta 18+16 (Rt) Driveway a 7 <br />Sta 18+38 to Sto 18+50 (Rt) Driveway x' � 5 <br />Sto 18+85 to Sta 18+88 (Rt) Walkway 1 <br />Sto 19+49 to Sto 19+64 (Rt) Curb Ramp �� 9 <br />Sta 19+97 to Sta 20+12 (Lt) Curb Ramp 9 <br />Sta 20+67 to Sto 21 +39(Rt� CG&S 48 <br />Sta 20+78 to Sta 21+91 (Lt CG&S 75 <br />Sto 21+57 to Sto 21+67 (Lt) Driveway 4 <br />Sta 22+05 to Sta 22+11 (Lt) CG&S 4 <br />Sto 22+56 to Sta 23+85 (Rt) CG&S 19 <br />Sta 22+56 to Sta 22+69 (Rt) Driveway 4 <br />Sta 22+91 to Sta 22+97 (Lt) CG&S 4 <br />Sta 23+21 to Sta 23+81 (Rt) CG&S 40 <br />Sta 23+25 to Sta 23+39 (Rt) Driveway 8 <br />Sta 23+47 to Sto 23+60 (Rt) Driveway 6 <br />Sto 24+94 to Sto 26+06 (Rt) CG&S 75 <br />Sto 25+14 to Sto 25+24 (Rt) Driveway 8 <br />(continued on next column) <br />NO SCALE I SUMMARY OF QUANTITIES <br />DATE CHECKED DATE <br />REMOVING CONCRETE <br />Location <br />(CURB, <br />MINOR CONCRETE <br />GUTTER AND SIDEWALK) <br />Quantity <br />(SQYD) <br />(continued from previous column) <br />Curb Type Quantity <br />Sta <br />25+52 <br />to <br />Sta <br />25+56 <br />(Rt) <br />Walkway <br />4 <br />Sta <br />25+74 <br />to <br />Sta <br />26+00 <br />(Rt) <br />Driveway <br />29 <br />Sta <br />26+97 <br />to <br />Sta <br />27+03 <br />(Lt) <br />CG&S <br />4 <br />Sta <br />27+16 <br />to <br />Sta <br />28+37 <br />(Rt) <br />CG&S <br />81 <br />Sta <br />27+37 <br />to <br />Sta <br />27+53 <br />(Rt) <br />Driveway <br />5 <br />Sto <br />27+77 <br />to <br />Sta <br />27+88 <br />(Rt) <br />Walkway <br />5 <br />Total 1,396 <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity (TON) <br />Mainline Resurfacing 1,310 <br />Total 1,310 <br />WEST COUNTRY CLUB RECONSTRUCTION, PHASE 8 I Sheet No. <br />(Princeton Avenue: Wisconsin Avenue to Kirk Avenue) 11 of 11 <br />(CURB, <br />MINOR CONCRETE <br />GUTTER AND SIDEWALK) <br />Location <br />Curb Type Quantity <br />(LF) <br />Sto <br />10+18 <br />to <br />Sta <br />10+56 <br />(Rt) <br />S <br />41 <br />Sto <br />10+33 <br />to <br />Sta <br />10+55 <br />(Lt) <br />S <br />22 <br />Sto <br />10+55 <br />to <br />Sta <br />11+01 <br />(Lt) <br />S <br />46 <br />Sto <br />10+56 <br />to <br />Sto <br />19+49 <br />(Rt) <br />Roll <br />893 <br />Sto <br />12+04 <br />to <br />Sta <br />12+34 <br />(Lt) <br />S <br />30 <br />Sto <br />13+45 <br />to <br />Sta <br />13+57 <br />(Lt) <br />S <br />12 <br />Sto <br />14+56 <br />to <br />Sta <br />14+59 <br />(Lt) <br />S <br />3 <br />Sta <br />15+30 <br />to <br />Sta <br />15+36 <br />(Lt) <br />S <br />6 <br />Sta <br />15+73 <br />to <br />Sta <br />16+52 <br />(Lt) <br />Roll <br />79 <br />Sta <br />16+76 <br />to <br />Sta <br />17+08 <br />(Lt) <br />S <br />32 <br />Sta <br />19+49 <br />to <br />Sta <br />19+64 <br />(Rt) <br />S <br />20 <br />Sta <br />19+97 <br />to <br />Sta <br />20+12(Lt) <br />S <br />20 <br />Sta <br />20+67 <br />to <br />Sta <br />21+39 <br />Rt <br />Roll <br />72 <br />Sta <br />20+78 <br />to <br />Sta <br />21+91 <br />(Lt) <br />Roll <br />113 <br />Sto <br />22+05 <br />to <br />Sto <br />22+11 <br />(Lt) <br />S <br />6 <br />Sta <br />22+56 <br />to <br />Sta <br />22+85 <br />(Rt) <br />S <br />29 <br />Sta <br />22+91 <br />to <br />Sta <br />22+97 <br />(Lt) <br />S <br />6 <br />Sta <br />23+21 <br />to <br />Sta <br />23+81 <br />(Rt) <br />Roll <br />60 <br />Sta <br />24+94 <br />to <br />Sta <br />26+06 <br />(Rt) <br />Roll <br />112 <br />Sta <br />26+97 <br />to <br />Sta <br />27+03 <br />(Lt) <br />S <br />6 <br />Sta <br />27+13 <br />to <br />Sta <br />28+37 <br />(Rt) <br />Roll <br />121 <br />Total <br />1,729 <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity (TON) <br />Mainline Resurfacing 1,310 <br />Total 1,310 <br />WEST COUNTRY CLUB RECONSTRUCTION, PHASE 8 I Sheet No. <br />(Princeton Avenue: Wisconsin Avenue to Kirk Avenue) 11 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.